Namma Metro

Metro map

Namma Metro
ನಮ್ಮ ಮೆಟ್ರೊ
Overview
Owner Bangalore Metro Rail Corporation Limited (BMRC)
Locale Bangalore, Karnataka, India
Transit type Rapid transit
Number of lines 2
Number of stations 41[1]
Daily ridership 440,000 (10 Aug 2018)[2]
Chief executive Shri Mahendra Jain (MD)
Headquarters BMTC Complex, K.H. Road, Shanthinagar, Bengaluru
Website bmrc.co.in
Operation
Began operation 20 October 2011 (2011-10-20)
Train length 3 coaches (extendable to 6 coaches)
Headway 4–15 minutes[3]
Technical
System length 42.3 km (26.3 mi)[4]
No. of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 950 V DC third rail
Average speed 43 km/h (27 mph)
Top speed 80 km/h (50 mph)
Namma Metro Rail Network (2017)

Namma Metro, also known as Bengaluru Metro[5] is a metro system serving the city of Bengaluru, India. As of October 2018 the third longest operational metro network in India after the Delhi Metro and Hyderabad Metro.[6] On the other hand, Namma Metro was ranked the 83rd largest metro system in terms of length and the 79th largest metro network in terms of number of operating stations in the world. It also contains the first underground metro line in South India.[7] The metro network consists of two colour-coded lines, with a total length of 42.3 kilometres serving 41 stations. The system has a mix of underground, at-grade, and elevated stations using standard-gauge tracks. The metro has an average daily ridership of 315,000 passengers. By 2023, the system is expected to complete its phase 2 network and provide connectivity to the city's important tech hubs of Electronics City and Whitefield.

The Bangalore Metro Rail Corporation Ltd (BMRCL), a joint venture of the Government of India and the Government of Karnataka, built and operates the Namma Metro.[8] Services operate daily between 05:00 and 23:00 running with a headway varying between 4–20 minutes.[9] The trains are composed of three to six cars. The power output is supplied by 750 volt direct current through third rail. Namma Metro was the second rail transport system in India to use 750V DC third rail traction, the first being the Kolkata Metro.

History

The Delhi Metro Rail Corporation Limited (DMRC) prepared and submitted the detailed project for the first phase of the Namma Metro project to the BMRCL in May 2003. Construction work for Phase 1 of the project was scheduled to start in 2005 but was delayed by a February 2006 change of government in Karnataka. The project was approved by the Union Cabinet on 25 April 2006. Civil construction on the first section, the stretch of the Purple Line between Baiyyappanahalli and Mahatma Gandhi Road, commenced on 15 April 2007. The section opened to the public on 20 October 2011. The development of network is divided into two phases while phase 1 containing 2 lines was completed in 2017,[10][11] and Phase 2 is expected to be completed by 2020.[12]

Construction

Construction work for Phase 1 of the project was scheduled to start in 2005 but was delayed by a February 2006 change of government in Karnataka and continued debate over whether the project was financially feasible and appropriate for the city. Finally, on 25 April 2006 the Indian Cabinet approved the project, which was then budgeted at more than 5,400 crore (US$750 million) (Later revised to 11,609 crore (US$1.6 billion) for Phase I).[13] In 2006, Navayuga Engineering was awarded the contract to construct Reach 1 of the East-West corridor.[14] The foundation stone for the Phase 1 construction was laid by Prime Minister Manmohan Singh on 24 June 2006,[15] and civil construction on Reach I of the line, between M.G. Road and Baiyyappanahalli, commenced on 15 April 2007.[16][17] The DPRs for a northern extension (from Yeshwanthapura to Hesaraghatta Cross) and part of the southern extension (from RV Road to Yelachenahalli) was submitted in October 2007 and June 2008 respectively.[18]

The original deadline to complete Phase 1 was March 2010. Phase 1 missed nine deadlines, and its total cost was revised four times.[19] The entire Phase 1 was opened to public on 18 June 2017.[11]

Underground construction

The underground work of Phase 1 commenced in May 2011. Each corridor consists of two tunnels, which are the first underground tunnels built for trains in South India. The tunnels, dug using tunnel boring machines (TBM), are located approximately 60 feet below ground level, have a diameter of 5.5 metres and are 5 metres apart.[20][21][22][23][24] [25] A total of 6 TBMs were used for work in the underground section of Phase 1. They were nicknamed Helen (TBM 1), Margarita (TBM 2), Kaveri (TBM 3), Krishna and Godavari.[26] The UG2 (north to south corridor), from Majestic to K.R Market is expected to finish the entire tunnelling works by August 2016, after which the Green Line would be opened for service, towards the end of the year.

Underground UG1 (east to west corridor) tunneling work was completed on 17 March 2014 after tunnel boring machine Helen (TBM 1) finished its task of tunneling 229 m (751 ft) between Bangalore City railway station underground (UG) station and Kempegowda UG station (Majestic). Trackwork and 3rd rail electrification works are completed on the 4.8 km (3.0 mi) eastbound tunnel of Bangalore metro's Purple line between Cubbon Park and Magadi Road, and the Bangalore Metro Rail Corporation Ltd (BMRCL) began end to end trials on the entire 18.1 km (11.2 mi) Purple line which stretches from Baiyappanahalli to Mysore Road on 23 November 2015.[27] The entire Purple Line stretch was operational on 29 April 2016.

Current Network

Namma Metro is being built in phases. As of 18 June 2017, the entire portion of Phase 1 has been completed and is in operation. The operational portion of the Namma Metro is listed below:-

Line Opening date Last extension Stations[28] Length[29]
(km)
Terminals Rolling Stock Track Gauge mm Power Min Headway
Purple Line 20 October 2011 30 April 2016 17 18.22 Baiyyappanahalli Mysore Road 1435mm 750 V DC third rail 4
Green Line 1 March 2014 18 June 2017 24 24.20 Nagasandra Yelachenahalli 1435mm 750 V DC third rail 4
Total 41 42.42

Purple Line

The first 6.7-kilometre (4.2 mi), 6-station stretch (Reach 1) of the Purple Line between Baiyappanahalli and Mahatma Gandhi Road opened on 20 October 2011,[30] and was the inaugural section of the Namma Metro.[31] The second 6.4-kilometre (4.0 mi), 6-station stretch (Reach 2) of the Purple Line between Mysore Road and Magadi Road opened on 16 November 2015.[32] The first underground section of South India, a 4.8 km (3.0 mi) stretch from Cubbon Park to Bengaluru City (KSR) Railway Station opened on 29 April 2016, thereby completing the entire 18.22 km (11.32 mi) Purple Line stretch of the metro network.

Green Line

The first 9.9-kilometre (6.2 mi), 10-station stretch (Reach 3/3A) of the Green Line opened 1 March 2014.[33][34] The stretch connected Sampige Road to Peenya Industry.[35] The second 2.5-kilometre (1.6 mi), 3-station stretch (Reach 3B) of the Green Line, operating between Peenya Industry and Nagasandra, opened 1 May 2015.[36][37] The last stretch connecting Sampige Road to Yelachenahalli was inaugurated on 17 June 2017 thereby completing the entire Phase 1.

The Green Line is the second line of the Metro and it connects Nagasandra in the north to Yelachenahalli in the south, covering a distance of 24.2 kilometres (15.0 mi),[4] and serving 24 stations.[28] It is partly elevated and partly underground. The southern section of the line, beyond Majestic was thrown open to the public for commercial operations on 18 June 2017. [11] [38] It was inaugurated by the President of India Shri Pranab Mukherjee on 17 June 2017.

