Delhi Metro

Metro map

Delhi Metro
Overview
Owner Delhi Metro Rail Corporation Limited (DMRCL)
Locale NCR, India
Transit type Rapid transit / Metro
Number of lines 8 color coded lines
Number of stations 214[Nb 1]
Daily ridership average 2.76 million[2]
Annual ridership 1 billion (FY 2016–17)[3]
Chief executive Durga Shanker Mishra, IAS Union Housing and Urban Affairs Secretary and ex-officio Chairman, DMRC
Mangu Singh, IRSE, Managing Director, DMRC[4]
Headquarters Metro Bhawan, Barakhamba Road, New Delhi – 110001.
Website Delhi Metro Rail Corporation Ltd. (in English)
Operation
Began operation 24 December 2002 (24 December 2002)
Operator(s) Delhi Metro Rail Corporation Ltd (DMRC)
Number of vehicles 270 Trains[5]
Train length 6/8 coaches [5]
Technical
System length 296 km (184 mi)[5]
Track gauge 1,676 mm (5 ft 6 in) (Indian gauge; phase 1)
1,435 mm (4 ft 8 12 in) (Standard gauge)
Electrification Single phase 25 kV, 50 Hz AC through overhead catenary
Delhi Metro Rail Network (2018)

The Delhi Metro is a metro system serving Delhi and its satellite cities of Faridabad, Gurgaon, Bahadurgarh, Noida and Ghaziabad in the National Capital Region of India. Delhi Metro Rail Corporation Limited (DMRC), a state-owned company with equal equity participation from the Government of India and the Government of Delhi, built and operates the Delhi Metro. It is the second oldest metro in India after the Kolkata Metro.

The Delhi Metro is the largest and busiest metro in India by a considerable margin,[6] and the world's 9th longest metro system in length and 16th largest in ridership. A member of CoMET,[7] the network consists of eight colour-coded regular lines, with a total length of 296.1 kilometres (184.0 mi) serving 214 stations (including 6 on Airport Express line and interchange stations).[5][8] The system has a mix of underground, at-grade, and elevated stations using both broad-gauge and standard-gauge. The power output is supplied by 25-kilovolt, 50-hertz alternating current through overhead catenary. The trains are usually of six and eight coaches length.[5] DMRC operates over 2,700 trips daily, with first trains starting at around 05:00 and last at 23:30.[9] In the financial year 2016–17, the Delhi Metro had an average daily ridership of 2.76 million passengers and served 100 crore (1.0 billion) riders in total during the year.[3]

The Delhi Metro Rail Corporation was certified by the United Nations in 2011 as the first metro rail and rail-based system in the world to get "carbon credits for reducing greenhouse gas emissions" and helping in reducing pollution levels in the city by 630,000 tonnes every year.[5]

Planning for the metro started in 1984 when the Delhi Development Authority and the Urban Arts Commission came up with a proposal for developing a multi-modal transport system for the city. Delhi Metro Rail Corporation (DMRC) was incorporated in May 1995, construction started in 1998, and the first section, on the Red Line, opened in 2002.[10] The development of the network was divided into phases, Phase I containing 3 lines was completed by 2006, and Phase II in 2011. Phase III is scheduled to be mostly complete by 2018 (originally planned for 2016).

The Rapid Metro Gurgaon which opened in 2013, whilst linked to Delhi Metro by the Yellow Line is a separate metro system (with a different owner/operator from the Delhi Metro), although tokens from the Delhi Metro can be used on its network.

History

Evolution of the Delhi Metro 2002 (opening) to 2017

Background

The concept of a mass rapid transit for New Delhi first emerged from a traffic and travel characteristics study which was carried out in the city in 1969.[11] Over the next several years, many official committees by a variety of Government departments were commissioned to examine issues related to technology, route alignment, and Governmental jurisdiction.[12] In 1984, the Urban Arts Commission came up with a proposal for developing a multi-modal transport system, which would consist of constructing three underground mass rapid transit corridors as well augmenting the city's existing suburban railway and road transport networks.[13]

While extensive technical studies and the raising of finance for the project were in progress, the city expanded significantly resulting in a twofold rise in population and a fivefold rise in the number of vehicles between 1981 and 1998.[13] Consequently, traffic congestion and pollution soared, as an increasing number of commuters took to private vehicles with the existing bus system unable to bear the load.[11] An attempt at privatising the bus transport system in 1992 merely compounded the problem, with inexperienced operators plying poorly maintained, noisy and polluting buses on lengthy routes, resulting in long waiting times, unreliable service, extreme overcrowding, unqualified drivers, speeding and reckless driving.[14] To rectify the situation, the Government of India and the Government of Delhi jointly set up a company called the Delhi Metro Rail Corporation (DMRC) on 3 May 1995, with E. Sreedharan as the managing director.[15] Dr. E. Sreedharan handed over the charge as Managing Director of DMRC to Mangu Singh on 31 December 2011.

Initial Construction

Physical construction work on the Delhi Metro started on 1 October 1998.[16] After the previous problems experienced by the Kolkata Metro, which was badly delayed and 12 times over budget due to "political meddling, technical problems and bureaucratic delays", DMRC is a special-purpose organisation vested with great autonomy and powers to execute this gigantic project involving many technical complexities, under a difficult urban environment and within a very limited time frame. DMRC was given full powers to hire people, decide on tenders and control funds.[17] The DMRC then hired the Hong Kong MTRC as a technical consultant on rapid transit operation and construction techniques.[18] As a result, construction proceeded smoothly, except for one major disagreement in 2000, where the Ministry of Railways forced the system to use broad gauge despite the DMRC's preference for standard gauge.[19]

The first line of the Delhi Metro, the Red Line, was inaugurated by Atal Bihari Vajpayee, the Prime Minister of India, on 24 December 2002.[20] The Delhi Metro became the second underground rapid transit system in India, after the Kolkata Metro, when the Vishwa VidyalayaKashmere Gate section of the Yellow Line opened on 20 December 2004.[21] The first phase of the project was eventually completed in 2006,[22][23] on budget and almost three years ahead of schedule, an achievement described by Business Week as "nothing short of a miracle".[24]

Construction accidents

On 19 October 2008, a launching gantry and a part of the overhead Blue Line extension under construction in Laxmi Nagar, East Delhi, collapsed and fell on passing vehicles underneath. Workers were using a crane to lift a 400-tonne concrete span of the bridge when the gantry collapsed along with a 34-metre-long (112 ft) span of the bridge on top of a Blueline bus, killing the driver and a labourer.[25]

On 12 July 2009, a section of a bridge collapsed while it was being erected at Zamrudpur, near East of Kailash, on the Central Secretariat – Badarpur corridor. Six people died and 15 were injured.[26] The following day, on 13 July 2009, a crane that was removing the debris collapsed, and with a bowling pin effect collapsed two other nearby cranes, injuring six.[27] On 22 July 2009, a worker at Ashok Park Metro station was killed when a steel beam fell on him.[28] Over a hundred people, including 93 workers, have died since work on the metro began in 1998.[29]

On 23 April 2018, Five people were injured when an iron girder fell off the elevated section of a Metro rail structure being constructed at the Mohan Nagar intersection in Ghaziabad. A car, an auto rickshaw and a motorbike were also damaged in the accident.[30]

Network

The Delhi Metro is being built in phases. Phase I consisted of 58 stations and 65.0 km (40.4 mi) of route length,[31] of which 13.0 km (8.1 mi) is underground and 52.1 km (32.4 mi) surface or elevated. The inauguration of the DwarkaBarakhamba Road corridor of the Blue Line marked the completion of Phase I in October 2006.[32] Phase II of the network consists of 124.6 km (77.4 mi) of route length and 85 stations,[31] and is fully completed, with the first section opened in June 2008 and the last line opened in August 2011.[33] Phase-III has 28 underground stations, 2 new lines and 11 route extensions, totalling 167.27 km (103.94 mi), with a cost of 350 billion (US$4.9 billion) and having a planned completion date of December 2018. Phase IV (113.2 km or 70.3 mi) is planned to be completed by 2022.

Current routes

Delhi Metro Network Map

Delhi Metro Current Network map 2018
Delhi Metro
Present Network
Line No. Line Name First operational[34] Last extension[34] Stations[35] Length
(km)[35]
Terminals Rolling stock Track gauge
(mm)
Power Average Frequency

(Minutes)

1 Red Line 2002-12-24 2008-06-03 2125.09Dilshad GardenRithala31 Trains 1676 25 kV OHE 5
2 Yellow Line 2004-12-20 2015-11-10 3749.31Samaypur BadliHUDA City Centre 60 Trains 1676 25 kV OHE 5
3 Blue Line 2005-12-31 2010-10-30 4449.84Noida City CentreDwarka Sector 2170 Trains 1676 25 kV OHE 5
4 2010-01-07 2011-07-14 88.74Yamuna BankVaishali 1676 25 kV OHE 5
5 Green Line 2010-04-03 2018-06-2421 26.32InderlokBahadurgarh City Park20 Trains 1435 25 kV OHE 5
2011-08-27 23.32Ashok Park MainKirti Nagar 1435 25 kV OHE 5
6 Violet Line 2010-10-03 2017-05-28 3243.40Kashmere GateEscorts Mujesar44 Trains 1435 25 kV OHE 5
Orange Line 2011-02-23 622.70New DelhiDwarka Sector 2110 Trains 1435 25 kV OHE 10
8 Magenta Line 2017-12-25 2018-05-29 2537.46Botanical gardenJanakpuri West26 Trains 1435 25 kV OHE 5
7 Pink Line 2018-03-14 2018-08-06 1829.66Majlis ParkLajpat Nagar23 Trains 1435 25 kV OHE 5
214[5]295.84284 Trains

Phase I and Phase II

Phase I and Phase II routes and stations opened progressively from 25 December 2002 and 3 June 2008 respectively, and become completely operational on 11 November 2006 and 27 August 2011 respectively.

