List of power stations in Pakistan
This is a list of Power Stations in Pakistan. Pakistan had a total installed power generation capacity of over 30 GW by March 2018. However, dependable or de-rated capacity is approximately 19 GW during the year, due to variety of factors, whereas demand for electricity is increasing at an average annual rate of eight per cent. And according to World Energy Statistics 2011, published by IEA, Pakistan's per capita electricity consumption is one-sixth of the World Average. World average per capita electricity consumption is 2730 kWh compared to Pakistan's per capita electricity consumption of 451 kWh. International Energy Agency has forecast that total electricity demand of the country will be 49,078 MW in 2025.[1]
Pakistan has an installed electricity generation capacity of 25,100 MW in 2017.[2] The average demand is 22,000 MW and the shortfall was between 5,000 and 6,000 MW. Oil (35.2 per cent), hydel (29.9 per cent), gas (29 per cent), and nuclear, solar and imported (6 per cent) are the principal sources. In the next 10 years, peak electricity demand is expected to rise by four to five per cent, which is roughly 1,500 MW. This dismal forecast is due to a lopsided energy mix, diminishing indigenous fuel reserves, increasing circular debt and transmission hold-ups. Pakistan has almost exhausted its gas reserves. Imported oil's price hikes affect the budget and its constant supply cannot be guaranteed. Pakistan has the potential to meet these energy challenges through hydroelectric power, but there are political and environmental issues in building dams. Rationality demands reducing reliance on oil and going for alternatives. The development of alternatives does not happen overnight. Pakistan will have to rely on imported fuels for the interim period at a huge cost. LNG is difficult to import, using coal has environmental issues, using shale gas also has environmental issues attached with it, and wind power has transmission network challenges.[3] With total estimated coal reserves of over 186bn tonnes, Pakistan ranks sixth among coal-rich countries. Yet, coal's potential has not been exploited adequately.[4]
Thermal
In service
Station | Location | Coordinates | Capacity (MW) | In-service Date | Notes | Refs |
---|---|---|---|---|---|---|
Kot Addu Power Company | Kot Addu, Punjab | 1,600 | Multi Fuel-Fired Thermal Station. | |||
Hub Power Company | Hub, Balochistan | 24°54′21″N 66°41′41″E / 24.9057°N 66.6946°E | 1,292 | Furnace Oil Fired Plant. | ||
Hubco Narowal Power Plant | Narowal, Punjab | 32.059067, 74.781222, | 225 | Furnace Oil Fired Plant. | ||
Nishat Power Ltd | Lahore, Punjab | 31.122560, 73.905405 | 200 | Furnace Oil Fired Plant. | ||
Nishat Chunian Power Ltd | Lahore, Punjab | 200 | Furnace Oil Fired Plant. | |||
Saba Power Company Ltd | Sheikhupura, Punjab | 31.733013, 73.873654 | 125 | Furnace Oil Fired Plant. | ||
Southern Electric Power Company Ltd | Raiwind, Lahore | 31.291388, 74.249188 | 136 | Furnace Oil Fired Plant. | ||
Tapal Energy Ltd | Karachi, Sindh | 24.999713, 66.906860 | 126 | Furnace Oil Fired Plant. | ||
Japan Power Generation Pvt Ltd | Raiwind, Punjab | 31.325566, 74.262225 | 135 | Furnace Oil Fired Plant. | ||
Kohinoor Energy Ltd | Lahore, Punjab | 31.263200, 74.187321 | 131 | Furnace Oil Fired Plant. | ||
Liberty Power Tech | Faisalabad, Punjab | 200 | Furnace Oil Fired Plant. | |||
AES Lal Pir Power | Muzaffargarh, Punjab | 30°06′19″N 71°09′49″E / 30.10528°N 71.16361°E | 362 | Furnace Oil Fired Plant. | ||
AES PakGen | Muzaffargarh, Punjab | 30°06′19″N 71°09′49″E / 30.10528°N 71.16361°E | 365 | Furnace Oil Fired Plant. | ||
Jamshoro Power Station | Jamshoro, Sindh | 25°28′20″N 68°15′58″E / 25.47222°N 68.26611°E | 850 | Oil and Natural Gas-Fired Thermal Station. | ||
Bin Qasim Power Plant I | Karachi, Sindh | 24.785546, 67.358929 | 1,260 | Oil and Natural Gas-Fired Thermal Station | ||
Sitara Energy Ltd | Faisalabad, Punjab | 31.533111, 73.393330 | 85 | Diesel and Natural Gas Fired Plant. | ||
Saif Power Ltd | Sahiwal, Punjab | 30.696164, 73.260541 | 225 | Diesel and Natural Gas Fired Plant. | ||
Attock Refinery Ltd | Rawalpindi, Punjab | 33.5575853,73.0766997 | 18 | Heavy Fuel Oil | ||
Atlas Power Ltd | Sheikhpura, Punjab | 225 | Heavy Fuel Oil | |||
Attock Gen Limited (AGL) | Rawalpindi, Punjab | 33.5575853,73.0766997 | 165 | Residual Furnace Oil Fired Plant. |
Natural Gas
In service
Station | Location | Coordinates | Capacity (MW) | In-service Date | Notes | Refs |
---|---|---|---|---|---|---|
Guddo Thermal Power Plant | Guddu, Sindh | 28°25′38″N 69°41′49″E / 28.42722°N 69.69694°E | 2,402 | Combined Cycle Power Plant | ||
Foundation Power Company Daharki Ltd | Daharki, Sindh | 27.985137, 69.673544 | 185 | Combined Cycle Power Plant | ||
Uch-I, II Power Plant | Dera Murad Jamali, Balochistan | 28.582798, 68.171539 | 1000 | Combined Cycle Power Plant | ||
Nandipur Power Project | Gujranwala, Punjab | 32.245294, 74.270007 | 425 | Combined Cycle Power Plant | ||
Habibullah Coastal Power Pvt Company | Quetta, Balochistan | 140 | Combined Cycle Power Plant | |||
WAPDA Quetta Thermal Power Station | Quetta, Balochistan | 30°26′38″N 66°59′49″E / 30.44389°N 66.99694°E | 35 | Combined Cycle Power Plant | ||
Liberty Power Project | Daharki, Sindh | 235 | Combined Cycle Power Plant | |||
Pakistan Power Plant | Kabirwala, Punjab | 30°34′06″N 72°08′24″E / 30.56833°N 72.14000°E | 450 | Combined Cycle Power Plant | ||
Engro Powergen Qadirpur Ltd | Ghotki, Sindh | 28°01′37″N 69°21′47″E / 28.02694°N 69.36306°E | 227 | Combined Cycle Power Plant | ||
Halmore Power Generation Company Ltd | Sheikhupura, Punjab | 225 | Combined Cycle Power Plant | |||
Orient Power Company Ltd | Kasur, Punjab | 229 | Combined Cycle Power Plant | |||
Saif Power Limited | Sahiwal, Punjab | 229 | Combined Cycle Power Plant | |||
Bin Qasim Power Plant II | Karachi, Sindh | 24.781873, 67.359767 | 560 | Combined Cycle Power Plant | ||
Fauji Kabirwala Power Company | Kabirwala, Punjab | 30.524865, 71.954946 | 157 | Combined Cycle Power Plant | ||
Sapphire Electric Company Ltd | Muridke, Punjab | 234 | Combined Cycle Power Plant | |||