Bangalore City Railway Map (as of August 2017)

Phase 1

The DMRC submitted the DPR for Phase 1 of the Namma Metro project to the BMRCL in May 2003. The final approval on a scheme that incorporated the expertise of DMRC and RITES Limited did not come until April 2006.[18][39] The DPR prepared by DMRC envisaged a 33 km (21 mi) elevated and underground rail network with 32 stations for Phase 1 of the project. The proposed gauge was standard gauge unlike the broad gauge on the Delhi Metro network. The rationale for the metro includes reduced journey times, cutting fuel use, accident reduction and lower pollution. In 2007, the BMRCL announced that it would incorporate a northern extension (from Yeshwanthapura to Hesaraghatta Cross) and part of the southern extension (from RV Road to Yelachenahalli) in Phase I, thus extending the length of Phase 1 network to about 42.3 km (26.3 mi), with 41 stations. The objective was to connect the metro to the Outer Ring Road at both ends, and also cover the industrial areas of Peenya in the north-west, thereby providing better connectivity and increasing ridership. In October 2008, the Government of Karnataka approved this extension, which would cost an additional 1,763 crore (US$250 million).[40][19]

Phase 1 comprises two lines spanning a length of 42.30 kilometres (26.28 mi), of which about 8.82 kilometres (5.48 mi) is underground and about 33.48 kilometres (20.80 mi) is elevated.[4] There are 40 stations in Phase I, of which 8 stations are underground, 1 at grade and 32 are elevated.[18]

Line Elevated length (km) Underground length (km) Total length (km) % of length on curves Stations
Purple Line13.104.8018.2244.30 %17
Green Line20.204.0024.2039.70 %24
Total33.488.8242.30-41
Rake interchange line00.350.35100%0

Implementation of Phase 1 has been divided into four reaches and two underground sections. The dates of completion of Phase 1 are as follows:-

Section Length (km)[29] Termini Opening date
Reach 1 (east) 6.7 Baiyyappanahalli Mahatma Gandhi Road 20 October 2011
Reach 2 (west) 6.4 Mysore Road Magadi Road 16 November 2015[32][41]
Underground UG2 (east to west) 4.8 Mahatma Gandhi Road Magadi Road30 April 2016
Reach 3 (north) 5.1 Sampige Road Yeshwanthpur 1 March 2014[34]
Reach 3A (north) 4.8 Yeshwanthpur Peenya Industry 1 March 2014[34]
Reach 3B (north) 2.5 Peenya Industry Nagasandra 1 May 2015[36][37]
Underground UG1 (north to south) 4.0 Sampige Road National College 18 June 2017[10]
Reach 4 (south) 4.1 National College Rashtreeya Vidyalaya Road 18 June 2017[10]
Reach 4A (south) 3.9 Rashtreeya Vidyalaya Road Yelachenahalli 18 June 2017[10]

Phase 2

The State Government accorded approval vide Order No. UDD 127 BMR 2010 dated 4 January 2011 for preparation of the detailed project report (DPR) for Phase 2 by the DMRC.[18][42] The high power committee (HPC), in July 2011, gave in-principle clearance to proceed with Phase 2.[43] The Karnataka government gave in-principle approval to Phase 2 of the Namma Metro project on 3 January 2012.[44][45] Phase 2 was cleared by the expenditure finance committee (EFC) in August 2013.[46] The Union Cabinet announced that it had approved plans for phase 2 on 30 January 2014.[47] The estimated total cost for Phase 2 is around 26,405 crore (US$3.7 billion).[48] The State Government will contribute 9,000 crore (US$1.3 billion).[49] The project cost of 26,405 crore is the 2011–12 price level, which it is set to escalate at 5 per cent every year with increasing cost of inputs. The Union government will share that part of cost escalation due to increase in central levies, while the Karnataka State and BMRCL have to bear any other escalation. According to the experts, the total project cost for Phase 2 is estimated to reach at least 30,000 crore (US$4.2 billion) at the start of construction itself.

Phase 2 spans a length of 72.095 km (44.798 mi)13.79 km (8.57 mi) underground, 0.48 km (0.30 mi) at grade and 57.825 km (35.931 mi) elevated, and adds 61 stations to the network, of which 12 are underground.[50] Phase 2 includes the extension of the two Phase 1 corridors, as well as the construction of two new lines. The south-end of the Green Line will be extended from Yelachenahalli to Anjanapura Township along the Kanakapura Road and the north-end from Hesarghatta Cross to Bangalore International Exhibition Center (BIEC) on Tumkur Road (NH-4). The east-end of the Purple Line will be extended from Baiyappanahalli to Whitefield and the west-end from Mysore Road to Kengeri. A new 18.82 km (11.69 mi) long fully elevated R V Road – Bommasandra line will be constructed under Phase 2, which pass through the Electronic City. The second new line is the 21.25 km (13.20 mi) Gottigere–Nagawara line. The line is mostly underground (13.79 km or 8.57 mi), but also has a 6.98 km (4.34 mi) elevated and 0.48 km (0.30 mi) at-grade sections. There are 18 stations on the line, of which 12 are underground and 6 are elevated.[18] Unlike Phase 1 of the project, all stations in Phase 2 will have parking facilities.[51]

The Karnataka Industrial Areas Development Board (KIADB) is responsible for acquiring land for the Phase 2. A total of 102.02 hectares (252 acres) of land is required for Phase 2 (including Phase 2A) of the project. BMRCL spent 5000 crore on land acquisition.[52]

Phase 2A

In September 2016, Chief minister of Karnataka, Siddaramaiah announced that a new 17 km (11 mi) long line connecting Silk Board with K.R. Puram would be included in Phase 2 of the project (categorized as Phase 2A). The line will be called the Outer Ring Road Metro (ORR Metro) and is proposed to have 13 stations – Silk Board, 14th Main Road in HSR Layout, Agara, Iblur Junction, Bellandur, RMZ Ecospace, New Horizon College, Rainbow Hospital, Kadubeesanahalli, Marathahalli, Doddanekundi, Mahadevapura and K.R. Puram.[53] It is estimated to cost 4202 crores. The cost will be shared equally by the Centre and the State Government.[54] The BMRC hopes to procure up to 2,000 crore in funding from private companies whose offices are located along the Outer Ring Road.[55] The ORR Metro will have interchange stations with the extended Purple Line at K.R. Puram and with the proposed R V Road – Bommasandra line at Silk Board.[56]

The BMRCL prepared the detailed project report on the proposed line, and submitted the DPR to the state government on 28 October 2016.[57] Phase 2A was approved by the State Cabinet on 1 March 2017.[58][59]

Phase 2 consists of extensions for all four reaches of the metro and three new lines.[60][61]

Proposed new lines and extensions to existing lines – under Phase 2 & 2A
Line Terminals Length New Stations Expected Work Completion date
Purple Line Mysore Road – Challegatta near Kengeri 8.81 km 6 2020[62]
Purple Line BaiyyappanahalliWhitefield 15.50 km 13 March 2023[12]
Green Line Yelachenahalli – Anjanapura 6.29 km 5 2020[62]
Green Line Hessarghatta Cross – BIEC 3.77 km 3 March 2023[12]
Line 3 R V Road – Bommasandra 18.82 km 16 March 2023[12]
Line 4 Gottigere – Nagawara – Bangalore Airport 50.87 km 24 March 2023[12]
ORR Metro Silk Board – K.R. Puram 17 km 13 2020[63]

Construction

The Indian Institute of Science prepared the design for the extension of Reach 1. The BMRCL spent 107 crore (US$15 million) to acquire 57 properties for the extension of Reach 2.[64] An estimated 313 heritage trees are planned to be cut down to build Phase 2.[65] On 28 February 2015, the Chief Minister Siddaramaiah set December 2020 as the deadline to complete Phase 2.[66] In March 2017, the Karnataka Government postponed the deadline to 2022.[67]

In October 2016, the BMRCL floated tenders for the extension of the Green Line from Nagasandra up to the Bangalore International Exhibition Centre (BIEC). The 3.031 km (1.883 mi) extension is estimated to cost 247.41 crore. The contract includes the construction of the viaduct, road widening works, and construction of three elevated stations – Manjunathanagar, Jindal and BIEC. The BMRCL estimates that the work will be completed within 27 months from date that construction begins. The BMRCL also began civil work on the southern extension of the Green Line from Yelachenahalli to Anjanapura Road (6.29 km or 3.91 mi) and the western extension of the Purple Line from Mysore Road to Kengeri (8.81 km or 5.47 mi). Construction work on the Purple Line corridor was awarded in two packages for 660 crore, while the Green Line extension was awarded to Nagarjuna Constructions Company Ltd for 508.86 crore.[68] The BMRCL floated tenders for the construction of the 15.5-km stretch from Baiyappanahalli to Whitefield in December 2016.[69]