  • Phase I:
    A total of 65 kilometres (40 mi) long network with 58 stations and the following 3 routes (initial parts of Red, Yellow and Blue lines) were built within the limits of Delhi state, stations progressively started to open from 25 December 2002 to 11 November 2006.
    • Red Line, Line No.1:
      Shahdara-Tri Nagar-Rithala, 22.06 kilometres (13.71 mi) route with 18 stations progressively started to open from 25 December 2002 to 1 April 2004.
    • Yellow Line, Line No.2:
      Vishwa Vidyalaya-Central Secretariat, 10.84 kilometres (6.74 mi) route with 10 stations progressively started to open from 20 December 2004 to 3 July 2005.
    • Blue Line, Line No.3:
      Indraprastha-Barakhamba Road-Dwarka Sub City, 32.10 kilometres (19.95 mi) route with 30 stations progressively started to open from December 2005 to 11 November 2006.
  • Phase II:
    A total of 124.63 kilometres (77.44 mi) long network with 85 stations and the following 10 new routes and extensions was built, out of which seven routes are extension spurs of the Phase I network, three were new colour-coded lines and three routes connect to other cities (Yellow Line to Gurgaon, Blue Line to Noida and Blue Line to Ghaziabad) of the national capital region, outside the physical limits of Delhi state, in the states of Haryana and Uttar Pradesh. At the end of Phases I and II, the cumulative total length of the network became 189.63 km (117.83 mi) with 143 stations progressively becoming operational from 3 June 2008 to 27 August 2011.[5][36]
    • Red Line, Shahdara – Dilshad Garden:
      3.09 kilometres (1.92 mi) route with 3 stations, an extension of Phase I, Line 1 became operational on 4 June 2008.
    • Yellow Line, Vishwavidyalaya – Jahangir Puri:
      6.36 kilometres (3.95 mi) route with 5 stations, an extension of Phase I, Line 2 became operational on 4 February 2009.
    • Yellow Line, Central Secretariat – HUDA City Centre:
      27.45 kilometres (17.06 mi) route with 19 stations, an extension of Phase I, Line 2 progressively became operational from 21 June 2010 to 3 September 2010, connects to Gurgaon in Haryana state with an interchange with Rapid Metro Gurgaon at Sikandarpur.
    • Blue Line, Indraprastha – Noida Sector 32 City Centre:
      15.07 kilometres (9.36 mi) route with 11 stations, an extension of Phase I, Line 3 progressively became operational from 10 May 2009 to 13 November 2009, connects to Noida in Gautam Buddh Nagar district of Uttar Pradesh state.
    • Blue Line, Yamuna Bank – Anand Vihar ISBT:
      6.17 kilometres (3.83 mi) route with 5 stations became operational on 27 January 2010.
    • Blue Line, Anand Vihar – KB Vaishali:
      2.57 kilometres (1.60 mi) route with 2 stations became operational on 27 January 2010, connects to Ghaziabad district of Uttar Pradesh state.
    • Blue Line, Dwarka Sector 9 to Dwarka Sector 21:
      2.76 kilometres (1.71 mi) route with 2 stations, an extension of Phase I, Line 3 became operational on 30 October 2010.
    • Orange Line, Airport Express Line:
      22.70 kilometres (14.11 mi) route with 6 stations became operational on 23 February 2011.
    • Violet Line, Kashmiri Gate – Badarpur:
      20.04 kilometres (12.45 mi) route with 16 stations progressively became operational from 3 October 2010 to 14 January 2011, its Phase III extensions to Mandi House and Faridabad became operational on 28 June 2014 and 6 September 2015 respectively.
    • Green Line, Inderlok – Kirti Nagar – Mundka:
      18.46 kilometres (11.47 mi) route with 16 stations became operational on 27 August 2011.
Red Line
Red Line

The Red Line was the first line of the Metro to be opened and connects Rithala in the west to Dilshad Garden in the east, covering a distance of 25.09 kilometres (15.59 mi).[37] It is partly elevated and partly at grade and crosses the Yamuna River between Kashmere Gate and Shastri Park stations.[38] The inauguration of the first stretch between Shahdara and Tis Hazari on 24 December 2002 caused the ticketing system to collapse due to the line being crowded to four times its capacity by citizens eager to have a ride.[39][40] Subsequent sections were inaugurated from Tis Hazari – Trinagar (later renamed Inderlok) on 4 October 2003,[41] Inderlok – Rithala on 31 March 2004, and Shahdara – Dilshad Garden on 4 June 2008.[42] The red line has two interchange stations, the first Kashmere Gate with the Yellow Line and Violet Line and the second Inderlok with the Green Line. Beginning 24 November 2013, a total of six-coach trains were eventually commissioned on the Red Line.[43]

Yellow Line
Yellow Line
Inside a Delhi Metro on the yellow line

The Yellow Line was the second line of the Metro and was the first underground line to be opened on the Delhi Metro.[44] It runs for 49 kilometres (30 mi) from north to south and connects Samaypur Badli with HUDA City Centre in Gurgaon. The northern and southern parts of the line are elevated, while the central section which passes through some of the most congested parts of Delhi is underground. The first section between Vishwa Vidyalaya and Kashmere Gate opened on 20 December 2004, and the subsequent sections of Kashmere Gate Central Secretariat opened on 3 July 2005, and Vishwa Vidyalaya Jahangirpuri on 4 February 2009.[42] This line also possesses the country's deepest Metro station[45] at Chawri Bazaar, situated 25 metres (82 ft) below ground level.[46]

On 21 June 2010, an additional stretch from Qutub Minar to HUDA City Centre was opened, initially operating separately from the mainline. However, Chhatarpur station on this line opened on 26 August 2010. Due to delays in acquiring the land for constructing the station, it was constructed using prefabricated structures in a record time of nine months and is the only station in the Delhi Metro network to be made completely of steel.[47][48] The connecting link between Central Secretariat and Qutub Minar opened on 3 September 2010.[49]

On 10 November 2015, the line was further extended between Jahangirpuri and Samaypur Badli in Outer Delhi.[50] Interchanges are available with the Red Line and Kashmere Gate ISBT at Kashmere Gate station, Blue Line at Rajiv Chowk Station, Violet Line at Central Secretariat, Airport Express (Orange) Line at New Delhi, Rapid Metro Gurgaon at Sikandarpur and with the Indian Railways network at Chandni Chowk and New Delhi.[51][52]

The yellow line is the first line of Delhi Metro which has phased out all four coach trains with six and eight coach configuration. The Metro Museum at Patel Chowk Metro station is a collection of display panels, historical photographs and exhibits, tracing the genesis of the Delhi Metro. The museum was opened on 1 January 2009.[45]

Blue Line
Blue Line

The Blue Line was the third line of the Metro to be opened and the first to connect areas outside Delhi.[53] Mainly elevated and partly underground,[54] it connects Dwarka Sub City in the west with the satellite city of Noida in the east, covering a distance of 47.4 kilometres (29.5 mi).[53] The first section of this line between Dwarka and Barakhamba Road was inaugurated on 31 December 2005, and subsequent sections opened between Dwarka Dwarka Sector 9 on 1 April 2006, Barakhamba Road Indraprastha on 11 November 2006, Indraprastha Yamuna Bank on 10 May 2009, Yamuna Bank Noida City Centre on 12 November 2009, and Dwarka Sector 9 Dwarka Sector 21 on 30 October 2010.[42] This line crosses the Yamuna River between Indraprastha and Yamuna Bank stations,[38] and has India's second extradosed bridge across the Northern Railways mainlines near Pragati Maidan.[55]

A branch of the Blue line, inaugurated on 8 January 2010, takes off from Yamuna Bank station and runs for 6.25 kilometres (3.88 mi) up to Anand Vihar in east Delhi.[56] It was further extended up to Vaishali which was opened to the public on 14 July 2011.[57] A small stretch of 2.76 kilometres (1.71 mi) from Dwarka Sector 9 to Dwarka Sector 21 was inaugurated on 30 October 2010.[58] Interchanges are available with the Yellow Line at Rajiv Chowk station,[54] Green line at Kirti Nagar, Violet line at Mandi House, Airport Express (Orange) line at Dwarka Sector 21 and with the Indian Railways network and Interstate Bus Station (ISBT) at Anand Vihar station, which connects with Anand Vihar Railway Terminal and Anand Vihar ISBT.[59]

Green Line
Green Line

Opened in 2010, Green Line (Line 5) is the fifth line of the Delhi Metro network and the first line on standard gauge, as opposed to previous broad gauge lines. It runs between Inderlok (station on the Red Line) and Bahadurgarh City Park with a branch line connecting the line's Ashok Park Main station with Kirti Nagar station on the Blue Line. The completely elevated line, built as part of the Phase-II of Delhi Metro runs mostly along the busy NH 10 route in West Delhi. The line consists of 23 stations including an interchange station covering a total length of 29.64 km (18.42 mi). This line also has the country's first standard-gauge maintenance depot at Mundka.[60]

The line was opened in two stages, with the 15.1 km (9.4 mi) Inderlok – Mundka section opening on 3 April 2010 and the 3.5 km (2.2 mi) Kirti Nagar – Ashok Park Main branch line on 27 August 2011. On 6 August 2012, in a step that will improve commuting in National Capital Region, the Union Government approved an extension of Delhi Metro from Mundka to Bahadurgarh in Haryana. The 11.18 km (6.95 mi) metro stretch have seven stations at Mundka Industrial Area, Ghevra, Tikri Kalan, Tikri Border, Modern Industrial Estate, Bahadurgarh Bus Stand and City Park between Mundka and Bahadurgarh. This stretch was opened on 24 June 2018.