Sindh Nooriabad Power Company Pvt Ltd | Jamshoro, Sindh | 100 | Combined Cycle Power Plant | |||
Haveli Bahadur Shah Power Plant | Jhang, Punjab | 1,230 | Combined Cycle Power Plant | |||
Bhikki RLNG-based Power Project | Sheikhupura, Punjab | 1,180 | Combined Cycle Power Plant | |||
Balloki Power Plant | Balloki, Punjab | 1,223 | Combined Cycle Power Plant | |||
Altern Energy Ltd | Fateh Jang, Punjab | 32 | Combined Cycle Power Plant |
Under construction or proposed
Station | Location | Capacity (MW) | Status |
---|---|---|---|
Punjab Power Plant | Jhang, Punjab | 1263 | Under construction. To be operational by Feb 2019.[5] |
Coal
In Service
Station | Location | Capacity (MW) | In-Service Date | Notes |
---|---|---|---|---|
Lakhra Power Plant | Jamshoro, Sindh | 150 | Operational | |
Sitara Chemical Industries Ltd | Faisalabad, Punjab | 40 | Sep 2016 | |
Fauji Fertilizer Power Plant | Karachi, Sindh | 118 | Feb 2017 | |
Sahiwal Coal Power Project | Sahiwal, Punjab | 1320 | May 2017 | |
Maple Leaf Power Ltd | Mianwali, Punjab | 40 | Oct 2017 | |
Port Qasim Coal Power Project | Karachi, Sindh | 1320 | Nov 2017 | |
DG Cement Coal Power Project | DG Khan, Punjab | 30 | Dec 2017 |
Under Construction and Proposed
Station | Location | Capacity (MW) | Notes |
---|---|---|---|
Engro Energy Ltd | Tharparkar, Sindh | 660 | Under construction. To be operational by Dec 2018.[6] |
Hub Coal Power Project | Hub, Balochistan | 1320 | Under construction. To be operational by Aug 2019.[7] |
ThalNova Power Pvt Ltd | Tharparkar, Sindh | 330 | Under construction. To be operational by Mar 2021.[8] |
Thar Energy Ltd | Tharparkar, Sindh | 330 | Under construction. To be operational by Mar 2021.[8] |
Lucky Electric Power | Karachi, Sindh | 660 | Under construction. To be operational by Mar 2021.[9] |
Siddiqsons Energy Ltd | Tharparkar, Sindh | 330 | Under construction. To be operational by Jun 2021.[9] |
Gwadar Coal Power Project | Gwadar, Balochistan | 300 | LOI issued.[10][10] |
Hydroelectricity
In service
Station | Community | Location | Capacity (MW) | In-Service Date | Status |
---|---|---|---|---|---|
Tarbela Dam | Tarbela, KPK | 34°05′23″N 72°41′54″E / 34.08972°N 72.69833°E | 4,888 | 1974 | |
Ghazi-Barotha Hydropower Project | Attock, Punjab | 33°46′48″N 72°15′35″E / 33.78000°N 72.25972°E | 1,450 | 2002 | |
Mangla Dam | Mirpur, Azad Kashmir | 33°08′31″N 73°38′42″E / 33.14194°N 73.64500°E | 1,150 | 1967 | Mangla Refurbishment Project is under construction wherein the generating units of Mangla Hydel Power Station will be refurbished by closing down one tunnel (two generating units) at a time. First two units will be refurbished by December 2018, the next two by December 2019 and the other two by December 2020.Refurbishment of all the 10 generating units will be completed by the year 2024. After undergoing refurbishment project is completed capacity will increase by another 310 MW. |
Neelum–Jhelum Hydropower Plant | Muzaffarabad, Azad Kashmir | 34°23′34″N 73°43′08″E / 34.39278°N 73.71889°E | 969 | 2018 | |
Warsak Dam | Peshawar, KPK | 34°09′50″N 71°21′29″E / 34.16389°N 71.35806°E | 243 | 1960 | Operational since 1960. Extension and rehabilitation is being planned. The total cost of the rehabilitation project €162 million is being co-financed with the KfW (€40 million), EIB (€4.5 million), AFD (€41.5 million) and Pakistan government contributions. |
Chashma Barrage | Chashma, Punjab | 184 | 2001 | ||
Allai Khwar Hydropower Project | Mansehra, KPK | 121 | 2013 | ||
Golen Gol Hydropower Project | Chitral, KPK | 108 | 2018 | [11] | |
New Bong Escape Hydropower Plant | Mirpur, Azad Kashmir | 84 | 2013 | ||
Patrind Hydropower Plant | Muzaffarabad, Azad Kashmir | 150 | 2017 | ||
Khan Khwar Hydropower Project | Shangla, KPK | 72 | 2012 | ||
Duber Khwar Hydropower Project | Kohistan, KPK | 130 | 2013 | ||
Jinnah hydropower project | Jinnah Barrage, Punjab | 96 | 2013 | ||
Jagran-I Dam | Neelum, Azad Kashmir | 34°36′1.52″N 73°45′44.20″E / 34.6004222°N 73.7622778°E | 30.4 | 2000 | |
Gomal Zam Dam | South Waziristan | 17.4 | 2013 | ||
Satpara Dam | Skardu | 17.3 | 2012 | ||
Rasul Barrage Hydropower Project | Mandi Bahauddin, Punjab | 32°40′49″N 73°31′15″E / 32.68028°N 73.52083°E | 22 | 1952 | |
Jabban Hydropower Plant | Malakand, KPK | 22 | 1935 | ||
Dargai Hydropower Plant | Malakand, KPK | 20 | 1953 | ||
Malakand-III Hydropower Project | Malakand, KPK | 81 | 2008 | ||
Shadiwal Hydropower Plant | Shadiwal Warriach, Punjab | 13.5 | 1961 | ||
Chichonki Malian Hydropower Plant | Sheikhupura, Punjab | 13.2 | 1959 | ||
Nandipur Hydropower Plant | Gujranwala, Punjab | 13.8 | 1963 | ||
Marala Hydropower Project | Sialkot, Punjab | 8 | 2017 | ||
Nalter-II Hydropower Project | Naltar Valley, Gilgit-Baltistan | 2.28 | Operational. | ||
Naltar-IV Hydropower Plant | Naltar Valley, Gilgit-Baltistan | 18 | 2007 | ||
Naltar-V Hydropower Project | Naltar Valley, Gilgit-Baltistan | 14.4 | 2016 | ||
Kurram Garhi Hydropower Plant | Kurram Garhi, KPK | 4 | 1958 | ||
Reshun Dam | Chitral | 4.5 | 1991 | ||
Renala Khurd Hydropower Plant | Renala Khurd, Punjab | 1.1 | 1925 | ||
Darawat Dam | Jamshoro, Sindh | 0.45 | 2014 | ||
Machai Dam | Mardan, KPK | 1 | Operational. | ||
Ranolia Hydropower Plant | Kohistan, KPK | 17 | 2016 | ||
Machai Hydropower Plant | Mardan, KPK | 2.6 | 2017 | Operational since 2017. | |
Daral Khwar Hydropower Plant | Swat District, KPK | 36.6 | 2018 | Operational since 2018. | |
Chashma Dam | Chashma, Punjab | 1.2 | 2000 | Operational since 2000. | |
Kathai Dam | Muzaffarabad, Azad Kashmir | 3.2 | 1995 | Operational since 1995. | |
Kundal Shahi Hydropower Project | Neelam Valley, Gilgit-Baltistan | 2 | 1992 | Operational since 1992. | |
Kel Htdropower Project | Muzaffarabad, Azad Kashmir | 0.45 | Operational. | ||
Leepa Dam | Muzaffarabad, Azad Kashmir | 2 | Operational. | ||
Pehur Dam | Pehur, KPK | 18 | 2012 | Operational since 2012. | |
Sishi Dam | Chitral, KPK | 2 | Operational. | ||
Jari Dam | Mirpur, Azad Kashmir | 1 | Operational. | ||
Chitral Hydel Power Station | Lutkho River, Chitral | 1 | 1975 | ||
Singul Dam | Gilgit-Baltistan | 1.2 | Operational. | ||