Tenders for the construction of the R V Road – Bommasandra line were floated in 3 packages.[70] On 9 December 2016, the agency floated tenders for the construction of 6.418 km (3.988 mi) stretch from Bommasandra to Hosa Road station, including depot entry line to Hebbagodi depot. The work involves the construction of five Metro stations — Bommasandra, Hebbagodi, Huskur Road, Electronic City-II and Electronic City-I.[71] Tenders for the 6.38 km (3.96 mi) stretch from Hosa Road to HSR Layout were floated the next day. Work is expected to begin by June 2017, and be completed within 27 months.[72] Both packages were awarded to Thailand-based ITD Cementation India in May 2017.[73]

The BMRC plans to float the tenders for the construction of the 21.25 km (13.20 mi) Gottigere-Nagawara in five packages. Tunnelling and construction of the underground stations will be taken up in four packages, while the elevated viaduct and stations will make up the remaining package. The total cost of the line is estimated to be 11,014 crore (US$1.5 billion). The elevated section is estimated to cost 575.52 crore (US$80 million).[74][75] In March 2017, the BMRC floated tenders for the construction of a 7.5 km (4.7 mi) elevated section between Gottigere and Swagat Cross stations (called Reach 6). The tender includes construction of the elevated viaduct, 5 stations and car depot on a 34-acre plot in Kothanur. A separate tender will be floated for the 13.9 km (8.6 mi) section of the line from Dairy Circle to Nagawara. The agency also floated tenders for the remaining section of the RV Road-Bommasandra line, the RV Road to Silk Board stretch (called Reach 5).[76][77]

Phase 2 is expected to be completed in 2022.

The exact location of stations along with a map of Phases 1, 2 and 2A are shown here.[78]

Phase 3

RITES began preparing the feasibility study for Phase 3 in 2014.[79][80]

The State Urban Development Ministry proposed that Phase 3 have a total length of 127 km (79 mi). The Phase will include two lines that cover the Outer Ring Road (ORR) on the eastern and western side, and additional lines to connect the lines constructed in the previous two phases. A 33 km (21 mi) line is proposed to cover the eastern portion of the ORR from Silk Board to Hebbal, while a 31.37 km (19.49 mi) line will cover the western portion of the road. A 21.31 km (13.24 mi) line linking Hosakerehalli to ORR at Marathahalli passing through Old Airport Road is also proposed to serve the areas of Domlur, Konena Agrahara and HAL. Other proposed lines include a 33-km line from Carmelaram(Sarjapur Road) to Yelahanka, passing through Central College, Palace Guttahalli, Mehkri Circle and Hebbal; and an 8.89 km (5.52 mi) line from Nice Road to Toll Gate (Magadi Road).[81]

There was a proposal to build a 33 km (21 mi) line known as Bangalore High-Speed Rail Link, from MG Road to Bangalore International Airport (BIA), at a cost of 5,767 crore (US$800 million).[82] Previously, there was plan for an independent body, but later it was decided that BMRC will manage this project.[83] It was later decided to build the airport link as a regular metro line.

In September 2016, RITES suggested nine possible extensions from the existing and proposed metro lines to the airport. The state government invited the public to submit feedback on their preferred route. The nine proposed extensions have an average length of 30 km (19 mi), and each is estimated to cost between 4,500 crore and 7,000 crore.[84] A 25.9 km (16.1 mi) extension from Nagawara via Kannur and Bagaluru was the shortest, while the 35.4 km (22.0 mi) extension Yeshwanthpur via Yelahanka, Kannur and Bagaluru was the longest of the proposed routes.[85] The BMRC received 1,300 responses from the public.[86]

A 25.9 km (16.1 mi) extension of the Gottigere–Nagawara line via Kannur and Bagaluru up to the airport emerged as the most popular choice.[87][88] In February 2017, the Centre requested the BMRC to start work on the airport link before the rest of Phase 3.[89] The Bangalore International Airport Limited (BIAL) forbade constructing an underground road or metro tunnel from the southern side of the airport due to security reasons. Such a construction would have to pass underneath the airport's second runway before entering the terminal buildings. This restriction eliminated three of the 9 proposed extensions to the airport. All three proposals were extensions of the Gottigere-Nagwara line to the airport.[90]

Bangalore Development Minister K. J. George announced on 12 May 2017 that the government had finalized the Nagawara-Ramakrishna Hegde Nagar-Jakkur-Yelahanka route to the airport.[91]

Opening

Namma Metro was originally scheduled to begin operations in March 2010. Deadlines for completion were repeatedly missed,[92] and the metro was finally opened to the public on 20 October 2011 by Union Urban Development Minister Kamal Nath.[93] There was an overwhelming response to the metro at the commencement of operations. As per BMRCL sources within first 3 days of operations 169,019 people used this mass transit system.[94] At the end of 4th day about 200,000 passengers had already commuted in Namma Metro. Namma Metro's first 12-day cumulative revenue was 1 crore (US$140,000).[95]

The State Government removed N Sivasailam as MD of Namma Metro on 10 August 2013. He was replaced by Pradeep Singh Kharola.[96][97][98] The Green Line (Reach 3, 3A & 3B) was initially scheduled to be opened for the public by the end of 2012. However, according to the BMRCL, because of the time taken by the Indian Railways to approve works at Swastik Station and Malleswaram 66-metre metro viaduct, the Green Line was expected to open only in April–May 2013. However, the timelines were delayed further.

The line was opened to the public at 6 am on 1 March 2014.[99] BMRCL Managing Director Pradeep Singh Kharola stated that about 25,000 passengers travelled on the line on opening day.[34] In the first month of operations, 7.62 lakh people at an average of 24,605 people daily used the line, generating a revenue of 1.5 crore (US$210,000). The first underground portion of the East-West Corridor (UG2) commenced operations on 30 April 2016, completing the entire Purple Line stretch and Phase 1, including the North-South Underground section,was completed on 18 June 2017.[100]

Finances

Funding

Phase 1

Phase 1 missed nine deadlines, and its cost was revised four times. The original estimated cost of Phase 1 of the Namma Metro was 6,395 crore (US$890 million) when the project was approved in 2006. The expansion of the length of Phase 1 from 33 to 42.3 km (20.5 to 26.3 mi) increased the total cost to 8,158 crore (US$1.1 billion). Delays caused further escalations in the project cost. The cost escalated to 11,609 crore (US$1.6 billion) in 2011, and 13,845 crore (US$1.9 billion) in 2015. The final cost to build Phase 1 was estimated at 14,405.01 crore (US$2.0 billion).[19] Land acquisition for Phase 1 of the project cost 2,500 crore (US$350 million).[64]

The Central and State Government funded 58.91% of the total project cost. The remaining 41.09% was secured through loans from domestic and foreign financial institutions.[19] BMRCL secured 6,500 crore (US$910 million) through long-term loans and 300 crore (US$42 million) by selling bonds, while the remaining project cost was funded by Central Government and the State Government. BMRCL secured loans from several agencies – 3,000 crore (US$420 million) from the Japan International Cooperation Agency (JICA), 600 crore (US$84 million) from the Housing and Urban Development Corporation Limited (HUDCO), 25 crore (US$3.5 million) from the Asian Development Bank (ADB), and the rest from the French Development Agency. Approximately 10% of the 6500 crore must be paid as interest by the BMRCL every year. The Federation of Karnataka Chambers of Commerce and Industry estimated that this amounted to an interest payment of 2 crore (US$280,000) per day. The BMRCL refuted claims that the interest was that high, but confirmed that it was "definitely more than 1 crore (US$140,000) per day."[64]

BMRCL announced plans on 13 June 2013 to issue 10-year bonds.[101] The proposed bonds received a credit rating of "IND AA" from India Ratings & Research (Ind-Ra),[102] a Chennai-based research company.[103] Namma Metro MD N. Sivasailam announced on 3 August 2013 that the issue of bonds would be postponed as the market was volatile. Sivasailam stated that the metro would "be in the market soon and when it is stable."[104]