Violet Line
Violet Line

The Violet Line is the sixth line of the Metro to be opened, and the second standard-gauge corridor after the Green Line. The 40-kilometre-long (25 mi) line connects Escorts Mujesar in Faridabad to Kashmere Gate in New Delhi, with 22.8 km (14.2 mi) being overhead and the rest underground. The first section between Central Secretariat and Sarita Vihar was inaugurated on 3 October 2010, just hours before the inaugural ceremony of the 2010 Commonwealth Games, and connects the Jawaharlal Nehru Stadium, which was the venue for the opening and closing ceremonies of the event.[61] Completed in just 41 months, it includes a 100-metre-long (330 ft) bridge over the Indian Railways mainlines and a 167.5-metre-long (550 ft) cable-stayed bridge across an operational road flyover and connects several hospitals, tourist attractions, and a major industrial estate along its route. Services are provided at intervals of 5 min.[61][62] An interchange with the Yellow Line is available at Central Secretariat through an integrated concourse. On 14 January 2011, the remaining portion from Sarita Vihar to Badarpur was opened for commercial service, adding three new stations to the network and marking the completion of the line.[63]

The section between Mandi House and Central Secretariat, was opened on 26 June 2014. After that, a 971-metre section between ITO and Mandi House was opened on 8 June 2015. A 14 km (8.7 mi) extension southwards till Escorts Mujesar in Faridabad was inaugurated by Prime Minister Narendra Modi on 6 September 2015.[64] All the nine Metro stations of the Badarpur – Escorts Mujesar (Faridabad) section of Delhi Metro's Phase 3, have been awarded the highest possible rating (platinum) for adherence to green building norms, by the Indian Green Building Council (IGBC), which has devised a rating mechanism for Metro stations and buildings on a scale of platinum, gold, silver etc. for following the green building specifications. The awards for these stations were given to DMRC's Managing Director, Dr. Mangu Singh by Dr. P C Jain, Chairperson, IGBC in the presence of DMRC's directors and senior officials on 10 September 2015.[65]

Currently, the Faridabad corridor of Delhi Metro Violet Line is the longest metro corridor outside of Delhi, consisting of 9 stations and the total length of corridor being 14 km (8.7 mi).[66] On 28 May 2017, the ITOKashmere Gate corridor of the Delhi Metro was formally flagged off for passenger services by the Union Minister of Urban Development, M. Venkaiah Naidu and the Chief Minister of Delhi, Arvind Kejriwal. This section which runs underground is popularly known as the Heritage Line.[67]

Orange Line: Airport Express
The interior of a Delhi Metro Airport Express train

The Airport Express line runs for 22.7 km (14.1 mi) from New Delhi Railway Station to Dwarka Sector 21, linking the Indira Gandhi International Airport. The line was operated by Delhi Airport Metro Express Pvt. Limited (DAMEL), a subsidiary of Reliance Infrastructure, the concessionaire of the line till 30 June 2013 and is now being operated by DMRC.[68] The line was constructed at a cost of

57 billion (US$790 million), of which Reliance Infrastructure invested 28.85 billion (US$400 million) and will pay fees on a revenue-share model.[69] The line has six stations (Dhaula Kuan and Delhi Aerocity became operational on 15 August 2011), with some featuring check-in facilities, parking, and eateries.[70] Rolling stock consists of six-coach trains operating at intervals of ten minutes and having a maximum speed of 135 km/h (84 mph).[70]

Originally scheduled to open before the 2010 Commonwealth Games, the line failed to obtain the mandatory safety clearance and was opened on 24 February 2011, after a delay of around 5 months. After 16 months of commencement of operations, the line was shut down for repairs of the viaducts on 8 July 2012.[71][72] The line reopened on 22 January 2013.[73] On 27 June 2013 Reliance Infrastructure Ltd intimated DMRC that they are unable to operate the line beyond 30 June 2013. Following this DMRC took over operations of Airport Express line from 1 July 2013 with an Operations and Maintenance team of 100 officials to handle the line.[74] In Jan 2015, DMRC reported that Airport Metro has recorded about 30 percent rise in its ridership following the fare reduction of up to 40 percent in July last year[75] On 14 September 2015 DMRC announced to reduce fares even further to improve the ridership of the line, the new fare structure will have maximum fare of ₹60 and minimum of ₹10 instead of ₹100 and ₹20 charged earlier, a reduction of about 40%.[76] DMRC has stated that this was done to reduce the crowding on Blue line, diverting some of the Dwarka-bound passengers to Airport Express Line, which is underutilised and faster compared to the Blue Line.

Phase III

Delhi Metro map with Phase I, phase II and phase III routes

Phase-I (Red, Yellow and Blue lines) and phase-II (Green, Violet and Orange lines) had focused on adding new radial lines to expand the network. To reduce the congestion and improve the connectivity, Phase-III includes 11 extensions to the existing lines as well as building two ring lines (Pink and Magenta lines). Phase-III has 28 underground stations, 2 new lines and 11 route extensions, totaling 167.27 km (103.94 mi), with a cost of 350 billion (US$4.9 billion).[77] Phase 3 contains 3 new Lines in Delhi Metro System, Pink Line running on Inner Ring Road (Line 7), Magenta Line running on Outer Ring Road (Line 8) & Gray Line connecting Dwarka and Najafgarh (Line 09).

Work on Phase III started in 2011,[78][79] with 2016 being the planned deadline,[80] more than 20 tunnel boring machines were used simultaneously to expedite the work,[81] however, the actual work is planned to be completed by end of 2018, subject to availability of land in certain pockets.[82]

Kalkaji Mandir to Botanical Garden section of Magenta Line was inaugurated by Prime Minister Narendra Modi on Christmas 2017, making it the first driverless line of Delhi Metro.[83]

The expected daily ridership of the whole network of all phases, after the completion of Phase-III, is 4 million passengers. The communication-based train control (CBTC) is being used in Phase-III trains which enables trains to run at a short headway of 90 seconds.[84] Keeping this in mind and other constraints, DMRC changed its decision to build 9-car-long stations for new lines and instead opting for shorter stations which can accommodate 6-car trains.

Phase-III line completion timelines are given below:

Delhi Metro
Phase 3 Planned Network
Line No. Line Name Stations Length
(km)
Terminals No. of Interchanges
Planned
Expected Date of Completion/ Date of Opening[80]
2 Yellow Line3 4.37 Jahangirpuri Samaypur Badli 0 Completed (10 November 2015)
1 1.057 Samaypur Badli Siras Pur 0 March 2019[85]
6 Violet Line 79.37Central SecretariatKashmere Gate3Completed (28 May 2017)
913.875 BadarpurEscorts Mujesar0Completed (6 September 2015)
23.205Escorts Mujesar metro stationBallabhgarh0December 2018
9 Grey Line34.295DwarkaNajafgarh1August 2019
3 Blue Line66.675Noida City CentreNoida Electronic City1November 2018
5 Green Line711.182MundkaBahadurgarh City Park0Completed (24 June 2018)
7 Pink Line1221.56Majlis ParkDurgabai Deshmukh South Campus5Completed (14 March 2018)
68.1Durgabai Deshmukh South CampusLajpat Nagar2Completed (6 August 2018)
4 9.65Lajpat NagarMayur Vihar I1December 2018
1 1.5Mayur Vihar ITrilokpuri Sanjay Lake0August 2019
15 17.8Trilokpuri Sanjay LakeShiv Vihar3November 2018
8 Magenta Line912.64Kalkaji MandirBotanical Garden2Completed (25 December 2017)
1625.26Janakpuri WestKalkaji Mandir2Completed (29 May 2018)
1 Red Line89.41Dilshad GardenNew Bus Adda0November 2018
10 Orange Line11.878Dwarka Sector 21ECC Centre02020[86][87]
- Aqua Line2229.7Noida Sector 52Depot station1October 2018
133192.718
Magenta Line
Magenta line trains are the first driverless trains in the Delhi Metro network

The Magenta Line is the first new line of the Third Phase of the Delhi Metro that was partially opened on 25 December 2017 between Botanical Garden and Kalkaji Mandir. The entire length of the line was inaugurated on 28 May 2018.

It consists of 25 metro stations from Janakpuri West to Botanical Garden. The Magenta Line provide direct connectivity to Terminal 1D of Indira Gandhi International Airport. The Hauz Khas station on this line and the current Yellow Line is the deepest Metro station at a depth of 29 metres, surpassing the record set by Chawri Bazaar station on the Yellow Line, at a depth of 22 metres. The Magenta line has interchanges with the Yellow, Blue, and the Violet lines of the Delhi Metro network.

Pink Line

The Pink Line is the second new line of the Third Phase of the Delhi Metro that was partially opened on 14 March 2018, with a further extension opening on 6 August 2018. Currently, the line is opened between Majlis Park to Lajpat Nagar.

It consists of 38 metro stations from Majlis Park to Shiv Vihar, both in North Delhi. Upon completion, the Pink Line with a length of 58.59 kilometres (36.41 mi), will be the longest line in Delhi Metro, breaking the record set by the operational Blue Line. It will be mostly elevated and will cover Delhi in an almost 'U' shaped pattern. The Pink Line is also known as the Ring Road Line, as the entire line passes alongside the busy Ring Road in Delhi, that witnesses massive traffic jams everyday.