Pion Dam | Gah | 1 | Operational. | ||
Sermik Dam | Skardu | 1 | Operational. | ||
Basho-I Dam | Skardu | 1 | Operational. | ||
Tormik-I Dam | Roundu Valley, Gilgit-Baltistan | 1 | Operational. | ||
Haramosh Dam | Gilgit-Baltistan | 1 | Operational. | ||
Bubind Dam | Astore | 0.64 | Operational. | ||
Gilgit Dam | Gilgit-Baltistan | 10.63 | Operational. | ||
Skardu-I Dam | Skardu | 6.96 | Operational. | ||
Skardu-II, III Dams | Skardu | 1.64 | Operational. | ||
Chilas-I Dam | Chilas | 5.62 | Operational. | ||
Hunza Dam | Hunza Valley, Gilgit-Baltistan | 5.13 | Operational. | ||
Shyok Dam | Shyok Valley, Gilgit-Baltistan | 4.85 | Operational. | ||
Astore Dam | Astore | 3.11 | Operational. | ||
Kachura-II Dam | Skardu | 3 | Operational. | ||
Ghizar Dam | Ghizer District, Gilgit-Baltistan | 2 | Operational. | ||
Thak Dam | Chilas | 2.00 | Operational. | ||
Phandar Dam | Ghizer District, Gilgit-Baltistan | 2 | Operational. | ||
Bordas Dam | Ghanche | 2 | Operational. | ||
Kharmang Dam | Kharmang Valley, Gilgit-Baltistan | 1.89 | Operational. | ||
Yasin Dam | Ghizer District, Gilgit-Baltistan | 1.61 | Operational. | ||
Bunnar Chilas Dam | Diamer District, Gilgit-Baltistan | 1.5 | Operational. | ||
Roundu Dam | Roundu Valley, Gilgit-Baltistan | 1.52 | Operational. | ||
Kar Gah-I, II, III, IV, V, VI, VII Hydropower Project | Gilgit-Baltistan | 13.34 | Operational. | ||
Hisper-I Dam | Nager Valley | 1 | Operational. | ||
Naz Bar Dam | Yasin Valley | 1 | Operational. | ||
Jaglot-I, II Hydodropower Project | Jaglot | 1.32 | Operational. | ||
Chalt Dam | Nagar Valley | 1 | Operational. | ||
Khyber-I, II Dams | Gilgit-Baltistan | 2 | Operational. | ||
Shigar Dam | Skardu | 1 | Operational. | ||
Shirting Dam | Skardu | 1 | Operational. | ||
Sher Qila Dam | Gilgit-Baltistan | 1.11 | Operational. | ||
Parishing/Louse | Astore | 1 | Operational. | ||
Darel-I, II Dams | Ghanche | 1.2 | Operational. | ||
Bunner Dam | Chilas | 1 | Operational. | ||
Tangir Dam | Chilas | 1 | Operational. | ||
Dunsam power station | Ghanche, Gilgit-Baltistan | ||||
Boladas-I Dam | Hunza Valley, Gilgit-Baltistan | 0.64 | Operational. | ||
Khunjerab Dam | Gujrab River | 0.59 | Operational. | ||
Gol Dam | Skardu | 0.4 | Operational. | ||
Harpo-I, Harchu, Dainyor, Gurikot, Kayo, Dango Das Hydropower Project | Various Locations in Gilgit-Baltistan | 2 | Operational. | ||
Manthoka, Astore, Gulmit, Tolti-I, Khaplu-I, Kachura-I, Darel Hydropower Project | Various Locations in Gilgit-Baltistan | 1.5 | Operational. | ||
Khaibar-I, II, Mushki, Rattu, Misgar, Ghandus, Kiris-I, Thally-I, Mendi, Stak Hydropower Project | Various Locations in Gilgit-Baltistan | 4.85 | Operational. | ||
Tangir-I, Chillas-II, Hayul, Khaplu-I, Sumayar-I, Mehdabad, Nomal, Pari Hydropower Project | Various Locations in Gilgit-Baltistan | 1.5 | Operational. | ||
Jaglot Sai, Sermik-I, Olding-I, Thore, Minapin-I, Ahmadabad-I, II, Chalt-I, Sosat Hydropower Project | Gilgit-Baltistan | 1 | Operational. | ||
Jalalabad Dam | Gilgit | 1 | Operational. | ||
Hasanabad-I, II, III, IV, V Dams | Hunza Valley | 2 | Operational. | ||
Dumsum Dam | Gah | 1.5 | Operational. | ||
Balagond Dam | Gah | 1.5 | Operational. | ||
Ishkuman-I, II Dams | Ishkuman | 2.38 | Operational. | ||
Ashuran Dam | 1.2 | Operational. | |||
Thall Dam | 0.4 | Operational. | |||
Bumborat, Rashang HPP, Matta HPP, Shishi, Karora, Kalam HPP, Keyal, Kaghan, Duber, Jalkot, Gram Chashma, Damori, Keel, Pattika, Chinari, Serai, Kumrat HPPs | Various Locations in KPK | 2.2 | Operational. |
Under construction
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Koto Hydropower Plant | Lower Dir, KPK | 40.8 | Under construction. To be operational by Mar 2019.[12] | |
Jabori Hydropower Project | Mansehra, KPK | 10.8 | Under construction. To be operational by May 2019.[13] | |
Nai Gaj Dam | Dadu, Sindh | 4.2 | Under construction. To be operational by Jun 2019. [14] | |
Gulpur Hydropower Project | Gulpur, Azad Kashmir | 102 | Under construction. To be operational by Oct 2019.[15] | |
Karora Hydropower Plant | Shangla, KKPK | 11.8 | Under construction. To be operational by Nov 2019. [16] | |
Jagran-II Hydropower Project | Neelum, Azad Kashmir | 48 | Under construction. To be operational by Feb 2020.[17] | |
Kurram Tangi Dam- Stage I | North Waziristan, FATA | 19 | Under construction. To be operational by Apr 2020.[18] | |
Keyal Khwar Hydropower Project | Kohistan, KPK | 128 | Under construction. To be operational by Aug 2020.[19] | |
Naltar-III Hydropower Project | Naltar, Gilgit-Baltistan | 16 | Under construction. To be operational by 2020. [20] | |
Nara Hydropower Project | Nara, Sindh | 13.6 | Under construction. To be operational by Mar 2021.[21] | |
Lawi Hydropower Plant | Chitral, KPK | 69 | Under construction. To be operational by Nov 2021.[22] | |
Karot Hydropower Project | Rawalpindi, Punjab | 720 | Under construction. To be operational by Dec 2021.[23] | |
Matiltan Hydropower Project | Swat, KPK | 84 | Under construction. To be operational by 2021.[24] | |
Suki Kinari Hydropower Project | Mansehra, KPK | 870 | Under construction. To be operational by Dec 2022.[25] | |
Sharmai Hydropower Project | Upper Dir, KPK | 150 | Under construction. To be operational by 2022.[26] | |
Shagarthang Hydropower Project | Skardu, Gilgit-Baltistan | 26 | Under construction. To be operational by 2022.[27][28] | |
Dasu Dam (Stage I) | Dasu, KPK | 2,160 | Under construction. To be operational by Jun 2023. [29] | |
Azad Pattan Hydropower Project | Sudhnoti, Azad Kashmir | 700 | Under construction. To be operational by 2023.[30] | |
Shingo Kas Hydropower Project | Dir, KPK | 102 | Under construction. To be operational by Mar 2024.[31] | |
Kaigah Hydropower Project | Kohistan, KPK | 548 | Under construction. To be operational by 2025.[32] | |
Kohala Hydropower Project | Muzaffarabad, Azad Kashmir | 1,124 | Under construction. To be operational by 2026.[33] | |
Harpo Hydropower Project | Skardu, Gilgit-Baltistan | 34.5 | Under construction.[34] | |
Taunsa Barrage Hydropower Plant | Muzaffargarh, Punjab | 120 | Under construction.[35] | |
Pakpatan Hydropower Project | Pakpatan, Punjab | 2.82 | Under construction.[36] | |