Phase 2

On 3 January 2012, the Karnataka government approved a budget of 27,000 crore (US$3.8 billion) for Phase 2 of Namma Metro project.[105] Phase 2 is estimated to cost 26,405 crore (US$3.7 billion). Land acquisition is expected to cost 5,000 crore (US$700 million).[64] The Central and State Governments will fund around 15,000 crore of the project cost.[106] The State and Central Governments will bear 30% and 20% of the total project cost of Phase 2 respectively. The remaining amount will be obtained through senior term loans.[107] The BMRCL is permitted to raise up to 9,000 crore through loans.[106]

On 27 March 2012, the Asian Development Bank (ADB) signed an agreement to lend $250 million to BMRC to part-finance Phase 2 of the metro rail project. The loan marked the multilateral lending agency's foray into the urban transport sector in South Asia, the ADB said in a press release. The loan, approved by the ADB Board in March 2011, is the first ADB loan to the urban transport sector without recourse to sovereign guarantees.[108] In 2016, the Agence Francaise De Development (AFD) sanctioned a 1,600 crore loan for the project. The rate of interest on the loan is linked to Euro Interbank Offered Rate (Euribor) + 130 basis points. In early 2017, the European Investment Bank agreed to loan 3,700 crore to the BMRCL, with a repayment period of 20 years at a rate of interest lower than the one on the AFD loan.[106][109]

In May 2017, BMRC received in-principle approval from the European Investment Bank (EIB) to fund construction of the Gottigere-Nagawara line through a 3700 crore loan.[110] The line will also be funded by the AIIB, and the Central and State Governments.[111]

Indian firms Biocon and Infosys announced that they would provide funding for the construction of the Hebbagodi and Electronics City metro stations respectively on the Outer Ring Road Metro line. BMRC expects that each firm will contribute 100 crore (US$14 million) towards the project. Biocon CMD Kiran Mazumdar Shaw stated that the company wanted to fund the project because it would help decongest the city. Both Biocon and Infosys have offices located near the stations.[112]

Revenues

During the first month, since the opening of Reach I, about 1,325,000 people traveled by the metro.[113] On average, 41,390 people took the train every day, while the average daily revenue was 667,262. The BMRC earned a revenue of 2.1 crore (US$290,000) in its first month of operation.[114] In the first six months of operation, average ridership went down to 24,968. The BMRC earned a total of 6.6 crore (US$920,000) during the same period.[115] Namma Metro posted a profit of 41 lakh (equivalent to 55 lakh or US$77,000 in 2017) after almost one year of operating Reach I. BMRCL estimates that nearly 80 lakh passengers travelled on the system, in its first year of operations.[116]

The following table shows the annual ridership and revenue of the Namma Metro since its inception.[117]

YearPassengersRevenue ( crore)
2011–124,166,0006.17 crore
2012–136,636,0008.70 crore
2013–147,255,0009.86 crore
2014–1511,400,00017.83 crore
2015–1616,800,00028.28 crore

Infrastructure

Interior of the Metro coach on inauguration day
MG Road Station at night

Rolling stock

The specification for rolling stock is based on stainless steel-bodied three-car formations, a trailer between two motored driving units. Internal wide gangways provide ease of passenger movement and assist in load distribution. Trains are air-conditioned throughout with designated space for disability access. Although with many automated functions, trains are under driver control.

Initially the bids by Bombardier and Siemens, Alstom Projects India Ltd and consortium comprising BEML, Mitsubishi and Hyundai Rotem were shortlisted to supply the rolling stock and coaches. In February 2009, the BEML-led consortium was awarded the contract to supply 150 coaches and rolling stock for the first phase of the project. While Mitsubishi would supply the traction for the coaches, Hyundai Rotem would supply the rolling stock and BEML would supply the coaches for Phase I.[118] The first train set made a trial run in December 2010.[119] In early 2017, the BMRC floated tenders for an additional 150 coaches to provide 6 coach trains on the entire Phase 1 route.[120] On 27 March 2017, BEML announced that it had won an 1,421 crore contract to supply the coaches.[121] The company stated that it would begin supplying the rolling stock by June 2018 and hand over all 150 coaches by December 2019.[122][123][124]

All metro trains are Wi-Fi enabled (the first metro in India to have this feature), so passengers can use laptops, tablets as well as mobile internet.[125] The free Wi-Fi service was made available to commuters on 31 July 2013.[126] Passengers also have emergency voice communication with train staff through a speaker system. Passengers are provided with a call button to communicate anything to the driver or control center during an emergency.[125]

Power supply

Namma Metro was the second rail transport system in India (the first was Kolkata Metro) to use 750 V DC third rail traction.[65] In December 2009, the ABB Group was awarded the contract to provide power solutions for the first phase of the planned metro network. ABB designed, supplied, installed and commissioned four substations that receive and distribute electricity, each rated at 66/33 kV, as well as the auxiliary and traction substations. ABB also provided an integrated network management system, or SCADA (Supervisory Control And Data Acquisition), to monitor and control the installations.[127] The BMRC currently pays BESCOM 5.7 per unit of electricity.[128]

In 2016, BMRCL signed an agreement with CleanMax Solar to set up solar installations at Baiyapanahalli and Peenya stations. After Phase 2 of the metro is complete, CleanMax Solar will set up similar installations at the metro depots in Challaghatta, Whitefield, Kothanur and Hebbagodi. Per the agreement, CleanMax Solar will bear the cost of installation and the BMRC will pay CleanMax a rate of 5.5 per unit of electricity for three years. Following the three-year period, all six installations will be transferred to the BMRC. According to the BMRC director of operations NM Dhoke, "The 1.4 MW installation can generate up to 10,000 units, which help power the depot facilities. However, it is not sufficient to power the trains, but it will help us save 51 crore over 25 years on energy."[128]

Signaling

In September 2009, the consortium led by Alstom Project India Limited were awarded a contract worth 563.4 crore (US$78.5 million) to supply control and signalling system for the first phase of the project. The consortium is led by Alstom and composed of Alstom Transport SA, Thales Group Portugal S A and Sumitomo Corporation. Alstom will provide the design, manufacture, supply, installing, testing and commissioning of the train control and signalling system and Thales will provide the design, installing, testing and commissioning of the telecommunication system for Phase 1 of the metro system. It includes the Urbalis 200 Automatic Train Control system which will ensure optimal safety, flexible operations and heightened passenger comfort.[129][130]

The integrated control centre at Byappanahalli has direct communication with trains and stations are CCTV fitted with visual and audio service information.[125] Passengers have emergency voice communication with train staff.

Stations

There are 30 stations on the Namma Metro. With a total surface area of 48,000 square metres (520,000 sq ft), the Majestic station is the largest metro station in India.[131]

Initially, there were no toilets at Namma Metro stations, despite demand from commuters. BMRCL countered the demand by arguing that constructing toilets was not part of the metro construction plan, and that building toilets in the city was the responsibility of the Bruhat Bengaluru Mahanagara Palike (BBMP). They also justified the decision by saying that commuters spent "hardly five minutes" at stations, so restrooms were not required, and also that none of the Bangalore Metropolitan Transport Corporation (BMTC) bus stops in the city had toilets for passengers. However, BMRCL eventually heeded public demand, and the metro's first toilets were opened at Baiyappanahalli and Indiranagar stations on 21 June 2013.[132] As of February 2017, there are 33 ATMs at Namma Metro stations.[133]

On 17 February 2017, Uber announced that it would open booking counters at 12 metro stations by the end of March. The counters enable commuters to book an Uber taxi, and is aimed at commuters who do not have access to the internet or do not have the Uber app installed on their phone.[134] Ola Cabs announced a similar arrangement on 22 February 2017.[135][136]

Vertical gardens

The BMRC granted permission to Hydrobloom, a start-up company, to grow hydroponic plants on the pillars of the Namma Metro. Pillars covered with plants are referred to as vertical gardens. Hydrobloom had previously developed a vertical garden on a metro pillar near Rangoli Art Centre next to the MG Road Metro station. The gardens are intended for beautification and to reduce air pollution.[137]

Safety

As of February 2014, BMRCL has two road-cum-rail rescue vehicles that can be used to perform evacuations or re-load derailed trains back onto the track.[138]