The Pink line has planned interchanges with most of the operational lines of the network such as the Yellow, Red, Blue, Orange Line and Violet lines, as well as with Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways) and the ISBT's at Anand Vihar and Sarai Kale Khan. The Pink Line has the highest point of Delhi Metro at Dhaula Kuan with a height of 23.6 metres, passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line.[88]

Planned Expansion

Delhi Metro was planned to be built in phases spread over around 20 years as with each phase having a target of five years and end of one phase marking the beginning of another. Phase I (65 km or 40 mi), Phase II (125 km or 78 mi) were completed in 2006 and 2011, respectively. Phase III lines are expected to be completed in 2018, a delay of 2 years from the originally planned timeline of 2016. Phase IV (with extensions to the existing Red, Green, Pink and Magenta lines as well the addition of a new Moss Green line) might commence in 2018 and will be completed by 2023, respectively.[78] A final 370 kilometres (230 mi) route length of 230 kilometres (140 mi) (Phase I & II) and 140 kilometres (87 mi) (Phase III) will be added at the completion of Phase I, II and III. Currently, the Phase IV plan approved by the Delhi Government is expected to add another 103 kilometres (64 mi) between 2018 and 2023. This makes the total length of the Delhi Metro at the end of Phase IV exceed 450 kilometres (280 mi).[89][82] Which does not include other independently operated systems in the National Capital Region such as the 29.7 kilometres (18.5 mi) long Aqua Line of the Noida-Greater Noida Metro[90] and the 11.7 kilometres (7.3 mi) of the Rapid Metro Gurgaon that connect to the Delhi Metro.[91]

Phase IV

Phase IV is still currently in the proposal phase was originally planned to start construction in 2016 and had a 2021 deadline.[92] However delays in approval have delayed the completion deadline to at least 2023.[82] In June 2016, the Detailed Project Report (DPR) for the Phase IV was approved. In January 2017, the Delhi Government approved the Phase IV plan. In July 2017, the Delhi cabinet granted the final approval to the INR 50,000 crore (~ US$6.7 billion) plan in July 2017 on a 50:50 equity basis with the Union Government. In June 2017, the Government of Haryana's cabinet approved the investment of INR 968.20 crore (US$150 million), as its share on the 80:20 equity ratio with the union Government, for the 4.86 kilometres (3.02 mi) extension of Delhi Metro from the existing Rithala metro station to Sonipat via Bawana with three elevated stations at Sector 5 of Narela in Delhi, on Delhi border at Kundli Industrial Area and Nathupur Industrial Area in Sonipat, which are planned to be built as part of Phase IV.[93] In 2018, a report by the Delhi Government’s finance department has criticized a number of corridors in Phase IV as not economically sustainable and lack sufficient ridership to justify the cost of construction. The department singled out the new Tughlakabad – Aerocity and Inderlok – Indraprastha Lines and the north extension of the Red Line to Narela and Sonipat as not economically viable.[94] In an attempt to contain delays, the DMRC is proposing to both the Union and Delhi Governments that construction should be prioritized to three out of the six corridors in Phase IV, Janakpuri West to R K Ashram, Maujpur to Mukundpur and Aerocity to Tughlakabad.[95] The other lines may be deferred.[96]

Approved Phase IV Lines
Delhi Metro
Phase 4 Planned Network
Line No. Line Stations Length (km) Terminals Opening Date Notes
1 Red Line 16 21.73 Rithala Narela 2023 [97][98][99]
3 4.86 Narela Nathupur [100][93]
7 Pink Line 6 12.54 Mukundpur Depot Maujpur [97][98][99]
8 Magenta Line 25 28.92 Janakpuri West RK Ashram
- New Lines (TBA) 10 12.58 Inderlok Indraprastha
15 20.20 Aerocity Tughlakabad
7 7.96 Lajpat Nagar Saket G Block

Proposed for inclusion into Phase IV

Phase V

Former Managing Director of DMRC, Dr. E Sreedharan stated that by the time Phase IV is completed, the city will need Phase V to cope with rising population and transport needs.[78] Planning work for Phase V has not started. However the following corridors, while not specifically tied or approved to any expansion phase have been suggested to be constructed in the past:

Depots

Delhi Metro currently has 15 operational depots.

Delhi Metro
Depots
Line No. Line Name Number of Depots Location Area Opening Date
1 Red Line 1 Shastri Park 25 December 2002
2 Yellow Line 3 Siraspur

Vishwa Vidyalaya - Khyber Pass

Sultanpur

2019

20 December 2004

21 June 2010

3 / 4 Blue Line 2 Yamuna Bank

Dwarka - Najafgarh

10 May 2009

21 December 2005

5 Green Line 2 Mundka

Modern Industrial Estate (MIE)

2 April 2010

24 June 2018

6 Violet Line 3 Sarita Vihar

Neelam Chowk Ajronda

3 October 2010

6 September 2015

7 Pink Line 2 Mukundpur Depot Station

Vinod Nagar

14 March 2018

September 2018

8 Magenta Line 2 Kalindi Kunj - Jasola Vihar Shaheen Bagh

Mangolpuri

25 December 2017

2022

9 Grey Line 1 Dwarka - Najafgarh 2019
10 Orange Line 1 Dwarka Sector 21 23 February 2011

Finances

Summary financials

Fiscal Year ending March Revenue Earnings before Interest Taxes Depreciation & Amortization (EBITDA) Profit Before Tax (PBT) Reference(s)
2007 543 crore (equivalent to 12 billion or US$160 million in 2017) 399 crore (equivalent to 858 crore or US$120 million in 2017) 24 crore (equivalent to 52 crore or US$7.2 million in 2017) [114]
2008 504 crore (equivalent to 10 billion or US$140 million in 2017) 300 crore (equivalent to 595 crore or US$83 million in 2017) 26 crore (equivalent to 52 crore or US$7.2 million in 2017) [115]
2009 724 crore (equivalent to 13 billion or US$180 million in 2017) 473 crore (equivalent to 847 crore or US$120 million in 2017) 90 crore (equivalent to 144 crore or US$20 million in 2017) [116]
2010 738 crore (equivalent to 12 billion or US$160 million in 2017) 356 crore (equivalent to 569 crore or US$79 million in 2017) -90 crore (equivalent to 132 crore or US$18 million in 2017) [117]
2011 1,608 crore (equivalent to 24 billion or US$330 million in 2017) 750 crore (equivalent to 11 billion or US$150 million in 2017) -127 crore (equivalent to 186 crore or US$26 million in 2017) [118]
2012 2,248 crore (equivalent to 30 billion or US$420 million in 2017) 933 crore (equivalent to 13 billion or US$170 million in 2017) -68 crore (equivalent to 91 crore or US$13 million in 2017) [119]
2013 2,687 crore (equivalent to 33 billion or US$450 million in 2017) 1,028 crore (equivalent to 12 billion or US$170 million in 2017) -79 crore (equivalent to 96 crore or US$13 million in 2017) [120]
2014 3,198 crore (equivalent to 36 billion or US$510 million in 2017) 1,062 crore (equivalent to 12 billion or US$170 million in 2017) -60 crore (equivalent to 68 crore or US$9.5 million in 2017) [121]
2015 3,571 crore (equivalent to 38 billion or US$530 million in 2017) 1,240 crore (equivalent to 13 billion or US$190 million in 2017) -275 crore (equivalent to 295 crore or US$41 million in 2017) [122]
2016 4,344 crore (equivalent to 44 billion or US$620 million in 2017) 1,278 crore (equivalent to 13 billion or US$180 million in 2017) -467 crore (equivalent to 478 crore or US$67 million in 2017) [123][124]
2017 5,388 crore (US$750 million) 1,433 crore (US$200 million) -348 crore (US$48 million) [125]

Of note, Delhi Metro has been operating with a loss on an EBT basis for the past few years. EBITDA margin declined from 73% in Fiscal 2007 to 29% in Fiscal 2015. That said, Debt to Equity improved from 1.43 in FY07 to 1.22 in FY16.

Funding and capitalisation

DMRC is owned equally by the Government of National Capital Territory of Delhi and the Government of India.

As of March 2016, total debt stood at 291.5 billion (US$4.1 billion), while equity capital was 239.9 billion (US$3.3 billion). Cost of the debt is 0% for Union Government and Delhi Government loans and between 0.01% and 2.3% for Japan International Cooperation Agency (JICA) loans. Of the equity capital as of 31 March 2016, 193.1 billion (US$2.7 billion) is paid-up capital and rest is reserves and surplus.[123]

Operations

Inside the New Delhi Metro station.
HUDA City Centre metro station
Train at HUDA City Centre metro station

The trains operate at a frequency of one to two minutes to five to ten minutes between 05:00 and 00:00, depending upon the peak and off-peak hours. Trains operating within the network typically travel at speed up to 50 km/h (31 mph) and stop for about 20 seconds at each station. Automated station announcements are recorded in Hindi and English. Many stations have services such as ATMs, food outlets, cafés, convenience stores and mobile recharge. Eating, drinking, smoking and chewing gum are prohibited in the entire system. The Metro also has a sophisticated fire alarm system for advance warning in emergencies, and fire retardant material is used in trains as well as on the premises of stations.[126] Navigation information is available on Google Transit.[127] Since October 2010, the first coach of every train is reserved for women. However, last coaches are also reserved when the train changes tracks at the terminal stations in the Red, Green and Violet Lines.[128][129] To make travelling by metro a smoother experience, Delhi Metro has launched its own official mobile app Delhi Metro Rail for smartphone users,(iPhone and Android) that will provide information on various facilities like the location of the nearest metro station,[130] fare, parking availability, tourist spots near metro stations, security and emergency helpline numbers.[131]

Security

Security on the Delhi Metro is handled by the Central Industrial Security Force (CISF), who have been guarding the system ever since they took over from the Delhi Police in 2007.[132] Closed-circuit cameras are used to monitor trains and stations, and feed from these is monitored by both the CISF and Delhi Metro authorities at their respective control rooms.[133] Over 7000 CISF personnel have been deployed for security of metro and its installations in addition to metal detectors, X-ray baggage inspection systems, and dog squads which are used to secure the system. To deal with law and order issues in the system, 18 Delhi Metro Rail Police (A dedicated wing of Delhi Police) stations have been established. About 5,200 CCTV cameras have been installed, which cover every nook and corner of each Metro station. Each of the underground stations has about 45 to 50 cameras installed while the elevated stations have about 16 to 20 cameras each. The monitoring of these cameras is done by the CISF, which is in charge of security of the Metro, as well as the Delhi Metro Rail Corporation.[134] Intercoms are provided in each train car for emergency communication between the passengers and the train operator.[135] Periodic security drills are carried out at stations and on trains to ensure preparedness of security agencies in emergency situations.[136] DMRC is also looking at raising the station walls and railings for the safety of passengers.[137]

Ticketing and recharge

Delhi Metro Card for Common Mobility

For the convenience of customers, Delhi Metro commuters have three choices for ticket purchase. The RFID tokens are valid only for a single journey on the day of purchase and the value depends on the distance travelled, with fares for a single journey ranging from 10 (14¢ US) to 60 (84¢ US). Fares have been revised by DMRC and will be applicable from 10 October 2017. Fares are calculated based on the origin and destination stations using a fare chart.[138] A common ticketing facility for commuters travelling on Delhi Transport Corporation (DTC) buses and the Metro was introduced in 2011.[139] Travel cards are available for longer durations and are most convenient for frequent commuters. They are valid for ten years from the date of purchase or the date of the last recharge and are available in denominations of 200 (US$2.80) to 2,000 (US$27.90). A 10% discount is given on all travel made on it.An additional 10% discount is given to travel card holders for entering the metro system in off-peak hours i.e. From the start of revenue services to 0800 hours, from 1200 hours to 1700 hours and after 2100 hours to end of metro service in the night. This additional discount is given only on Weekdays i.e. from Monday to Saturday.[140] A deposit of 50 (70¢ US) needs to be made to buy a new card which is refundable on the return of the card any time before its expiry if the card is not physically damaged.[138] Tourist cards can be used for unlimited travel on the Delhi Metro network over short periods of time. There are two kinds of tourist cards valid for one and three days respectively. The cost of a one-day card is 200 (US$2.80) and that of a three-day card is 500 (US$7.00), including a refundable deposit of 50 (70¢ US) that must be paid at the time of purchasing the card.[138]

Problems

The Yellow Line at IFFCO Chowk in Gurgaon. After repeated complaints by nearby residents, Delhi Metro installed noise barriers in 2011 to reduce sound pollution from metro trains.[141]
Metro station and train entering.