Chianwali Hydropower Project | Gujranwala, Punjab | 5.38 | Under construction.[36] | |
Deg Outfall Hydropower Project | Gujranwala, Punjab | 4.04 | Under construction.[36] | |
Okara Hydropower Project | Gujranwala, Punjab | 4.16 | Under construction.[36] | |
Chashma Hydel Power Project | Mianwali, Punjab | 5.0 | Under construction.[37] | |
Naulong Dam | Jhal Magsi, Balochistan | 4.4 | Under construction.[38] | |
Garuk Dam | Kharan District, Balochistan | 0.3 | Under construction.[39] | |
Pelar Dam | Awaran District, Balochistan | 0.3 | Under construction.[40] | |
Proposed
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Mohmand Dam | Mohmand Agency, FATA | 34°21′11″N 71°31′58″E / 34.35306°N 71.53278°E | 800 | Ready to be constructed in 2018.[41] |
Diamer-Bhasha Dam | Chilas, Gilgit-Baltistan | 4,500 | Ready to be constructed in 2018 as funds are also collected all across the country to expedite the dam development process.[41] | |
Athmuqam Dam | Athmuqam, Azad Kashmir | 350 | Ready to be constructed. Korea Hydro & Nuclear Power Corporation won the contract for construction.[42] | |
Turtonus-Uzghor Dam | Chitral, KPK | 58 | Ready to be constructed. Sinohydro Corp Ltd and Sachal Engineering Works Private Ltd won the contract for construction. | |
Mahl Hydropower Project | Azad Kashmir | 34°55′N 73°34′E / 34.917°N 73.567°E | 640 | Ready to be constructed. China Three Gorges Corporation won the contract for construction.[43] |
Nekherdim-Paur Dam | Chitral, KPK | 80 | Ready to be constructed. CTG won the contract for construction.[42] | |
Chakothi-Hattian Hydropower Project | Muzaffarabad, Azad Kashmir | 500 | Ready to be constructed. Chinese firm won the contract for construction. | |
Hanzel Hydropower Project | Hanzel, Gilgit | 20 | Ready to be constructed. Cost estimate $63 million.[44] | |
Kalam Asrit | Kalam, KPK | 197 | Ready to be constructed. KPK government signed MOU with Korea’s state-owned M/S Korea South East Power Company. Cost estimate $500 million.[45] | |
Ghowari Hydropower Project | Gilgit-Baltistan | 30 | Ready to be constructed. Cost estimate $80 million.[46] | |
Tarbela Dam Extension-V | Tarbela, KPK | 34°05′23″N 72°41′54″E / 34.08972°N 72.69833°E | 1,410 | Ready to be constructed. Cost estimate $796 million.[47][48] |
Kotli Hydropower Project | Kotli District, AJK | 102 | Ready to be constructed.[38] Cost estimate $170 million.[49] | |
Bara Dam | Tirah, Khyber Agency | 5.8 | Ready to be constructed.[50][51][51][52][53] | |
Bunji Hydropower Project | Astore District, Gilgit-Baltistan | 35°39′N 74°36′E / 35.650°N 74.600°E | 7,100 | Ready to be constructed. MOU signed with China’s National Energy Administration.[54] Cost estimate $6.8 billion.[38] |
Patan hydropower Project | Patan Village, Indus River | 2,400 | Ready to be constructed. MOU signed with China’s National Energy Administration.[51][52][53][55] Cost estimate $6 billion.[56] | |
Thakot Hydropower Project | Battagram District, KPK | 34°45′N 72°55′E / 34.750°N 72.917°E | 4,000 | Feasibility studies to be completed by Dec 2017. MOU signed with China’s National Energy Administration[51][52][53] Cost estimate $6 billion.[56] |
Phandar Hydropower Project | Ghizer District, Gilgit-Baltistan | 81 | Detailed engineering design or tender of documents under process.[50][53] Cost estimate $128 million .[56] | |
Basho Hydropower Station | Skardu, GB, Indus River | 28 | Detailed engineering design or tender of documents under process.[50][51] Cost estimate $40 million.[56] | |
Tank Zam Dam | Hinis Tangi, KPK, Tank Zam River | 25.5 | Feasibility studies completed.[51] Cost estimate $234 million.[38] | |
Hingol Dam | Lasbela District, Hingol River, Balochistan | 3.5 | Feasibility studies completed. Cost estimate $311 million.[38] | |
Lower Spat Gah hydropower project | Kohistan District, KPK, Indus River | 665 | Feasibility studies completed.[51][52][53] Cost estimate $697 million.[38] | |
Akhori Dam | Akhori, Punjab, Haro River | 600 | Feasibility studies ongoing. Cost estimate $1.6 billion.[56] | |
Middle Palas hydropower project | Kohistan, KPK | 373 | Feasibility studies ongoing.[51][52][53] Cost estimate $763 million.[38] | |
Upper Palas hydropower project | Kohistan, KPK | 160 | Feasibility studies ongoing.[51][52][53] Cost estimate $763 million.[38] | |
Madian Hydropower Project | Swat, KPK, Swat River | 157 | Feasibility studies ongoing.[57] | |
Shushai-Zhendoli Hydropower Project | Chitral, KPK | 144 | Financing is being arranged for these projects by selling shares in the existing projects.[58] | |
Shogosin Hydropower Project | Chitral, KPK | 132 | Financing is being arranged for these projects by selling shares in the existing projects.[58] | |
Latambar Dam | Karak District, Khyber Pukhtunkhwa | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[59] | |
Mairoobi Dam | Nowshera District, Khyber Pukhtunkhwa | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[59] | |
Jaroba Dam | Nowshera District, Khyber Pukhtunkhwa | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[59] | |
Naran Dam | Mansehra District, Khyber Pukhtunkhwa | 188 | EOI invited.[59] | |
Gorband Hydropower Project | Shangla District, KPK | 14 | The preliminary feasibility study of the project has been completed and process of site selection completed.[59][60] | |
Nand Bahar Dam | Battagram District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[59] | |
Mojigram Shagoor Dam | Chitral District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[59] | |
Astar Rabooni Dam | Chitral District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[59] | |
Arkari Gol Dam | Chitral District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[59] | |
Shringal Dam | Upper Dir District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[59] | |
Patrak Barikot Dam | Swat District, Khyber Pukhtunkhwa | 60 | The preliminary feasibility study of the project has been completed and process of site selection completed.[59] | |
Segokatch Dam | Chitral District, KPK | 60 | The preliminary feasibility study of the project has been completed and process of site selection completed.[59] | |