The trains are equipped with derailment prevention equipment, and the tracks are equipped with concrete barriers to prevent trains from leaving the viaduct. The support pillars are earthquake proof and are designed to have a lifespan of at least 100 years. Trains are equipped with sensors to detect impending collisions, and have automatic braking systems to prevent speed limits from being exceeded.[139]

Accessibility

Yellow tactile tiles are used at all stations to guide the visually impaired. The tiles start at the ramp and lead to the staircases and lifts.[140] Disabled and elderly passengers can avail a wheelchair at all metro stations. The wheelchair can be used by the passenger to board a train and then dropped off at the destination station.[128] In February 2017, the BBMP and the BMRC began a project to upgrade all footpaths along the Phase 1 route. The project is estimated to cost 40 crore and is scheduled to be completed in 18 months.[141][142]

Rainwater harvesting

BMRCL, in a public-private partnership, harvests rainwater from the viaducts on the rail system. The private partner, Karnataka Rural Infrastructure Development (KRIDL), collects the water at multiple points, treats it, and sells it in bulk as potable water.[143] Pipes inside each metro viaduct pillar carry the rainwater from the viaduct down to underground tanks located beneath the median. When these tanks overflow, the water is diverted to 5 metre deep rainwater harvesting pits. Two rainwater harvesting pits are installed between each pillar. The average distance between two pillars is 28 meters. As of March 2017, a 33.48 km (20.80 mi) of elevated metro are covered by the rainwater harvesting system. With the completion of Phase 2 of the metro, the BMRCL will cover a total of 58 km (36 mi) with rainwater harvesting systems.[144] Around 8 crore litres of water are expected to be collected annually.[145]

BMRCL also plans to harvest rainwater from the 140 acre depot facility at Peenya. Water will be collected from the 190,000 sq foot roof and stored in two tanks with a capacity of 50,000 litres each. Rainwater harvesting is also planned in the existing and under-construction stations. The water harvested will be supplied to places where needed, and any excess will be used for groundwater recharge.[145]

BMRC has installed a water harvesting system along Reach 1 and will be doing the same for Reaches 3 & 4. Installation of flower beds was delayed due to garbage being dumped on the median by garbage collectors, BMRC will also set up flower beds on Reach 1 with assistance from the horticulture department. However, the work related to this has slowed down due to garbage contractors dumping garbage along the median, due to the lack of a waste management plan in the city.[146] BMRC will rejuvenate Kengeri and Veerasandra lakes using water collected from a nearby corridor.[147][148]

Operations

Fare collection

The obverse of an entry token issued
Bangalore Metro Ticket (Token)-Kempegowda Tower Symbol view

MIFARE DESFire platform, developed by NXP Semiconductors, was selected to manage the Automated Fare Collection (AFC) in Namma Metro.[149] The system uses contactless smart tokens and contactless smart card.[150] Tokens are available only for a single journey.[18] Smart cards can be used for multiple journeys.[18] There are 3 types of smart cards available on the metro – Varshik, Saral and Saraag.[151]

  • Varshik is priced at 100. It is valid for a year, and provides a 15% discount on fares. The card can be recharged.
  • Saral costs 70. It permits one day's travel on BMTC non-air-conditioned buses and on the metro.
  • Saraag costs 110. It permits one day's travel on BMTC air-conditioned buses and on the metro.[152]
    • Sanchar was available in denominations of 10, 40, 50 and 100. Sanchar was withdrawn from 1 March 2017.[153][154]

BMRCL began selling tokens through automatic ticket vending machines (ATVMs) on 4 December 2012 at the MG Road, Indiranagar and Baiyyappanahalli stations. The service will eventually be expanded to all metro stations. The touchscreen enabled ATVMs are available in 3 languages – English, Kannada and Hindi. Commuters can purchase a single journey token by selecting the destination station or the amount in the ATVM. They can also add value or add trips to the contactless smart card. Commuters can purchase up to 8 tickets at a time and can get the receipt print for card recharge. ATVMs accept coins of 5 and 10 denominations and 10, 20, 50, 100, 500 denominations of currency notes. However, the ATVM cannot differentiate between 1 and 2 coins.[155][156]

In November 2016, BMRC began accepting online payments to recharge smart cards. Tickets cannot be purchased online.[157]

Approximately 68% of passengers on the metro use smart tokens and 32% use smart cards.[116]

Frequency

The metro service runs between 05:00 and 23:00 hours. On Sundays the service starts at 08:00 hours. There are trains every 8 minutes between 08:00 and 20:00, and every 10 minutes at other times.[158] On weekdays, trains operate at 4-minute intervals between 09:00 and 10:00.[159] The headway on the entire system is slated to decrease to once every three minutes after the completion of Phase I.[128] The end-to-end travel time on the Purple Line is 35 minutes, and on the Green Line will be 45 minutes.[160]

Metro services have occasionally operated beyond 2300 hours. Services are usually extended on festival days or when an international cricket match is held in Bangalore.[161][162]

Ridership

As of December 2017, daily ridership on Namma Metro averaged between 360,000 and 370,000 passengers.[163] The annual ridership in the 2015–16 fiscal year was 16.8 million. Statistics for the annual ridership of the entire phase 1 network is awaited.

The highest recorded daily ridership on the Namma Metro was 4,10,050 commuters on 28 September 2017. The revenue through ticketing fare touched an all-time high of approximately Rs 9,576,000.[163]

Speed

The system is designed for a maximum train speed of 80 km/h (50 mph). However, the Research Design and Standards Organization (RDSO) fixed the speed at which trains are allowed commercially operate at 67.50 km/h (41.94 mph) on straight sections, 35 km/h (22 mph) on curves, and 45 km/h (28 mph) in stations.[164]

Security

The Karnataka State Industrial Security Force (KISF) is responsible for security on the Namma Metro.[165] Bangalore Police conducted detailed mock drills at metro stations for the first time on 25 March 2017. Police officials stated that the drill was to assess readiness to deal with situations such as hoax bomb calls, terrorist infiltration or attacks. Sniffer dogs, bomb detection and disposal squad, anti-sabotage squad and Quick Reaction Teams (QRTs) were involved in the drill. Police had previously conducted basic mock drills, but this was the first one aimed toward dealing with specific threats. The chosen day was a Saturday, when crowds are usually larger, in order to make the drill more challenging for officers. The BMRCL has not informed of the drill in advance.[166]

Laws

The Bangalore Metro Rail (Carriage and Ticket) Rules 2011 limit the weight of personal baggage to 15 kg. Rule 3 says: "No person shall, while travelling in metro railway, carry with him any goods other than a small baggage containing personal belongings not exceeding 60cm x 45cm x 25cm in size and 15kg in weight, except with the prior approval of the metro railway administration." The rules also prohibit carrying explosive, inflammable, and poisonous substances.[167]

The Metro Railway (Operation and Maintenance) Act, 2002, imposes fines and in some cases jail sentences for offences committed on the metro. Anyone indulging in sabotaging the train or maliciously hurting or attempting to hurt other passengers while travelling in the metro can face imprisonment up to 10 years. Pasting posters or drawing graffiti on the walls of stations or trains is punishable by a fine of 1,000 or imprisonment for up to 6 months. Traveling in an inebriated state or creating nuisance in the train is punishable by a 500 fine.[168] Passengers are monitored at security checkpoints and those that are causing trouble, heavily drunk, or carrying forbidden items are not permitted to board.[169] Spitting on the metro premises is punishable by a fine of 100.[170]

Mobile app

The BMRCL launched a Namma Metro app for Android devices in 2013. However, it had limited features.[171] The app was officially re-launched on 4 November 2016 with additional features.[172] The app was developed by the Centre for Development of Advanced Computing (CDAC). The app allows users to purchase and recharge smart cards, locate nearby metro stations and also provides information related to parking, train frequency, route map, and fare details.[128][173]

Several films and commercials have been shot on the Namma Metro premises. The BMRCL charges 50,000 (US$700) for shooting inside a metro station, and 40,000 (US$560) for shoots inside a metro train during peak hours between 6 am to 10 pm. During non-peak hours, from 10 pm to 4 am, the agency charges 50,000 (US$700) for shoots inside metro stations and 20,000 (US$280) inside a train. The film producers must also make a security deposits of 5 lakh (US$7,000), as insurance for metro property. Film shoots are permitted during three slots – 6 to 8 am, 12 pm to 2 pm and 9 to 11 pm. Kannada films can avail lower rates.[174]

The first film to film on the Namma Metro was the Kannada Blockbuster Ugramm in 2013. Later many other Kannada movies were shot on the system.