As the network has expanded, high ridership in new trains has led to increasing instances of overcrowding and delays on the Delhi Metro.[142][143] To alleviate the problem, 8 coach trains have been introduced in Yellow line and Blue line and an increase in the frequency of trains has been proposed.[142] Infrequent, overcrowded and erratic feeder bus services connecting stations to nearby localities have also been reported as an area of concern.[144][145] While the quality and the cleanliness of the Delhi Metro was lauded, the rising cost of fares have been routinely criticized, with fares being much more expensive compared to the bus services the metro replaced.[11] One recent study has named the fares of the Delhi Metro as one of the world's most unaffordable.[146]

Feeder buses

DMRC operates around 291 feeder buses on 42 routes connecting 54 metro stations in Delhi. Around two lakh people use the feeder bus service on a daily basis.Timings of Feeder Bus operation are 08:00 Hours to 20:00 Hours at a frequency of 10 to 15 minutes depending upon Road Traffic density. However, if an operator wishes he can operate before/beyond these hours. At present Metro Feeder Bus Depots are located at Shastri Park, Kohat Enclave, Janakpuri West, Dwarka Sector-9, Chhatarpur, Yamuna Bank, Azadpur.

Ridership

Delhi Metro has been registering a continuous increase in ridership since its inception. When Metro services were introduced in 2002, the average ridership was 80,000 passengers per day. As of FY 2016–17, average daily ridership has risen to 2.76 million, with the latest daily ridership record set on 17 August 2016.

Most recent Delhi Metro daily ridership record of 3.3 million passengers was reached on the eve of the Rakshabandhan (17 August 2016), when commuters poured in large numbers throughout the day.[147]

On 25 December 2014, it was reported that the monthly ridership of the Airport Express had almost doubled in the past year to almost 600,000 passengers per month compared to just above 300,000 at the beginning of the calendar year.[148]

Currently, Delhi Metro has about 220 trains of four, six and eight coaches totalling 1,290 coaches. It is further planning to add 421 more coaches on the existing route before the completion of phase 3. During the financial year 2015, DMRC on an average pressed 1,083 coaches in an hour (during peak hour), in 2012–13, the number was 819. On an average, trains make 2,880 trips per day.[149]

Average daily ridership[150][151]
Year Ridership
2004–05
124,000
2005–06
268,000
2006–07
484,000
2007–08
625,000
2008–09
722,000
2009–10
919,000
2010–11
1,259,000
2011–12
1,660,000
2012–13
1,926,000
2013–14
2,190,000
2014–15
2,386,000
2015–16
2,590,000
2016–17
2,760,000

Delhi Metro snapshot

Delhi Metro
StationsLength (km)Ridership millionsNo. of linesRevenue
208296100185,387.856 crore (US$750 million)[125]
Ranking
India11111
Asia67109
World991613

Rolling stock

A Phase I broad gauge train, supplied by Hyundai RotemBEML.[152]
A Phase II broad gauge train, supplied by Bombardier.
One of the six-coach trains. Most trains of Blue & Yellow Lines have been upgraded from 4 to 6 & 8 coaches to increase capacity.

The Metro uses rolling stock of two different gauges. Phase I lines use 1,676 mm (5.499 ft) broad gauge rolling stock, while three Phase II lines use 1,435 mm (4.708 ft) standard gauge rolling stock.[153] Trains are maintained at seven depots at Khyber Pass and Sultanpur for the Yellow Line, Mundka for the Green Line, Najafgarh and Yamuna Bank for the Blue Line, Shastri Park for the Red Line, and Sarita Vihar for the Violet Line.[154][155]

Maglev trains were initially considered for some lines of Phase 3, but DMRC decided to continue with conventional rail in August 2012.[156]

As on 31 March 2015, the Company has a total of 1306 coaches (220 trains). Apart from extensions on various existing lines, two new lines viz. Line 7 & 8 are proposed in Phase III. 486 coaches (81 six-car trains) being procured for these two new lines will have an advance feature in Unattended Train Operation (UTO). Additional 258 Broad gauge (BG) coaches for Line 1 to 4 and 138 Standard Gauge (SG) coaches for Line 5 & 6 are proposed to be procured for augmentation/extensions to cater to the increased traffic. Resultantly, at the end of Phase III, there would be 2188 coaches (333 trains). Barring a few 4-car trains on Line 5, 93% of the trains would operate either in 6 car or 8 car configuration at the end of Phase III.[151]

Broad gauge

The rolling stock is manufactured by two major suppliers. For the Phase I, the rolling stock was supplied by a consortium of companies comprising Hyundai Rotem, Mitsubishi Corporation, and MELCO. The coaches have a very similar look to MTR Rotem EMU, except with only 4 doors and use sliding doors. The coaches were initially built in South Korea by ROTEM,[155] then in Bangalore by BEML through a technology transfer arrangement.[157] These trains consist of four 3.2-metre-wide (10 ft) stainless steel lightweight coaches with vestibules permitting movement throughout their length and can carry up to 1500 passengers,[158] with 50 seated and 330 standing passengers per coach.[159] The coaches are fully air-conditioned, equipped with automatic doors, microprocessor-controlled brakes and secondary air suspension,[160] and are capable of maintaining an average speed of 32 km/h (20 mph) over a distance of 1.1 km (0.68 mi).[159] The system is extensible up to eight coaches, and platforms have been designed accordingly.[158]

The rolling stock for Phase II is being supplied by Bombardier Transportation, which has received an order for 614 cars worth approximately US$1.1 billion.[161] While initial trains were made in Görlitz, Germany and Sweden, the remainder will be built at Bombardier's factory in Savli, near Vadodara.[162] These trains are a mix of four-car and six-car consists, capable of accommodating 1178 and 1792 commuters per train respectively. The coaches possess several improved features like Closed Circuit Television (CCTV) cameras with eight-hour backup for added security, charging points in all coaches for cell phones and laptops, improved air conditioning to provide a temperature of 25 °C (77 °F) even in packed conditions and heaters for winter.[163]

Standard gauge

The standard gauge rolling stock is manufactured by BEML at its factory in Bangalore (Most of these trains are supplied to BEML by Hyundai Rotem). The trains are four-car consists with a capacity of 1506 commuters per train,[164] accommodating 50 seated and 292 standing passengers in each coach.[159] These trains will have CCTV cameras in and outside the coaches, power supply connections inside coaches to charge mobiles and laptops, better humidity control, microprocessor-controlled disc brakes,[165] and will be capable of maintaining an average speed of 34 km/h (21 mph) over a distance of 1.1 km (0.68 mi).[159]

Airport Express

Eight 6-car trains supplied by CAF Beasain were imported from Spain.[166] CAF held 5% equity in the DAME project, and Reliance Infrastructure held the remaining 95%[167] before DMRC took over the operations. The trains on this line are of a premium standard compared to the existing metro trains and have inbuilt noise reduction and padded fabric seats. The coaches are equipped with LCD screens for the entertainment of the passengers and also provide flight information for the convenience of air travellers. The trains are fitted with an event recorder which can withstand high levels of temperature and impact and the wheels have flange lubrication system for less noise and better riding comfort.[128]

Signalling and telecommunication

Inside a Hyundai Rotem coach.
Signalling system on the Delhi Metro

The Delhi Metro uses cab signalling along with a centralised automatic train control system consisting of automatic operation, protection and signalling modules.[168] A 380 MHz digital trunked TETRA radio communication system from Motorola is used on all lines to carry both voice and data information.[169] For Blue Line Siemens Transportation Systems has supplied the electronic interlocking Sicas, the operation control system Vicos OC 500 and the automation control system LZB 700 M.[170] An integrated system comprising optical fibre cable, on-train radio, CCTV, and a centralised clock and public address system is used for telecommunication during train operations as well as emergencies.[171] For Red and Yellow lines ALSTOM has supplied signalling system and for Green and Violet lines, Bombardier Transportation has supplied CITYFLO 350 signalling system.