Taunsa Hydropower Project | 135 | IPP, RFP has been accepted.[61] | ||
Naran Hydropower Project | 188 | IPP, RFP has been accepted.[61] | ||
Shigo Kas Hydropower Project | 102 | EOI invited.[61] | ||
Arkari Gol Hydropower Project | 99 | EOI invited.[61] | ||
Bata Kundi Hydropower Project | 96 | EOI invited.[61] | ||
Ghorband Khwar Hydropower Project | 21 | EOI Iinvited.[61] | ||
Nandihar Khwar Hydropower Project | 12 | EOI invited.[61] | ||
Tangir Hydropower Project | Tangir Valley, Chilas, GB | 15 | Proposed. Cost estimate $30.967 million.[38] | |
Winder Dam | Lasbela District, Winder River, Balochistan | 0.3 | Proposed. Cost estimate $148 million.[38] | |
Daraban Zam Dam | Dera Ismail Khan, KPK, Khora River | 0.75 | Proposed. Cost estimate $69 million.[38] | |
Ghabir Dam | Ghabir River | 0.15 | Proposed. Cost estimate $121 million.[38] | |
Papin Dam | Rawalpindi District, Wadala Kas | 0.3 | Proposed. Cost estimate $101 million.[38] | |
Rajhdani Dam | Kotli District, AJK Poonch River | 132 | EOI invited.[42] | |
Gabral Kalam | Kalam, Khyber Pakhtunkwa | 101 | LoS issued. | |
Bhadi Dhoba Hydropower Project | Haveli District | 1 | Proposed. | |
Galeter Hydropower Project | Kotli District | 1 | Proposed.[62] | |
Saridoa Cross Hydropower Project | Bhimber District | 1.7 | Proposed. | |
Chamfall Hydropower Project | Hattian District | 6.4 | Proposed.[62] | |
Guddu Hydropower Station | Kashmore, Sindh | 33 | Proposed. | |
Harighel Hydropower Project | 53 | Proposed. | ||
Sehra Hydropower Project | Azad Kashmir, Poonch River | 130 | Proposed. | |
Nagdar Hydropower Project | Neelum, AJK, Jagran River | 25 | Proposed.[63] | |
Duwarian Hydropower Project | Hattian Bala, AJK, Jagran River | 29 | Proposed.[63] | |
Asrit-Kedam Hydropower Project | Kalam, KPK, Swat River | 215 | Proposed. | |
Karang Hydropower Project | 458 | Proposed. | ||
Shogo-Sin Hydel Dam | 132 | Proposed. | ||
Balakot Hydropower Project | Mansehra, Khyber Pakhtunkhwa | 300 | Proposed.[60] | |
Shushgai Zhendoll | 144 | Proposed. | ||
Yogo, Pakistan | 500 | Proposed. | ||
Thor Hydropower Project | 3.6 | Proposed.[38] | ||
Yulbo Hydropower Project | 3000 | Proposed.[56] | ||
Shyok Hydropower Project | 520 | Proposed.[56] | ||
Tungus Hydropower Project | 2200 | Proposed.[56] | ||
Skardu Dam | Skardu | 1600 | Proposed.[56] | |
Dudhnial Hydropower Project | 960 | Proposed.[56] | ||
Kundal Shahi Hydropower Project | 960 | Proposed.[56] | ||
Trappi Hydropower Project | 32 | Proposed.[56] | ||
Nandihar Hydropower Project | Battagram, Khyber Pukhtunkhwa | 10 | Proposed.[60] | |
Mujigaram Shagore Hydropower Project | Chitral, Khyber Pukhtunkhwa | 51 | Proposed.[60] | |
Istaro Booni Hydropower Project | Chitral, Khyber Pukhtunkhwa | 52 | Proposed.[60] | |
Arkari Gol Hydropower Project | Chitral, Khyber Pukhtunkhwa | 79 | Proposed.[60] |
Nuclear
In service
Station | Community | Location | Capacity (MW) | In-Service Date | Status |
---|---|---|---|---|---|
(KANUPP-1) | Karachi, Sindh | 24°50′41″N 66°47′20″E / 24.84472°N 66.78889°E | 85 | 1972 | |
(CHASNUPP-1) | Mianwali, Punjab | 32°23′20″N 71°27′45.5″E / 32.38889°N 71.462639°E | 320 | July 2000 | |
(CHASNUPP-2) | Mianwali, Punjab | 32°23′20″N 71°27′45.5″E / 32.38889°N 71.462639°E | 320 | Mar 2011 | |
(CHASNUPP-3) | Mianwali, Punjab | 32°23′20″N 71°27′45.5″E / 32.38889°N 71.462639°E | 340 | Oct 2016 | |
(CHASNUPP-4) | Mianwali, Punjab | 32°23′20″N 71°27′45.5″E / 32.38889°N 71.462639°E | 340 | Sep 2017 |
Under construction or proposed
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
(KANUPP-2) | Karachi, Sindh | 1161 | Under construction. To be operational by Jun 2021.[64] | |
(KANUPP-3) | Karachi, Sindh | 1161 | Under construction. To be operational by Apr 2022.[64] | |
(CHASNUPP-5) | Mianwali, Punjab | 1161 | LOI issued. [65] |
Renewables
Wind Power
According to a USAID report, Pakistan has the potential of producing 150,000 megawatts of wind energy, of which only the Sindh corridor can produce 40,000 megawatts.
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Jhimpir Wind Power Plant | Jhimpir, Sindh | 56.4 | Operational since 2009. | |
Jhimpir Wind Energy Project | Jhimpir, Sindh | 49.6 | Operational since Dec 2012. | |
Three Gorges First Wind Farm Pakistan Ltd-I | Jhimpir, Sindh | 50 | Operational since Dec 2014. | |
Foundation Wind Energy–I & II Pvt Ltd | Gharo, Sindh | 100 | Operational since Jan 2015. | |
Sapphire Wind Power Pvt Ltd | Gharo, Sindh | 52.8 | Operational since Nov 2015. | |
Yunus Energy Ltd | Jhimpir, Sindh | 50 | Operational since Sep 2016. | |
Metro Wind Power Co Ltd | Jhimpir, Sindh | 50 | Operational since Sep 2016. | |
Tenaga Generai Ltd | Gharo, Sindh | 49.5 | Operational since Oct 2016. | |
Gul Ahmed Wind Power Ltd | Jhimpir, Sindh | 50 | Operational since Oct 2016. | |
Master Wind Energy Ltd | Jhimpir, Sindh | 52.8 | Operational since Oct 2016. | |
FFC Energy Ltd | Jhimpir, Sindh | 49.5 | Operational since May 2013. | |
Zorlu Enerji Pakistan | Jhimpir, Sindh | 56.4 | Operational since Oct 2016. | |
Tapal Wind Energy Ltd | Jhimpir, Sindh | 30 | Operational since Oct 2016. | |
HydroChina Dawood Power Ltd | Gharo, Sindh | 49.5 | Operational since Apr 2017. | |
Sachal Energy Wind Farm | Jhimpir, Sindh | 49.5 | Operational since Apr 2017. | |
United Energy Ltd | Jhimpir, Sindh | 100 | Operational since Jun 2017. | |
Hawa Energy Ltd | Jhimpir, Sindh | 50 | Operational since Mar 2018. | |
Burj Capital Jhimpir Project | Jhimpir, Sindh | 50 | Operational since May 2018. | |
Moro Power Company Pvt Ltd | Jhimpir, Sindh | 25 | Under construction. To be operational by Nov 2018.[66] | |
Tricon Boston Corporation | Jhimpir, Sindh | 150 | Under construction. To be operational by Nov 2018.[67][68] | |
Zephyr Power Ltd | Gharo, Sindh | 50 | Under construction. To be operational by Nov 2018.[69] | |
Three Gorges Second Wind Farm Pakistan Ltd-II | Jhimpir, Sindh | 50 | Under construction. To be operational by Nov 2018.[70] | |
Three Gorges Second Wind Farm Pakistan Ltd-III | Jhimpir, Sindh | 50 | Under construction. To be operational by Nov 2018.[70] | |