The 2012 Malayalam film 22 Female Kottayam also have got a song sequence shot in Namma Metro coach.

In December 2016, Tamil film Imaikkaa Nodigal became the first film to shoot scenes inside the underground tunnel stretch of the Purple Line. According to BMRC officials, prior to this film, one Kannada film, one Telugu film and several commercials had been shot on the Namma Metro premises.[174]

See also

References

  1. "Metro Phase I Will be Ready by May, to Miss Deadline". The New Indian Express. 22 October 2015.
  2. "Namma Metro ridership is up to 4.10 lakh/day".
  3. "Passengers welcome higher Namma Metro frequency - KARNATAKA". The Hindu. 2017-02-28. Retrieved 2018-01-14.
  4. 1 2 3 "Project Highlights". Official webpage of B.M.R.C. Archived from the original on 25 October 2011. Retrieved 3 May 2010.
  5. "Namma Metro". English.bmrc.co.in. Retrieved 2018-01-14.
  6. "Bengaluru's Namma metro 2nd longest after lucknow metro".
  7. "South India's second underground Metro launch on April 29". The Times of India. Retrieved 26 April 2016.
  8. "BMRCL to issue bonds to raise Rs. 500 crore". The Hindu. Chennai, India. 14 June 2013.
  9. Correspondent, Special. "Namma Metro fares hiked, timings extended". The Hindu. Retrieved 2017-06-20.
  10. 1 2 3 4 "All of Bangalore Metro Phase-1 will be up and running from June 18". The New Indian Express. Retrieved 15 June 2017.
  11. 1 2 3 "A closer look at Namma Metro that can transform Bengaluru's mobility landscape". Economic Times. 9 June 2017. Retrieved 9 June 2017.
  12. 1 2 3 4 5 Karnataka Government, Bengaluru (2017-05-01). "Delay in Phase II". Retrieved 2017-05-01.
  13. "Indian cabinet approves the project". Online Edition of The Economic Times. 28 April 2006. Archived from the original on 25 June 2007.
  14. "Award of contract" (PDF). Official webpage of B.M.R.C. Archived from the original (PDF) on 28 September 2007. Retrieved 2 October 2011.
  15. "PM lays foundation stone for Metro project". PM office website. Archived from the original on 11 May 2011.
  16. "Bangalore Metro Rail Work to begin on Feb 3, 2007". The Times of India. 21 January 2007. Retrieved 16 October 2007.
  17. "Jaipur Metro completed in record time, but limping in commercial run". The Times of India. Retrieved 29 August 2015.
  18. 1 2 3 4 5 6 7 "Bangalore Metro Rail Project Phase 2" (PDF). bmrc.co.in. BMRC. Archived from the original (PDF) on 12 April 2015. Retrieved 5 June 2015.
  19. 1 2 3 4 "Cost and & time overrun marks Bengaluru metro phase-I – The Economic Times". The Economic Times. Retrieved 9 March 2017.
  20. Rohith B R, Bangalore, DHNS: (14 October 2012). "Automation helps precise work on metro tunnels". Deccan Herald. Retrieved 4 March 2013.
  21. RohithB R, Bangalore, DHNS : (13 October 2012). "Metro makes steady inroads". Deccan Herald. Retrieved 4 March 2013.
  22. Special Correspondent (28 September 2012). "A smoother passage for Margarita". The Hindu. Chennai, India. Retrieved 4 March 2013.
  23. Bangalore, DHNS : (23 September 2012). "Tunnelling along north–south corridor to begin soon". Deccan Herald. Retrieved 4 March 2013.
  24. Update : 06:47 pm IST (18 December 2012). "Metro rushes to meet deadline". Deccan Chronicle. Archived from the original on 6 January 2013. Retrieved 4 March 2013.
  25. Bangalore, DHNS (21 February 2013). "After Helen, Margarita, it's Krishna and Kaveri". Deccan Herald. Retrieved 4 March 2013.
  26. "2015 to be a milestone year for Namma Metro". Deccan Chronicle. Retrieved 29 August 2015.
  27. "The Metro Rail Guy | Bangalore Metro Begins Full Length Trials on Purple Line from Baiyappanahalli to Mysore Road". Retrieved 2015-11-25.
  28. 1 2 "Schematic Route Map". Bangalore Metro Rail Corporation Limited. Archived from the original on 14 August 2015. Retrieved 5 June 2015.
  29. 1 2 "Namma Metro: Metro Network". Bangalore Metro Rail Corporation Limited. Archived from the original on 14 August 2015. Retrieved 5 June 2015.
  30. "Namma metro to chug on October 20". IBN Live. 1 October 2011. Retrieved 21 October 2011.
  31. "Namma Metro inaugurated in Bangalore". Railway Gazette International. 24 October 2011. Retrieved 5 June 2015.
  32. 1 2 "Underground metro will be ready to take commuters in 15 days: K J George". Times of India. 19 April 2016. Retrieved 19 April 2016.
  33. "Sampige Road-Peenya Metro Line Inaugurated". The New Indian Express. 1 March 2014. Retrieved 5 June 2015.
  34. 1 2 3 4 "25,000 ride Green line Metro on 1st working day". Deccan Herald. 3 March 2014. Retrieved 5 June 2015.
  35. "Rajajinagar, Peenya residents can smile". The Times of India. 28 November 2011.
  36. 1 2 "Metro Reach 3B to be opened on May 1". Deccan Herald. 24 April 2015. Retrieved 5 June 2015.
  37. 1 2 "Reach 3B of Metro rail flagged off". The Hindu. 1 May 2015. Retrieved 5 June 2015.
  38. "Bengaluru Metro Rarely Met Deadlines Expect no Surprise in April 2017". Economic Times. 23 March 2017. Retrieved 12 April 2017.
  39. "A city begins to fulfill a Metro dream". The Indian Express. 20 October 2011. Retrieved 3 January 2012.
  40. "GOK order on Metro Extension" (PDF). Official webpage of B.M.R.C. Archived from the original (PDF) on 11 October 2011. Retrieved 26 November 2008.
  41. "The Metro Rail Guy – A Look Back into the History of Bangalore Metro's Magadi Road – Mysore Line". themetrorailguy.com.
  42. "State Cabinet approves phase-II of metro". Business Standard. 4 January 2012. Retrieved 6 March 2012.
  43. "Metro project: Cabinet approves two new lines for Phase 2". The Times of India. 4 January 2012.
  44. Bangalore, DHNS:. "Centre's nod for Phase-II of Metro may take 6 months". Deccan Herald. Retrieved 6 March 2012.
  45. "Cabinet clears Namma Metro Phase 2 – Bangalore – DNA". Daily News and Analysis. 4 January 2012. Retrieved 6 March 2012.
  46. Neha Sethi; Rahul Chandran (2013-09-05). "EFC clears `26,405 cr for Bangalore Metro phase II". Livemint. Retrieved 2013-09-28.
  47. IRJ (30 January 2014). "Go-ahead for Bangalore metro phase 2".
  48. "Cities / Bangalore : Frame policy for differential fare pricing, BMRCL told". The Hindu. Chennai, India. 22 February 2012. Retrieved 6 March 2012.
  49. "Underground Bengaluru Metro Station service flagged off, Siddaramaiah seeks Centre's help for Namma Metro phase III | Latest News & Updates at Daily News & Analysis". dna. 29 April 2016. Retrieved 29 April 2016.
  50. "Metro gets poll push for Phase II". Deccan Chronicle. 2013-06-04. Retrieved 2013-09-28.
  51. "Metro Phase 2 will be bigger, better, says BMRCL chief". Deccan Herald. Retrieved 13 January 2017.
  52. "Bengaluru Metro phase 2 land acquisition on track – The Economic Times". The Economic Times. Retrieved 13 April 2017.
  53. "Metro line from Silk Board to KR Puram to be fast-tracked". The Times of India. Retrieved 18 September 2016.
  54. "Metro link to Outer Ring Road: BMRC unveils DPR, invites suggestions – Times of India". The Times of India. Retrieved 17 February 2017.
