Azad Pattan Hydropower Project
Azad Pattan Hydropower Project | |
---|---|
Project Layout | |
Location of Azad Pattan Hydropower Project in Pakistan | |
Country | Pakistan |
Location | Sudhanoti District, Azad Kashmir |
Coordinates | 33°46′3.9″N 73°34′17.45″E / 33.767750°N 73.5715139°ECoordinates: 33°46′3.9″N 73°34′17.45″E / 33.767750°N 73.5715139°E |
Status | Proposed |
Construction began | 2018 |
Opening date | 2022 |
Owner(s) | Laraib Group |
Dam and spillways | |
Type of dam | Gravity dam, Run of the river |
Impounds | Jhelum River |
Height | 90 m (295 ft) |
Length | 80 m (262 ft) |
Power Station | |
Turbines | 4 x 160 MW |
Installed capacity | 700 MW (10% continuous overload)[1] |
Annual generation | 3064 GWh |
The Azad Pattan Hydropower Project is a proposed 700 MW hydroelectric power station on the Jhelum River roughly 7 km upstream of Azad Pattan Bridge in the Sudhanoti District of Azad Kashmir and 90 km from Islamabad, the capital city of Pakistan.[2][3]
See also
References
- ↑ "Pakistan announces $1.5b hydropower project in AJK". tribune.com.pk. Retrieved 1 January 2018.
- ↑ Recorder, Business. "Azad Pattan HPP | Business Recorder". Business Recorder. Retrieved 2016-02-14.
- ↑ Change, United Nations Framework Convention on Climate. "CDM: Azad Pattan Hydropower Project". cdm.unfccc.int. Retrieved 2016-02-15.
External links
This article is issued from
Wikipedia.
The text is licensed under Creative Commons - Attribution - Sharealike.
Additional terms may apply for the media files.