Hartford/Artistic Alternate Energy Pvt Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Western Energy Pvt Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Shaheen Foundation | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Norinco International Thatta Power Pvt. Ltd. | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Trans Atlantic Energy Pvt Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Act 2 Wind Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Harvey Wind Power Project | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Zulikha Energy Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Gul Ahmed Electric Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Metro Wind Power Ltd | Jhimpir, Sindh | 60 | Under construction. To be operational by 2018.[67] | |
Din Energy Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Din Energy Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[67] | |
Burj Wind Energy Pvt Ltd | Jhimpir, Sindh | 14 | Under construction. To be operational by 2018.[67] | |
Iran-Pak Wind Power Pvt Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by Jul 2019.[71] | |
Titan Energy Pakistan (Pvt) Ltd | Jhimpir, Sindh | 50 | Under construction.[67] | |
Dawood Power Pvt Ltd | Gharo, Sindh | 50 | Under construction.[67] | |
Bhambore Wind Project | Gharo, Sindh | 50 | Under construction.[67] | |
MBM Engineering Company | Karachi, Sindh | 1 | Under construction.[72] | |
Gharo Wind Power Plant | Gharo, Sindh | 50 | Under construction. | |
Finerji (Pvt) Ltd | Jhimpir, Sindh | 50 | Under construction.[67] | |
Trident Energy (Pvt) Ltd | Jhimpir, Sindh | 50 | Under construction.[67] | |
Wind Eagle (Pvt) Ltd | Jhimpir, Sindh | 50 | Under construction.[73] | |
Quaid-e-Azam Wind Park | Punjab | 1000 | Under construction.[74] | |
AM Pak Energy | Punjab | 50 | LOI issued.[75] | |
Sany Group | Punjab | 1000 | MOU issued.[76] | |
Cacho Wind Project | Sindh | 50 | MOU issued.[77] | |
Burj Capital Project-II | Thatta, Sindh | 13.8 | MOU issued.[78] |
Solar Power
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Pakistan Parliament | Islamabad, Pakistan | 1 | Operational since Feb 2016. | |
Quaid-e-Azam Solar Park | Bahawalpur, Punjab | 400 | Operational since Dec 2016. | |
Fatima Jinnah Park | Islamabad, Pakistan | 1 | Operational since Dec 2016. | |
POF Sanjwal Factory | Islamabad, Pakistan | 5 | Operational since Mar 2017. | |
Service Industries Limited | Muridke, Punjab | 1 | Operational since Sep 2017. | |
SECMC | Thar, Sindh | 5 | Operational since Feb 2018. | |
Harappa Solar Pvt Ltd | Sahiwal, Punjab | 18 | Operational since Mar 2018. | |
Bukhsh Solar Pvt Ltd | Lodhran, Punjab | 10 | Under construction. To be operational by Mar 2018.[79] | |
Access Electric Pvt Ltd | Punjab | 10 | Under construction. To be operational by Mar 2018.[79] | |
Safe Solar Power Pvt Ltd | Punjab | 10 | Under construction. To be operational by Mar 2018.[79] | |
Acess Solar Pvt Ltd | Punjab | 11.5 | Under construction. To be operational by Mar 2018.[79] | |
Blue Star Hydel Pvt Ltd | Punjab | 1 | Under construction. To be operational by Mar 2018.[79] | |
Safe Solar Power Pvt Ltd | Punjab | 10 | Under construction. To be operational by Mar 2018.[79] | |
AJ Power Pvt Ltd | Sahiwal, Punjab | 12 | Under construction. To be operational by Mar 2018.[79] | |
Scatec Solar | Goth Gagrawara, Sindh | 50 | Under construction. To be operational by Dec 2018.[80] | |
Scatec Solar | Taluka Saleh Pat, Sindh | 50 | Under construction. To be operational by Dec 2018.[80] | |
Scatec Solar | Sukkur, Sindh | 50 | Under construction. To be operational by Dec 2018.[80] | |
Oursons Pakistan Ltd | Gharo, Sindh | 50 | Under construction. To be operational by 2018.[81] | |
Enertech | Quetta, Balochistan | 50 | Under construction. To be operational by Jun 2019.[82] | |
Integrated Power Solution | Punjab | 50 | LOI isuued. To be operational by 2019.[79] | |
Jafri and Associates | Punjab | 50 | LOI isuued. To be operational by 2019.[79] | |
Solar Blue Pvt Ltd | Punjab | 50 | LOI isuued. To be operational by 2019.[79] | |
Forshine | Punjab | 50 | LOI isuued. To be operational by 2019.[79] | |
ACT Solar (Pvt) Ltd | Punjab | 50 | LOI isuued. To be operational by 2019.[79] | |
Siddiqsons Energy Karachi | Punjab | 50 | LOI isuued. To be operational by 2019.[79] | |
ET Solar Pvt Ltd | Punjab | 50 | LOI isuued. To be operational by 2019.[79] | |
R.E Solar-I Pvt Ltd | Punjab | 20 | LOI isuued. To be operational by 2019.[79] | |
R.E Solar-II Pvt Ltd | Punjab | 20 | LOI isuued. To be operational by 2019.[79] | |
Janpur Energy Limited | Punjab | 12 | LOI isuued. To be operational by 2019.[79] | |
Asia Petroleum Ltd | Sindh | 30 | LOI isuued. To be operational by 2019.[79] | |
ET Solar Pvt Ltd | Sindh | 25 | LOI isuued. To be operational by 2019.[79] | |
Crystal Energy Pvt. Ltd | Sindh | 2 | LOI isuued. To be operational by 2019.[79] | |
First Solar | Punjab | 2 | LOI issued. To be operational by 2019.[79] | |
Roshan Power Solar | Kasur, Punjab | 10 | LOI issued.[75] | |
Conergy Solar Project | Bahawalpur, Punjab | 50 | LOI issued.[83] | |
DACC LLC Solar | Sindh | 50 | LOI issued.[75][84] | |
Wah Industries Limited Solar | Taxila, Punjab | 1 | LOI issued.[75] | |
Solar Energy Pakistan Ltd | Thatta, Sindh | 35 | LOI issued.[75] | |
CWE Solar | Bahawalpur, Punjab | 50 | LOI issued.[75] | |
Helios Power Pvt Ltd | Sindh | 50 | LOI issued.[85] | |
Meridian Energy Pvt Ltd | Sindh | 50 | LOI issued.[85] | |
HNDS Energy Pvt Ltd | Sindh | 50 | LOI issued.[85] | |
Kulachi Solar Power Pvt Ltd | Kulachi, KPK | 50 | LOI issued.[86] | |
Zhenfa Pakistan New Energy | Rakh Chaubara, Punjab | 100 | LOI issued.[86] | |
Canadian Commercial Corporation | KPK | 1000 | MOU issued.[87] |
Bagasse Power
Bagasse is the crushed residue of sugarcane. It is an excellent raw material for power generation. Pakistan sugar industry is one of the biggest in the world and comprises 81 sugar mills with an annual capacity of about six million tons sugar. The industry crushes about 30 to 40 million tons of sugarcane that yields about 12 million tons of bagasse as an industrial waste that has a potential of generating 3000 MW electricity.[88] According to a recent report by National Electric Power Regulatory Authority (NEPRA), about 16 sugar mills are supplying nearly 120 MW surplus power to electric distribution companies for national grid while many others are producing just enough power for their use only.[89][90]