  55. "BMRCL mines private companies along route to partially fund ORR metro line – Bangalore Mirror -". Bangalore Mirror. Retrieved 20 February 2017.
  56. "Outer Ring Road route may have 13 Metro stations". Deccan Herald. Retrieved 2 November 2016.
  57. "Silk Board-KR Puram Metro link takes a step closer to reality". The Times of India. Retrieved 2 November 2016.
  58. Correspondent, Special. "Karnataka Cabinet approves ORR metro line". The Hindu. Retrieved 2 March 2017.
  59. "Silk Board to KR Puram Metro link approved – Bangalore Mirror -". Bangalore Mirror. Retrieved 2 March 2017.
  60. "Metro project: Cabinet approves two new lines for Phase 2". Times Internet. 4 January 2012. Retrieved 8 September 2014.
  61. "Green signal for Metro's Phase II". The Times of India. 22 February 2012. Retrieved 6 March 2012.
  62. 1 2 "Opening up of first two Bengaluru Metro lines of Phase-II pushed to 2020". The New Indian Express. Retrieved 8 October 2018.
  63. Naveen Menezes, Bengaluru, DHNS: (2016-11-12). "Silk Board-KR Puram Metro DPR out; project to be ready by 2020". Deccanherald.com. Retrieved 2017-02-11.
  64. 1 2 3 4 "Metro June Deadline Stands, But With Rider". The New Indian Express. Retrieved 27 April 2016.
  65. 1 2 "Lessons from phase 1: Can Bengaluru Metro beat deadline blues in underground trail? – Firstpost". Firstpost. 27 April 2016. Retrieved 27 April 2016.
  66. "Sampige Road-Peenya Metro Line Inaugurated". The New Indian Express. 1 March 2014. Retrieved 8 September 2014.
  67. "It is official: Metro phase 2 completion could be in 2022 – The Economic Times". The Economic Times. Retrieved 8 March 2017.
  68. "BMRCL invites bids for 3-km extension from Nagasandra". Deccan Herald. Retrieved 5 November 2016.
  69. "BMRCL floats another tender for civil work on Whitefield corridor". Deccan Herald. Retrieved 7 March 2017.
  70. "Tender for Electronics City metro reach issued – Bangalore Mirror -". Bangalore Mirror. Retrieved 7 March 2017.
  71. "Metro floats tenders for Electronics City route". The New Indian Express. Retrieved 11 December 2016.
  72. Reporter, Staff. "Electronics City inches closer to being on metro map". The Hindu. Retrieved 11 December 2016.
  73. "Thai company ITD will build stations on e-city line in Bengaluru". The Economic Times. Retrieved 11 May 2017.
  74. "Gottigere-Nagawara Metro line estimated to cost Rs 11,014 crore". The Economic Times. Retrieved 16 March 2017.
  75. "BMRCL to construct a 11,014 Cr metro line in Bengaluru". Dalal Street Investment Journal. Retrieved 16 March 2017.
  76. "Tenders called for Metro phase 2 stations". Deccan Herald. Retrieved 7 March 2017.
  77. "Dairy Circle to Nagawara metro link announced, but it won't be quick – Bangalore Mirror -". Bangalore Mirror. Retrieved 7 March 2017.
  78. "Bangalore Metro Phase 2 - Information & Map". Themetrorailguy.com. Retrieved 2018-01-14.
  79. "Underground Bengaluru Metro Station service flagged off, Siddaramaiah seeks Centre's help for Namma Metro phase 3". dna. 29 April 2016. Retrieved 29 April 2016.
  80. "Key Metro link opens today, brings east and west closer". Deccan Herald. Retrieved 29 April 2016.
  81. "Namma Metro, a third phase in the making". Deccan Herald. Retrieved 6 June 2016.
  82. "Metro project: Cabinet approves two new lines for Phase 2". The Times Of India. 4 January 2012. Archived from the original on 10 January 2012.
  83. "Metro will have high-speed link to BIA". The Times of India. 21 October 2011.
  84. "Now, suggest a Namma Metro route to the airport". Deccan Herald. Retrieved 18 September 2016.
  85. "Metro route to airport: Govt decision in 10 days – The Economic Times". The Economic Times. Retrieved 21 February 2017.
  86. "What's next for airport commute?". The Hindu. Retrieved 3 March 2017.
  87. "Work on underground stretch could delay Metro Phase II too". Deccan Herald. Retrieved 14 October 2016.
  88. Share on Twitter (2016-12-07). "Bengaluru wants KIA Metro line via Nagawara – Bangalore Mirror". Bangaloremirror.indiatimes.com. Retrieved 2017-02-11.
  89. "Take up KIA metro link before Phase 3: Centre – Bangalore Mirror -". Bangalore Mirror. Retrieved 17 February 2017.
  90. "Metro line likely to enter KIA from Trumpet flyover side". Deccan Herald. Retrieved 11 March 2017.
  91. "Govt finalises KIA metro link route". Deccan Herald. Retrieved 13 May 2017.
  92. "Bangalore Metro misses deadline for 4th time, minister sets Sept 26 as next date : South, News". India Today. 16 September 2011. Retrieved 8 September 2014.
  93. "Metro comes to Bangalore finally". The Times of India. 20 October 2011. Archived from the original on 20 October 2011.
  94. "Revenue Services Report" (PDF). Archived from the original (PDF) on 24 June 2013.
  95. Madhumathi D.S. "Business Line : Industry & Economy / Logistics : Namma Metro rides on 'gawk' power". Business Line. Retrieved 3 January 2012.
  96. "Namma Metro Man Sivasailam shifted". The Times Of India. 11 August 2013.
  97. News, Express (2013-08-11). "Sivasailam shunted out of BMRCL". The New Indian Express. Retrieved 2013-09-28.
  98. "Pradeep Kharola is new Metro chief – Bangalore – DNA". Dnaindia.com. Retrieved 2013-09-28.
  99. Special Correspondent (2014-02-28). "CM in a hurry, delays Namma Metro launch". The Hindu. Retrieved 2014-03-27.
  100. "Byappanahallimg road metro stretch more popular". The Hindu.
  101. "B'lore Metro to raise Rs 300 cr via bond issue". Business Standard. 2013-06-11. Retrieved 2013-09-28.
  102. Anil Urs (2013-06-14). "'IND AA (exp)' rating for Bangalore Metro proposed bonds | Business Line". Thehindubusinessline.com. Retrieved 2013-09-28.
  103. "BMRC proves merit in investment ratings". The Times Of India.
  104. "BMRCL defers issue of bonds citing market volatility". The Hindu. Chennai, India. 4 August 2013.
  105. "Admin approval for Namma Metro Phase 2 – South India – Karnataka – ibnlive". Ibnlive.in.com. Retrieved 6 March 2012.
  106. 1 2 3 Lalitha, S. (6 February 2017). "European Bank's Rs 3.7k crore fillip for Metro Phase-II". The New Indian Express. Retrieved 10 February 2017.
  107. Bangalore, DHNS : (17 October 2012). "Centre's nod awaited to extend Metro to Bengaluru Intl Airport". Deccan Herald. Retrieved 4 March 2013.
  108. "Bangalore Metro gets $250 mn ADB loan". Business Standard. 28 March 2012. Retrieved 25 July 2012.
  109. "Funding for Phase II". The Hindu. Retrieved 13 January 2017.
  110. "Rs 3,700-cr loan likely for Nagawara-Gottigere line". Deccan Herald. Retrieved 11 May 2017.
  111. Briginshaw, David. "India seeks EIB loan for Bangalore metro Line 4". International Rail Journal. Retrieved 2 March 2017.
  112. "Biocon, Infy to Adopt Two Metro Stations – ETtech". ETtech.com. Retrieved 18 May 2017.
  113. "13.25 lakh rode the Metro – The Times of India". The Times of India. 25 November 2011.
  114. "Namma Metro gains momentum – southindia – Bangalore – ibnlive". Ibnlive.in.com. Retrieved 3 January 2012.