The Airport Express line has introduced WiFi services at all stations along the route on 13 January 2012.[172] Connectivity inside metro trains travelling on the route is expected in the future. The WiFi service is provided by YOU Broadband and Cable India Limited.[173] In August 2017, Wifi service was launched at all the 50 stations under Blue Line.[174]

A fully automated, operatorless train system has been offered to Delhi Metro by the French defence and civilian technologies major Thales.[175]

Environment and aesthetics

The Delhi Metro has won awards for environmentally friendly practices from organisations including the United Nations,[176] RINA,[177] and the International Organization for Standardization,[177] becoming the second metro in the world, after the New York City Subway, to be ISO 14001 certified for environmentally friendly construction.[178] Most of the Metro stations on the Blue Line conduct rainwater harvesting as an environmental protection measure.[179] It is also the first railway project in the world to earn carbon credits after being registered with the United Nations under the Clean Development Mechanism,[180] and has so far earned 400,000 carbon credits by saving energy through the use of regenerative braking systems on its trains.[181] To reduce its dependence on non-renewable sources of energy, DMRC is looking forward to harnessing solar energy and install solar panels at the Karkardooma, Noida Sector-21, Anand Vihar and Pragati Maidan Metro stations and DMRC's residential complex at Pushp Vihar.[182][183] As of March 2017, the DMRC has commissioned 20 MWp (megawatt peak) of solar power plants across 21 locations on the metro network. This is planned to increase to 31 MWp by March 2018, and 50 MWp by 2021.[184]

The Metro has been promoted as an integral part of community infrastructure, and community artwork depicting the local way of life has been put on display at stations.[185] Students of local art colleges have also designed decorative murals at Metro stations,[186] while pillars of the viaduct on some elevated sections have been decorated with mosaic murals created by local schoolchildren.[187] The Metro station at INA Colony has a gallery showcasing artwork and handicrafts from across India,[188] while all stations on the Central Secretariat – Qutub Minar section of the Yellow Line have panels installed on the monumental architectural heritage of Delhi.[189] The Nobel Memorial Wall at Rajiv Chowk has portraits of the seven Nobel Laureates from India: Rabindranath Tagore, CV Raman, Hargobind Khorana, Mother Teresa, Subrahmanyan Chandrasekhar, Amartya Sen and Venkatraman Ramakrishnan and provide details about their contribution to society and a panel each on Alfred Nobel and the Nobel Prizes.

See also

Notes

  1. As of August 2018, the number is 214 if interchange stations (i.e. different sets of platforms) are counted multiple times, once for each line, while it's 196, including the six stations on the Delhi Airport Metro Express line, if they're combined.[1]