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
JDW Sugar Mill Power plant I | Jhimpir, Sindh | 26.35 | Operational. | |
JDW Sugar Mills (Unit- II) | Jhimpir, Sindh | 26.35 | Operational. | |
JDW Sugar Mills (Unit- III) | Jhimpir, Sindh | 26.35 | Operational. | |
RYK Mills Ltd | Rahim Yar Khan, Punjab | 30 | Operational. | |
Chiniot Power Ltd | Chiniot, Punjab | 62.4 | Operational. | |
Mirpurkhas Sugar Power Plant | Mirpurkhas, Sindh | 34.1 | Operational. | |
Sanghar SPP | 32 | Operational. | ||
Shahmurad SPP | 26.5 | Operational. | ||
Mehran SPP | 22.9 | Operational. | ||
Kamaila SPP | 20.1 | Operational. | ||
Fatima SPP | 20.1 | Operational. | ||
Khosi SPP | 20.1 | Operational. | ||
Madina SPP | 20.1 | Operational. | ||
Pahrianwall SPP | 20.1 | Operational. | ||
Tandlianwala SPP | 20.1 | Operational. | ||
Sheikhoo SPP | 20.1 | Operational. | ||
Bahawalnagar SPP | 18.5 | Operational. | ||
Bachani Sugar Mill Power Plant | 16.8 | Operational. | ||
Husein SPP | 13.4 | Operational. | ||
Faran SPP | 13.4 | Operational. | ||
Phalia SPP | 13.4 | Operational. | ||
Premier SPP | 13.4 | Operational. | ||
Chashma SPP | 13.4 | Operational. | ||
Punjab SPP | 13.4 | Operational. | ||
Kohinoor SPP | 10.1 | Operational. | ||
Bawani Sugar Mill Power Plant | 10.1 | Operational. | ||
Matiari SPP | 6.7 | Operational. | ||
Layyah Sugar Mills Ltd | Layyah, Punjab | 41 | Operational. | |
Al-Arabia Sugar Mills | Sargodha, Sindh | 18 | Operational. | |
Digri-Gen Ltd | Mirpurkhas, Sindh | 25 | Operationl. | |
Alliance Sugar Mills Ltd | Ghotki, Sindh | 19 | Under construction. To be operational by Dec 2017. | |
Safina Sugar Mills | Chiniot, Punjab | 20 | Under construction. To be operational by Dec 2017. | |
Eatihad Power Generation | Rahim Yar Khan, Punjab | 67 | Under construction. To be operational by Dec 2017. | |
Sheikhoo Power Ltd | Muzaffargarh, Punjab | 30 | Under construction. To be operational by 2018.[91] | |
Mehran Sugar Mill Ltd | Tando Allahyar, Sindh | 26.5 | Under construction. To be operational by 2018.[92] | |
Shahtaj Sugar Mills Ltd | Mandi Bahauddin, Punjab | 32 | Under construction. To be operational by 2018. | |
RYK Energy | Rahim Yar Khan, Punjab | 36 | Under construction. To be operational by 2018. | |
Indus Energy Ltd | Rajanpur, Sindh | 30 | Under construction. To be operational by 2018. | |
Hamza Sugar Mills Unit-II | Rahim Yar Khan, Punjab | 30 | Under construction. To be operational by 2018. | |
Chanar Energy Ltd | Faisalabad, Punjab | 22 | Under construction. To be operational by 2018. | |
Indus Energy Ltd | Punjab | 31 | Under construction. To be operational by 2018.[93] | |
Mirpurkhas Energy Ltd | Sindh | 26 | Under construction. To be operational by 2018.[93] | |
Faran Energy Ltd | Sindh | 26 | Under construction. To be operational by 2018.[93] |
Biomass Power
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
University of Agriculture- Biomass Project | Faisalabad, Punjab | 0.1 | Operational. | |
Karachi Biomass Project | Karachi, Sindh | 40 | Under construction. To be operational by Apr 2021.[94] | |
Faisalabad Biomass Project | Faisalabad, Punjab | 20 | Under construction.[95] | |
Lahore Biomass Project | Lahore, Punjab | 40 | Under construction.[96] |
Waste Heat Recovery Power
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Lucky Cement Ltd | Karachi, Sindh | 20 | Operational. | |
Lucky Cement Ltd | Pezu, KPK | 30 | Operational. | |
Maple Leaf Cement Ltd | Mianwali, Punjab | 15 | Operational. |
See also
References
- ↑ "Dark days ahead: 'Electricity woes to worsen in future' - The Express Tribune". Tribune.com.pk. 13 July 2011.
- ↑ "Installed capacity increases, but power production falls - The Express Tribune". Tribune.com.pk. 26 May 2017.
- ↑ "Pakistan's energy security - The Express Tribune". Tribune.com.pk. 7 January 2014.
- ↑ "Lakhra coal for power generation - Newspaper". Dawn.Com. 2015-03-30. Retrieved 2018-07-17.
- ↑ "PM Abbasi dismisses 'political alliances' against government". Geo.tv.
- ↑ https://www.thenews.com.pk/print/375384-thar-coal-based-660mw-plant-achieves-90pc-completion
- ↑ https://www.dawn.com/news/1436296/1320mw-coal-power-plant-energised
- 1 2 "2 coal power plants operations delayed". Nation.com.pk. 26 May 2018.
- 1 2 Kiani, Khaleeq (9 March 2018). "Pacts signed for two coal projects". DAwn.com.
- 1 2 Reporter, The Newspaper's Staff (31 May 2017). "Chinese firm gets LoI for Gwadar coal power project". Dawn.com.
- ↑ "Golen Gol project starts electricity generation - The Express Tribune". Tribune.com.pk. 25 January 2018.
- ↑ https://nation.com.pk/01-Oct-2018/kp-govt-completes-255-mini-hydropower-projects
- ↑ https://www.thenews.com.pk/latest/374989-kp-govt-completes-255-mini-hydropower-projects-proposes-7-projects-for-inclusion-in-cpec
- ↑ "Funding issues delay construction of Dadu dam by four years". Dawn.com. 16 August 2017.
- ↑ "Chinese firm gets LoS for 1,320MW project at Hub". Thenews.com.pk.
- ↑ https://www.thenews.com.pk/latest/374989-kp-govt-completes-255-mini-hydropower-projects-proposes-7-projects-for-inclusion-in-cpec
- ↑ "48 MW Jagran- II HPP". Fwo.com.pk.
- ↑ "Minister Discusses Issues Of Water And Hydro-power With WAPDA - UrduPoint". Urdupoint.com.
- ↑
- ↑
- ↑ "Sindh's first run-of-the-river power plant seeks generation licence". Thenews.com.pk.
- ↑ https://www.thenews.com.pk/print/379740-lavy-hydropower-project-unpaid-chinese-contractor-threatens-to-stop-work}
- ↑ "China Quickens Work on Pakistan Project in Area Claimed by India". Bloomberg.com.
- ↑ "KP spends Rs10b on 252MW hydropower generation projects". Thenews.com.pk.
- ↑ https://www.thenews.com.pk/print/362437-suki-kinari-hydropower-project-to-produce-870mw
- ↑ "Sharmai hydropower project". Nation.com.pk. 10 September 2017.
- ↑ "Shagarthang Hydropower Project approved – PAMIR TIMES". Pamirtimes.net. Retrieved 2018-07-17.
- ↑ "(ECNEC) Friday approved the 26 MW Shagarthang Hydropower Project for Skardu : ResultDon - - Results, Exams, Education, Jobs". Resultdon.blogspot.com.