  115. "Joyrides in Bangalore Metro are over – Bangalore – DNA". Daily News and Analysis. Retrieved 25 July 2012.
  116. 1 2 "Bangalore Metro posts Rs 41 lakh profit in first year – Bangalore – DNA". Daily News and Analysis. 18 October 2012. Retrieved 18 October 2012.
  117. Reporter, Staff (20 October 2016). "Metro to complete 5 years of operations". The Hindu. Retrieved 2 November 2016.
  118. "BEML to supply coaches for Bangalore Metro". The Hindu. Chennai, India. 10 February 2009. Retrieved 19 June 2017.
  119. "Railway Gazette: Bangalore metro trial". Retrieved 13 February 2011.
  120. Bengaluru, DHNS (2017-02-04). "Metro Phase 1 set to meet April deadline". Deccanherald.com. Retrieved 2017-02-11.
  121. "BEML wins Rs 1,421-cr contract from Bangalore Metro". The Hindu Business Line. 27 March 2017. Retrieved 28 March 2017.
  122. Editorial, Reuters. "BRIEF-BEML Ltd gets 14.21 bln rupees order from Bangalore Metro Rail Corp". Reuters India. Retrieved 28 March 2017.
  123. "At Rs 1,421 cr, BEML to supply 150 Metro cars". Deccan Herald. Retrieved 28 March 2017.
  124. "Metro trains to get three more coaches from June 2018". The Hindu. 6 June 2017. Retrieved 19 June 2017.
  125. 1 2 3 "NAMMA-METRO-IS-A-GEEK-TRAIN". The Times of India. 16 October 2011. Retrieved 21 October 2011.
  126. "Bangalore Metro goes wi-fi". Deccan Chronicle. 2013-08-01. Retrieved 2013-09-28.
  127. "ABB wins $115 million order to power Bangalore metro". The ABB Group. Retrieved 1 January 2010.
  128. 1 2 3 4 5 "BMRC hoping to finish work on Sampige Road-Puttenahalli line ahead of April 2017 deadline". The Times of India. Retrieved 5 November 2016.
  129. "Alstom will provide train control and signalling system for the new Bangalore metro network in India". Alstom. Retrieved 2 October 2011.
  130. "Alstom-led consortium in pact with Bangalore Metro". Business Standard. 18 September 2009. Retrieved 3 May 2010.
  131. "2,240 workers worked day in, day out to build India's largest metro station". Bangalore Mirror. Retrieved 27 April 2016.
  132. "At Metro, wanna pee? Pay Rs 3 – Bangalore – DNA". Dnaindia.com. Retrieved 2013-09-28.
  133. Reporter, Staff. "Metro stations to get more ATMs". The Hindu. Retrieved 21 February 2017.
  134. "Uber ties up with Bangalore Metro – Mumbai Mirror -". Mumbai Mirror. Retrieved 22 February 2017.
  135. "Bengaluru: Cab aggregator booking kiosks at Metro stations soon". Deccan Chronicle. 23 February 2017. Retrieved 23 February 2017.
  136. KJ, Shashidhar (23 February 2017). "Ola will set up kiosks for cab booking at Bangalore metro stations". MediaNama. Retrieved 23 February 2017.
  137. "Metro pillars a vertical garden – Bangalore Mirror -". Bangalore Mirror. Retrieved 10 March 2017.
  138. Special Correspondent. "BMRCL launches road-cum-rail vehicle for rescue operations". The Hindu. Retrieved 29 August 2015.
  139. "'We've taken steps to ensure public safety'". The Times of India. 28 October 2011.
  140. G. Ananthakrishnan (14 January 2013). "Linking modes of commute". The Hindu. Chennai, India. Retrieved 4 March 2013.
  141. "Sidewalks under Metro corridors to get a facelift – Times of India". The Times of India. Retrieved 10 February 2017.
  142. "Footpaths along 40-km Metro corridors to get facelift". Deccan Herald. Retrieved 10 February 2017.
  143. "'Liquid' cash from viaduct". The Hindu. Chennai, India. 15 December 2011.
  144. "Metro will extend rainwater harvesting project to Phase 2". Deccan Herald. Retrieved 24 March 2017.
  145. 1 2 Francis, Merlin (2 April 2012). "Namma Metro gets waterwise". DNA India. Bangalore, India. Retrieved 24 June 2012.
  146. "Metro medians turn garbage dumps". The Times Of India. 6 August 2012.
  147. "Lakes to come alive along Metro path". The Times of India. 4 November 2012. Retrieved 4 March 2013.
  148. "BMRCL plans to rejuvenate lakes, starting with Kengeri – Bangalore – DNA". Daily News and Analysis. 4 November 2012. Retrieved 4 March 2013.
  149. "Bengaluru Metro System Adopts NXP's MIFARE Technology". MarketWatch. 23 January 2012. Archived from the original on 25 January 2012. Retrieved 13 January 2017.
  150. "Bangalore Metro: Recharge and ride on". The Times of India. 1 January 1970. Retrieved 21 October 2011.
  151. "Cities / Bangalore : 20,000 smart cards sold for metro ride". The Hindu. Chennai, India. 17 October 2011. Retrieved 21 October 2011.
  152. "20,000 smart cards sold for metro ride". The Hindu. 17 October 2011. Retrieved 8 September 2014.
  153. ReporterBengaluru, Staff. "Namma Metro withdraws Sanchar tickets". The Hindu. Retrieved 2 March 2017.
  154. "BMRC withdraws cheaper trip tickets, commuters fume – Times of India". The Times of India. Retrieved 2 March 2017.
  155. Bangalore, DHNS : (3 December 2012). "Automatic ticket vending at Metro stations". Deccan Herald. Retrieved 4 March 2013.
  156. "Yeshwantpur Metro link work picks up pace". The Times of India. 5 December 2012. Retrieved 4 March 2013.
  157. "BMRCL launches online system to top up Metro cards". Deccan Herald. Retrieved 18 November 2016.
  158. "Namma metro may up frequency". The New Indian Express. Retrieved 6 June 2016.
  159. "Metro Phase 1 set to meet April deadline". Deccan Herald. Retrieved 10 February 2017.
  160. "Metro speed upped on Purple line". Deccan Herald. Retrieved 13 January 2017.
  161. Bangalore, DHNS: (22 December 2012). "Bar timings relaxed for revellers". Deccan Herald. Retrieved 6 June 2013.
  162. "Metro to run till midnight today, tomorrow". The Times of India. 24 December 2012. Retrieved 6 June 2013.
  163. 1 2 "Bangalore Metro Rail set to make profit". New Indian Express. Retrieved 29 December 2017.
  164. Chethan Kumar, Bangalore, DHNS: (22 May 2013). "RDSO in no hurry to allow Metro to up speed". Deccan Herald. Retrieved 6 June 2013.
  165. "Namma Metro security cover to soon get a boost". The New Indian Express. Retrieved 18 March 2017.
  166. "Mock drill at Metro stations takes passengers aback". Deccan Herald. Retrieved 26 March 2017.
  167. "Metro gets luggage scanners". Deccan Herald.
  168. Rohith B R, Bangalore, DHNS : (18 October 2012). "Commuters' brush with etiquette on Namma Metro". Deccan Herald. Retrieved 6 June 2013.
  169. "No entry for drunk commuters in Metro". Deccan Chronicle. 25 December 2012. Retrieved 6 June 2013.
  170. "Not fine to spit in Metro". The Times of India. 11 October 2012. Retrieved 6 June 2013.
  171. "New app for Namma Metro once Phase 1 gets fully operational". Deccan Herald. Retrieved 29 August 2015.
  172. Bengaluru: DHNS (2016-11-05). "Metro trial run between National College, Puttenahalli in 3 weeks". Deccanherald.com. Retrieved 2017-02-11.
  173. "'Unofficial' apps of govt transport corpns flood digital platform". Deccan Herald. Retrieved 2 November 2016.
  174. 1 2 "Shooting in the metro tunnel". Bangalore Mirror. Retrieved 11 December 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.