References

  1. "Delhi Metro Introduction". DMRC. Retrieved 2017-12-25.
  2. "Delhi Metro's Cumulative Ridership for the financial year 2016-2017 crosses one billion (100 crores)". www.delhimetrorail.com. Archived from the original on 16 April 2017.
  3. 1 2 "Delhi Metro's Cumulative Ridership for the financial year 2016-2017 crosses one billion (100 crores)". DMRC. Archived from the original on 16 April 2017.
  4. "Mangu Singh to be next Metro chief". The Times of India. 20 October 2011.
  5. 1 2 3 4 5 6 7 8 "About Us – Introduction". Delhi Metro Rail Corporation. Archived from the original on 3 October 2017. Retrieved 16 January 2018.
  6. https://themetrorailguy.com/snapshot-of-how-indian-metro-systems-stack-up-with-one-another/
  7. "CoMET and Nova Members – CoMET and Nova Metro Benchmarking Groups". cometandnova.org. Archived from the original on 6 February 2015.
  8. Sood, Jyotika (26 July 2017). "How metro rail networks are spreading across India". Livemint. New Delhi: HT Media Ltd. Archived from the original on 16 August 2017. Retrieved 16 January 2018.
  9. "First and Last Train Timings" (PDF). www.delhimetrorail.com. Archived (PDF) from the original on 12 July 2017. Retrieved 16 June 2017.
  10. Roy, Sidharatha (25 December 2017). "Delhi Metro: It all started 15 Xmas days ago". The Times of India. New Delhi. Archived from the original on 7 January 2018. Retrieved 16 January 2018.
  11. 1 2 3 Siemiatycki 2006, p. 279
  12. Siemiatycki 2006, pp. 279–280
  13. 1 2 "History of Delhi Metro". DMRC. Archived from the original on 25 September 2010. Retrieved 17 September 2009.
  14. Pucher, John; Nisha Korattyswaroopam,; Neenu Ittyerah (2004). "The Crisis of Public Transport in India" (PDF). Journal of Public Transportation. 7 (4): 1–20. Archived from the original (pdf) on 3 July 2011. Retrieved 17 September 2009.
  15. "Structure of Delhi Metro". DMRC. Archived from the original on 16 September 2010. Retrieved 17 September 2009.
  16. "Delhi metro rail work begins but without fanfare". The Indian Express. Archived from the original on 18 April 2008.
  17. "Delhi Metro showcases public sector success". The Indian Express. 13 April 2007. Archived from the original on 25 December 2008. Retrieved 10 September 2009.
  18. "二零零一度" (PDF). MTR Corporation. Retrieved August 3, 2017.
  19. "Delhi Metro Rail to adopt BG system". Business Line. New Delhi: The Hindu. 7 August 2000. Archived from the original on 1 February 2016. Retrieved 16 January 2018.
  20. "Indian PM launches Delhi metro". BBC News. 24 December 2002. Archived from the original on 22 April 2012. Retrieved 22 April 2010.
  21. "Yellow Line (Delhi Metro)". Wikipedia. 2017-12-25.
  22. "The Tribune, Chandigarh, India – Delhi and neighbourhood". www.tribuneindia.com. Archived from the original on 12 March 2016. Retrieved 12 February 2017.
  23. "The Tribune – Magazine section – Saturday Extra". www.tribuneindia.com. Archived from the original on 16 July 2007. Retrieved 12 February 2017.
  24. Nandini Lakshman (19 March 2007). "The Miracle-Worker of the Delhi Metro". BusinessWeek. Archived from the original on 25 December 2008. Retrieved 10 September 2009.
  25. "Delhi Metro bridge collapses; 1 dead". IBN Live. CNN-IBN. 19 October 2008. Retrieved 19 October 2008.
  26. "A chronology of Delhi Metro accidents". Hindustan Times. 12 July 2009. Archived from the original on 7 January 2018. Retrieved 22 January 2018.
  27. Suri, Megha (14 July 2009). "Day 2: 3 cranes fall, Metro image takes beating". The Times of India. New Delhi. Archived from the original on 27 June 2014. Retrieved 22 January 2018.
  28. "Labourer dies at Delhi Metro construction site". Central Chronicle. 22 July 2009. Archived from the original on 8 July 2011. Retrieved 22 April 2010.
  29. Mathur, Atul (7 December 2009). "City's nightmare on wheels". Hindustan Times. Delhi. Archived from the original on 22 January 2018. Retrieved 22 January 2018.
  30. "Five injured as iron girder falls off Metro structure in Ghaziabad". Hindustan Times. Delhi. 23 April 2018. Archived from the original on 23 April 2018.
  31. 1 2 "PROJECT UPDATE". Delhi Metro Rail Corporation. Archived from the original on 23 February 2014. Retrieved 2 March 2014.
  32. "Phase 1 complete, Pragati Maidan now on Metro map". Express India. 27 October 2006. Retrieved 18 April 2010.
  33. Ramachandran, Smriti Kak (17 September 2007). "Delhi Metro confident of meeting deadline". The Hindu. New Delhi. Archived from the original on 3 March 2018. Retrieved 10 September 2009.
  34. 1 2 "Present Network". Delhi Metro Rail Corporation Ltd. Retrieved 23 September 2018.
  35. 1 2 "Route Map". Delhi Metro Rail Corporation Ltd. Retrieved 23 September 2018.
  36. "Metro Station Numbers". Delhi Metro Rail Corporation. Archived from the original on 13 February 2014. Retrieved 22 January 2018.
  37. "Delhi Metro Red Line". Archived from the original on 5 October 2016. Retrieved 20 September 2016.
  38. 1 2 "On May 2, Metro to cross Yamuna again". The Times of India. New Delhi. 24 April 2009. Archived from the original on 3 February 2015. Retrieved 16 January 2018.
  39. "Prime Minister inaugurates Metro Rail services between Tis Hazari and Shahdara" (Press release). Press Information Bureau, Government of India. 24 December 2002. Archived from the original on 21 July 2011. Retrieved 29 March 2010.
  40. "Passengers swamp Delhi's new metro". Sydney Morning Herald. 27 December 2002. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
  41. "70,000 travel by Tri Nagar-Tis Hazari Metro rail". The Times of India. New Delhi. 5 October 2003. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
  42. 1 2 3 "Metro Station Information". DMRC. Archived from the original on 18 September 2010. Retrieved 29 March 2009.
  43. "DMRC to introduce six-coach trains on Dilshad Garden-Rithala line on Sunday". The Times of India. New Delhi. 23 November 2013. Archived from the original on 4 February 2015. Retrieved 16 January 2018.
  44. "A subterranean journey begins". The Times of India. New Delhi. 20 December 2004. Archived from the original on 3 March 2018. Retrieved 22 January 2018.
  45. 1 2 "Delhi Metro Museum Celebrates 3rd Anniversary". RailNews Media India Ltd. Archived from the original on 11 September 2014.
  46. "Hauz Khas set to get deepest underground metro station by March 2016". The Indian Express. New Delhi. 16 September 2014. Archived from the original on 16 January 2018. Retrieved 22 January 2018.
  47. "Chhattarpur Metro Station To Become Operational From Tomorrow" (Press release). New Delhi: Delhi Metro Rail Corporation. 25 August 2010. Archived from the original on 7 November 2017. Retrieved 22 January 2018.
  48. "Chattarpur station to open today". The Times of India. New Delhi. 26 August 2010. Archived from the original on 3 March 2018. Retrieved 22 January 2018.
  49. "Gurgaon gets a lifeline as CST-Qutub corridor opens". Sify News. New Delhi. 8 September 2010. Archived from the original on 16 November 2017. Retrieved 22 January 2018.
  50. "The Jahangirpuri- Samaypur Badli section (Extension of Line-2)". Delhi Metro. Archived from the original on 13 November 2015. Retrieved 9 November 2015.
  51. Sharma, Nidhi (29 June 2005). "New Delhi Metro station, your connect with National rail". The Times of India. New Delhi. Archived from the original on 22 January 2018. Retrieved 22 January 2018.
  52. "Secretariat to DU in 18 minutes flat". The Hindu. New Delhi. 1 July 2005. Archived from the original on 1 February 2016. Retrieved 22 January 2018.
  53. 1 2 "Metro enters Noida, set to change travelling habits of people". Daily News and Analysis. 12 November 2009. Archived from the original on 31 May 2012. Retrieved 12 January 2009.
  54. 1 2 "Metro to travel underground and overhead". The Times of India. 28 December 2005. Archived from the original on 26 January 2013. Retrieved 4 April 2010.
  55. Gaurav Vivek Bhatnagar (12 November 2006). "Delhi Metro just got bigger and better". The Hindu. Archived from the original on 29 June 2011. Retrieved 4 April 2010.
  56. "Delhi Anand Vihar Metro line opens for public". The Economic Times. 7 January 2010. Archived from the original on 10 January 2010. Retrieved 8 January 2010.
  57. "Anand Vihar – Vaishali Section To Open For Passenger Services From 14th July 2011" (Press release). DMRC. 13 July 2011. Archived from the original on 27 July 2011.
  58. "Press Release: DMRC Extends Metro Services To Dwarka Sector 21 on Line-3" (Press release). DMRC. 30 October 2010. Archived from the original on 23 November 2010. Retrieved 30 October 2010.
  59. "40000 Footfalls at Anand Vihar Metro on Day 1". Outlook India. 7 January 2010. Archived from the original on 17 January 2010. Retrieved 4 April 2010.
  60. "Metro gets first standard gauge depot". The Hindu. New Delhi. 23 February 2010. Retrieved 16 January 2018.
  61. 1 2 "Metro from Central Secretariat to Sarita Vihar too". Yahoo! News. New Delhi. 3 October 2010. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
  62. Suri, Megha (16 October 2010). "Train services on Delhi Metro's Central Secretariat to Sarita Vihar section will start one hour late (from 7 am) from October 17 to October 24 for integration of the section with the extension to Badarpur". The Times of India. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
  63. "DMRC opens Sarita Vihar–Badarpur section". Hindustan Times. 14 January 2011. Archived from the original on 20 October 2012. Retrieved 14 January 2011.
  64. "Janpath to Faridabad: On Sunday morning, a Metro ride for PM Modi". Hindustan Times. PTI. 6 September 2015. Archived from the original on 6 September 2015. Retrieved 6 September 2015.
  65. "Faridabad Metro Stations get highest Green Building Rating". www.delhimetrorail.com. Archived from the original on 8 December 2015.
  66. Ray, Subhendu (23 January 2012). "NCR's longest Metro line in Faridabad". Hindustan Times. Delhi. Archived from the original on 3 March 2018. Retrieved 16 January 2018.
  67. "Delhi: Kashmere Gate set to become biggest interchange station". The Indian Express. New Delhi. 26 May 2017. Archived from the original on 25 August 2017. Retrieved 15 January 2018.
  68. Singh, Megha Suri (17 August 2010). "Hawk-eyed vigil on airport metro line". The Times of India. New Delhi. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
  69. "Delhi Airport Express rail link opens". Railway Gazette International. Retrieved 7 July 2012.
  70. 1 2 "Airport Express Link: Metro gives a preview". The Indian Express. New Delhi. 6 November 2009. Archived from the original on 1 February 2016. Retrieved 16 January 2018.
  71. "Airport Metro misses CWG deadline". NDTV. 3 October 2010. Archived from the original on 6 October 2010. Retrieved 9 November 2010.
  72. "Cities / Delhi : Airport to be 20 minutes from Connaught Place from Wednesday". The Hindu. 21 February 2011. Archived from the original on 28 September 2011. Retrieved 24 October 2011.
  73. "Delhi Airport Metro Express back on track". Livemint. New Delhi: HT Media Ltd. 22 January 2013. Archived from the original on 17 January 2018. Retrieved 16 January 2018.
  74. "Delhi Metro takes over operations of Airport Express Line". The Hindu. 1 July 2013. Archived from the original on 4 July 2013. Retrieved 5 July 2013.
  75. "Airport Metro sees 30% rise in ridership after fare reduction". Business Standard. 1 January 2015. Archived from the original on 7 January 2015. Retrieved 19 January 2015.
  76. "DMRC to reduce Airport line fares". The Times of India. 15 September 2015. Archived from the original on 18 September 2015. Retrieved 15 September 2015.
  77. "Delhi Metro rings in the New Year under new chief". Jagran Post. New Delhi: Dainik Jagran. 1 January 2012. Archived from the original on 2 July 2017. Retrieved 16 January 2018.
  78. 1 2 3 "Metro to cover whole of Delhi by 2012". Economic Times. 11 December 2011. Retrieved 8 April 2012.
  79. "Jung wants better access to all Metro stations". The Indian Express. 23 April 2014. Archived from the original on 24 April 2014. Retrieved 24 April 2014.
  80. 1 2 "Phase 3 Corridors" (Press release). DMRC. Archived from the original on 6 June 2017. Retrieved 4 June 2017.
  81. "Tunnelling work starts for Metro's Phase III". Economic Times. 31 January 2012. Retrieved 8 April 2012.
  82. 1 2 3 Will not let funding row derail Phase-IV: Government Archived 7 July 2017 at the Wayback Machine., The Economic Times, 4 July 2017.
  83. Ray, Amrita, ed. (25 December 2017). "Delhi Metro Inauguration Live Updates: Botanical Garden-Kalkaji Mandir Section Thrown Open To Public". NDTV. New Delhi. Archived from the original on 30 December 2017. Retrieved 16 January 2018.
  84. "Metro to introduce advanced signalling system in Phase-III". Economic Times. 15 December 2011. Retrieved 8 April 2012.
  85. "Annual Report 2014-2015" (PDF). Delhi Metrorail. Retrieved August 3, 2018.
  86. "Excavation Begins for Delhi Metro Airport Line's Extn to Dwarka ECC - The Metro Rail Guy". themetrorailguy.com. Retrieved 2018-08-03.
  87. "IGI metro to expand, reach Dwarka Sector 25 - Times of India". The Times of India. Retrieved 2018-08-03.
  88. "New high for Metro with track at 24m". The Indian Express. 26 September 2014.
  89. Delhi Metro Phase-4 gets government nod Archived 9 July 2017 at the Wayback Machine., The Times of India, 6 January 2017.