- ↑ "Dasu Hydropower Project With 4320 MW Capacity To Be Completed In Two Phases: PD - UrduPoint". Urdupoint.com.
- ↑ "Pakistan announces $1.5b hydropower project in AJK - The Express Tribune". Tribune.com.pk. 30 December 2017.
- ↑ "SaifCo Hydropower Limited (SCHPL) Seeks Power Generation License For 102 MW Hydropower Project - UrduPoint". Urdupoint.com.
- ↑ Herald, The Korea (4 December 2017). "SK E&C to build 545 MW hydropower plant in Pakistan". Koreaherald.com.
- ↑ https://www.dawn.com/news/1428973/kohala-project-land-acquisition-may-complete-by-december
- ↑ "Germany's KfW agrees to help finance Pakistan's 35-MW Harpo hydroelectric project". www.hydroworld.com.
- ↑ "Hydro Power: Electricity project on Taunsa barrage - The Express Tribune". Tribune.com.pk. 24 April 2011.
- 1 2 3 4 "Power crisis: Punjab earmarks Rs10b for energy projects - The Express Tribune". Tribune.com.pk. 10 June 2012.
- ↑ "Infrastructure Development in Pakistan". Defence.pk.
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 "Archived copy" (PDF). Archived from the original (PDF) on 2013-03-03. Retrieved 2014-04-16.
- ↑
- ↑
- 1 2 "Wapda to start construction on Diamer-Basha, Mohmand dams in 2018". Nation.com.pk. 21 October 2017.
- 1 2 3 "Power board approves projects of 2,630MW capacity - The Express Tribune". Tribune.com.pk. 6 March 2014.
- ↑ "Timely Completion Of Cpec Projects, Our Priority: Sardar Masood Khan". KashmirWatch. Retrieved 2018-07-17.
- ↑ Reporter, The Newspaper's (2 October 2015). "Ecnec approves Rs102bn projects". Dawn.com.
- ↑ "KP govt, Korean company ink MoU for building hydropower project". Thenews.com.pk.
- ↑ "CDWP approves Rs130b development projects - Daily Pakistan Observer -Daily Pakistan Observer –". pakobserver.net.
- ↑ "Another $51m to expedite Tarbela project completion - Newspaper". Dawn.Com. Retrieved 2018-07-17.
- ↑ "Tarbela fifth extension project gets CDWP's nod - The Express Tribune". Tribune.com.pk. 2 October 2015.
- ↑ "Power sector: Govt opens bids for Kotli hydropower project - The Express Tribune". Tribune.com.pk. 5 March 2014.
- 1 2 3
- 1 2 3 4 5 6 7 8 9 "Archived copy". Archived from the original on 2014-07-22. Retrieved 2014-08-27.
- 1 2 3 4 5 6
- 1 2 3 4 5 6 7 "High Commission for Pakistan, London" (PDF). www.pakmission-uk.gov.pk.
- ↑ "Experts express satisfaction on NJHP progress". Nation.com.pk. 2 November 2016.
- ↑ "32,701mw power projects to be completed in 7 years". Nation.com.pk. 2 December 2013.
- 1 2 3 4 5 6 7 8 9 10 11 12 "Archived copy" (PDF). Archived from the original (PDF) on 2012-05-11. Retrieved 2014-03-24.
- ↑ "Private Power & Infrastructure Board". Ppib.gov.pk. 2014-10-16. Retrieved 2018-07-17.
- 1 2 "Ranolia HPP - The Progress of PTI in KPK". kpkprogress.wordpress.com.
- 1 2 3 4 5 6 7 8 9 10 11 12 "KP Govt to construct three small dams in Karak, Nowshera". Samaa.tv.
- 1 2 3 4 5 6 "Power Sector - The Progress of PTI in KPK". kpkprogress.wordpress.com.
- 1 2 3 4 5 6 7 "Hydroelectric power: Investor that quotes lowest tariff will win project bid - The Express Tribune". Tribune.com.pk. 29 October 2016.
- 1 2 "PakistanIndependentNewsAgency-PakistanPressInternational". ppinewsagency.com.
- 1 2 Naqash, Tariq (31 January 2016). "AJK, Wapda to sign Neelum power accord". Dawn.com.
- 1 2 "Steam generator installation underway at Karachi 2". www.world-nuclear-news.org.
- ↑ http://www.world-nuclear-news.org/Articles/First-steam-generator-for-Karachi-3
- ↑ https://www.thenews.com.pk/print/374580-moro-power-seeks-wind-project-licence
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
- ↑ "ADB boosts Pakistan wind". Renews.biz. 31 October 2016.
- ↑ "SGRE wins first Pakistan construction deal". Windpowermonthly.com.
- 1 2 "NEPRA accepts request for 99MW wind power projects - The Express Tribune". Tribune.com.pk. 19 April 2016.
- ↑ "Iranian firm gets go-ahead for 50MW wind project in Sindh - The Express Tribune". Tribune.com.pk. 4 July 2017.
- ↑
- ↑ "Archived copy". Archived from the original on 2014-03-24. Retrieved 2014-03-24.
- ↑
- 1 2 3 4 5 6 "China Renewable Deals". Dawn.com. Retrieved 2010-12-19.
- ↑ "Chinese firm to invest $1.5b in developing wind farms in Punjab - The Express Tribune". Tribune.com.pk. 11 August 2017.
- ↑ "Cacho 50MW Wind Power Project | China-Pakistan Economic Corridor (CPEC) Official Website". CPEC. Retrieved 2018-07-17.
- ↑ "Burj Capital seeks wind power generation licence". Thenews.com.pk.
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 "National grid to have additional 556.52MW solar energy by 2018 - Daily Pakistan Observer -Daily Pakistan Observer –". pakobserver.net.
- 1 2 3 "Scatec and Nizam request sub-6 cent tariff for 150MW of Pakistan solar projects". Pv-tech.org.
- ↑ "KE accepts applications for net metering". Thenews.com.pk.
- ↑ "Entertech plans 50MW solar plant". Thenews.com.pk.
- ↑ "Largest PV project in Pakistan to be built by Conergy". Pv-tech.org.
- ↑ "Conergy onboard for largest solar project". Tribune.com.pk.
- 1 2 3 "Investors seek licences to set up 200MW solar plants". Thenews.com.pk.
- 1 2 "Kulachi seeking EPC services for 50MW solar project in Pakistan". Pv-tech.org.
- ↑ "Canadian Commercial Corporation Will Build Another 1 Gigawatt Of Solar In Pakistan - CleanTechnica". cleantechnica.com.
- ↑ Čeština (2014-11-09). "Potential Of Bagasse -Fired Power Generation In Pakistan". LinkedIn. Retrieved 2018-07-17.
- ↑ Chaudhry, Muhammad Bashir (6 October 2014). "Upgrading bagasse-based power plants". Dawn.com.
- ↑
- ↑ "Licence sought for bagasse-based power plant - The Express Tribune". Dawn.com. 3 May 2017.
- ↑ "Sugar mill to set up bagasse-based power plant - The Express Tribune". Tribune.com.pk. 2 August 2016.
- 1 2 3 "Three companies get power generation licences". Thenews.com.pk.
- ↑ "Chinese firm seeks licence for 40MW solid waste plant". Thenews.com.pk.
- ↑ "Punjab approves Rs165m Biomass Thermal Power Project - Daily Pakistan Observer -Daily Pakistan Observer –". pakobserver.net.
- ↑ "Pakistan's first waste based energy project gets generation license". Thenews.com.pk.