  90. Gaurav Vivek Bhatnagar (25 December 2006). "Delhi Metro map to cover Greater Noida". The Hindu. Archived from the original on 1 June 2009. Retrieved 10 September 2009.
  91. Megha Suri (30 January 2010). "Pvt metro link to get Central nod soon". The Times of India. Retrieved 2 February 2010.
  92. "Delhi Metro proposes inviting private partners to run trains in Phase 4". https://www.hindustantimes.com/. 2018-03-14. Retrieved 2018-10-07. External link in |work= (help)
  93. 1 2 "Delhi Metro to be extended till Sonepat in Haryana". Zee News. 2017-06-01. Retrieved 2018-08-04.
  94. "Delhi Metro Phase 4: Why Arvind Kejriwal government thinks the project will be a "colossal" waste of money". The Financial Express. 2018-06-26. Retrieved 2018-09-06.
  95. "3 proposed corridors don't get government nod, metro Phase IV to be delayed - Times of India". The Times of India. Retrieved 2018-09-06.
  96. "Red flags over Delhi Metro Phase IV corridors". The Indian Express. 2018-06-26. Retrieved 2018-10-07.
  97. 1 2 "DMRC : INFLUENCE ZONE OF DMRC (FOR NOC) - PHASE 4". www.delhimetrorail.com. Retrieved 2018-08-03.
  98. 1 2 "Selection of Consultant for Carrying out Hydro-geological Study for Delhi MRTS Phase-IV" (PDF). Delhi Metrorail. March 31, 2017. Retrieved August 3, 2018.
  99. 1 2 "DMRC Publishes New Phase 4 Map & Table of Delhi's Metro Project - The Metro Rail Guy". themetrorailguy.com. Retrieved 2018-08-03.
  100. "Haryana Govt. Approves Delhi Metro's 4.86 km Extn to Kundli - The Metro Rail Guy". themetrorailguy.com. Retrieved 2018-08-04.
  101. 1 2 "DMRC submits plan to extend metro from Noida to Ghaziabad - Times of India". The Times of India. Retrieved 2018-08-04.
  102. 1 2 "GDA Approves Extn of Delhi's Blue Line from Vaishali to Mohan Nagar - The Metro Rail Guy". themetrorailguy.com. Retrieved 2018-08-04.
  103. 1 2 "Govt changes its mind again, no Dwarka-Gurugram Metro in near future - Times of India". The Times of India. Retrieved 2018-08-04.
  104. "Now, Khattar says Dwarka-Iffco Metro line in 'extreme final stage' - Times of India". The Times of India. Retrieved 2018-08-04.
  105. Kumar, Ashok (2017-05-04). "Metro to connect HUDA City Centre station with Gurugram railway station". The Hindu. ISSN 0971-751X. Retrieved 2018-08-06.
  106. "Delhi Metro to come up with eight new corridors in Phase IV". India Today. Retrieved 2018-08-04.
  107. "Govt proposes 6 new Metro routes - Times of India". The Times of India. Retrieved 2018-08-04.
  108. "DMRC MD Approves Survey for Modified 95.86 km Phase 4 - The Metro Rail Guy". themetrorailguy.com. Retrieved 2018-08-04.
  109. "Metro to run deeper into Noida, Ghaziabad by September - Times of India". The Times of India. Retrieved 2018-08-04.
  110. "TCP department realigns metro route linking Gurgaon to Manesar - Times of India". The Times of India. Retrieved 2018-08-04.
  111. 1 2 3 Expected PM Narendra Modi to announce Metro's extension to other parts of Haryana, says CM Bhupinder Hooda Archived 26 October 2016 at the Wayback Machine., DNA India News, September 2015.
  112. "Haryana CM announces extension of Delhi Metro upto Jhajjar town – RailNews Media India Ltd". www.railnews.in. Retrieved 2018-08-06.
  113. YEIDA revives proposal for Greater Noida-Jewar airport Metro Archived 9 May 2017 at the Wayback Machine., The Economic Times, 25 April 2017.
  114. "Annual Reports - 2006-07" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 21 September 2017. Retrieved 22 January 2018.
  115. "Annual Reports - 2007-08" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 21 September 2017. Retrieved 22 January 2018.
  116. "Annual Reports - 2008-09" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 21 September 2017. Retrieved 22 January 2018.
  117. "Annual Reports - 2009-10" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 21 September 2017. Retrieved 22 January 2018.
  118. "Annual Reports - 2010-11" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 21 September 2017. Retrieved 22 January 2018.
  119. "Annual Reports - 2011-12" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 10 January 2017. Retrieved 22 January 2018.
  120. "Annual Reports - 2012-13" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 4 March 2016. Retrieved 22 January 2018.
  121. "Annual Reports - 2013-14" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 16 December 2017. Retrieved 22 January 2018.
  122. "Annual Reports 2014-15" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 4 March 2016. Retrieved 20 January 2018.
  123. 1 2 "Annual Reports 2015-16" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 23 January 2018. Retrieved 22 January 2018.
  124. Singh, Sudheer Pal (31 May 2016). "Delhi Metro Rail finances in the red". Business Standard. New Delhi. Archived from the original on 30 September 2017. Retrieved 22 January 2018.
  125. 1 2 "Annual Accounts And Directors Report 2016-17" (PDF). Delhi Metro Rail Corporation. Archived (PDF) from the original on 3 December 2017. Retrieved 22 January 2018.
  126. "Measures to Ensure Safe Passage for Metro Train Passengers" (Press release). Press Information Bureau, Government of India. 27 August 2010. Archived from the original on 15 July 2015. Retrieved 27 August 2010.
  127. "Delhi Metro routes now on Google Maps". The Economic Times. 5 March 2010. Archived from the original on 7 March 2010. Retrieved 11 March 2010.
  128. 1 2 "Delhi Metro to reserve coach for women from October 2". The Times of India. 26 September 2010. Archived from the original on 28 September 2010. Retrieved 27 September 2010.
  129. "Women get exclusive coach in Delhi Metro". Hindustan Times. 2 October 2010. Archived from the original on 16 December 2014. Retrieved 2 October 2010.
  130. "Delhi Metro launches new app with additional features".
  131. "DMRC launches smart phone app". The Hindu. New Delhi. 23 August 2013. Archived from the original on 1 February 2016. Retrieved 16 January 2018.
  132. "CISF to take over Delhi Metro security". The Times of India. 7 March 2007. Retrieved 15 April 2010.
  133. "Delhi metro parking areas to be bought under CCTV cameras". Daily News and Analysis. 21 March 2010. Archived from the original on 26 August 2010. Retrieved 15 April 2010.
  134. Megha Suri Singh (30 March 2010). "Moscow blasts put Metro security in alert mode". The Times of India. Retrieved 15 April 2010.
  135. "Commuters Guide to Security on Delhi Metro" (pdf). DMRC. Archived (PDF) from the original on 20 September 2010. Retrieved 15 April 2010.
  136. "Mock drills at 4 Metro stations". The Times of India. 26 March 2010. Retrieved 15 April 2010.
  137. "Metro to raise height of walls at stations". The Times of India. 9 May 2012. Retrieved 9 May 2012.
  138. 1 2 3 "Route & fare". DMRC. Archived from the original on 17 September 2010. Retrieved 22 September 2010.
  139. "Common tickets for DTC, Metro by 2011". Sify News. 26 March 2010. Archived from the original on 2 April 2010.
  140. "10 % Discount on Metro SMART CARDS". DMRC. Archived from the original on 6 June 2007.
  141. "Noise barriers not enough, residents want speed of Metro trains to be slowed". Hindustan Times. 2011. Retrieved 14 July 2018.
  142. 1 2 Dutta, Sweta (16 November 2009). "Widening reach, Metro looks at ways to ease rush". The Indian Express. New Delhi. Archived from the original on 28 June 2017. Retrieved 15 January 2018.
  143. Atul Mathur (19 November 2009). "Crowded stations, slow trains". Hindustan Times. Archived from the original on 22 November 2009. Retrieved 21 November 2009.
  144. Atul Mathur (8 December 2009). "Feeder service or the lack of it". Hindustan Times. Archived from the original on 11 July 2011. Retrieved 8 December 2009.
  145. "Parking, feeder bus woes on Metros Noida line". Retrieved 12 February 2017.
  146. "Delhi Metro is second-most unaffordable in world: CSE - Times of India". The Times of India. Retrieved 2018-09-06.
  147. {http://www.delhimetrorail.com/press_reldetails.aspx?id=ziW90Fh2LBwlld}
  148. Singh, Pragya (25 December 2014). "100 per cent rise in Airport Metro Line ridership". The Asian Age. Archived from the original on 25 December 2014. Retrieved 25 December 2014.
  149. Haidar, Faizan (7 October 2015). "Delhi Metro: Steep rise in ridership beats network expansion". Hindustan Times. Archived from the original on 26 August 2017. Retrieved 15 January 2018.
  150. "Delhi Metro's Cumulative Ridership for the financial year 2016-2017 crosses one billion (100 crores)" (pdf). DMRC. Archived from the original on 16 April 2017. Retrieved 25 February 2015.
  151. 1 2 "Archived copy" (PDF). Archived (PDF) from the original on 23 December 2015. Retrieved 25 December 2015.
  152. Reuters – Hyundai Rotem gets m order to supply trains. In.reuters.com. Retrieved on 24 October 2011.
  153. "Delhi Metro gets standard gauge train". Business Line. New Delhi: The Hindu. 18 March 2009. Archived from the original on 11 August 2011. Retrieved 22 January 2018.
  154. "Metro gets first standard gauge depot". The Hindu. New Delhi. 23 February 2010. Retrieved 22 January 2018.
  155. 1 2 "Delhi Metro, India". Railway-Technology.com. Archived from the original on 3 March 2018. Retrieved 12 May 2014.
  156. "Delhi Metro says no to Maglev technology". The Indian Express. New Delhi. 8 August 2012. Archived from the original on 1 February 2016. Retrieved 22 January 2018.
  157. P. Manoj (25 August 2005). "BEML to rake in big money from proposed metro projects". The Hindu. Archived from the original on 28 March 2008. Retrieved 26 September 2009.
  158. 1 2 "Second Metro rail arrives in Delhi". The Times of India. 15 October 2002. Retrieved 26 September 2009.
  159. 1 2 3 4 "Rolling Stock: Ensuring Passenger Comfort, Safety and Reliability" (jpg). DMRC. Archived from the original on 21 October 2010. Retrieved 27 September 2010.
  160. "Metro Rail gets first train". The Hindu. 27 July 2002. Archived from the original on 8 July 2011. Retrieved 26 September 2009.
  161. "Bombardier to Deliver Further 76 MOVIA Metro Cars to Delhi Metro from Savli India Site". Press Release. Bombardier. 5 September 2011. Archived from the original on 16 November 2011. Retrieved 3 November 2011.
  162. "Bombardier to supply coaches to Delhi Metro". projectsmonitor.com. Archived from the original on 14 January 2010.
  163. "Metro to get swankier, bigger coaches". The Times of India. 17 September 2009. Retrieved 26 September 2009.
  164. "BEML delivers India's 1st standard gauge metro car". The Economic Times. New Delhi. 11 September 2009. Archived from the original on 15 January 2018. Retrieved 15 January 2018.
  165. Ramachandran, Smriti Kak (30 July 2009). "Trial run begins on first standard gauge Metro line". The Hindu. New Delhi. Archived from the original on 3 March 2018. Retrieved 15 January 2018.
  166. "Airport line handed over to Reliance Infra". The Indian Express. 20 May 2010. Archived from the original on 5 September 2010. Retrieved 5 June 2010.
  167. "Delhi Airport line contracts finalised" (PDF). Construcciones y Auxiliar de Ferrocarriles. Archived from the original (PDF) on 18 July 2011.
  168. "Technical Notes: Signalling". DMRC. Archived from the original on 12 March 2008. Retrieved 23 November 2009.
  169. "Delhi Metro Railway Corporation, India" (PDF). Motorola Electronics. Archived from the original (PDF) on 4 October 2012. Retrieved 3 January 2010.
  170. "Metro Line 3, New Delhi, India". Siemens AG. Archived from the original on 11 December 2008. Retrieved 6 July 2008.
  171. "Technical Notes: Telecommunication". DMRC. Archived from the original on 26 December 2007. Retrieved 23 November 2009.
  172. "Delhi Airport Metro Express". Delhi metro times. Archived from the original on 20 January 2015. Retrieved 4 August 2012.
  173. "Reliance Metro Airport Express, WiFi-enabled, EVS Chakravarthy, CEO YOU Broadband". Business Wire India. Retrieved 22 August 2018.
  174. "Delhi Metro launches WiFi on Blue Line stations". Economic Times. 25 August 2017. Retrieved 22 August 2018.
  175. "Delhi Metro offered fully-automated, driverless train system". Archived from the original on 29 January 2014. Retrieved 25 May 2012.
  176. "Delhi Metro gets UN certificate for preventing carbon emission". The Times of India. New Delhi. 22 February 2009. Archived from the original on 17 May 2014. Retrieved 15 January 2018.
  177. 1 2 "Delhi Metro gets OHSAS 18001". DMRC. Archived from the original on 7 June 2008. Retrieved 10 September 2009.
  178. "Press Release: Delhi Metro Receives ISO 14001 For Eco-friendly Systems". USAID. 24 December 2002. Archived from the original on 13 September 2009. Retrieved 27 September 2010.
  179. "Delhi Metro shows the way with water harvesting units". The Times of India. 26 September 2005. Retrieved 27 September 2010.
  180. "Delhi Metro is first rail project to earn carbon credits". The Economic Times. New Delhi. 5 January 2008. Archived from the original on 22 January 2018. Retrieved 22 January 2018.
  181. Sinha, Neha (20 December 2009). "Delhi Metro on track to earn carbon credits". The Indian Express. New Delhi. Archived from the original on 23 January 2018. Retrieved 22 January 2018.
  182. "Metro mulls solar panels at stations to go green". The Times of India. New Delhi. 5 June 2012. Archived from the original on 22 January 2018. Retrieved 22 January 2018.
  183. "Delhi Metro to install three new solar power plants". Biharprabha. New Delhi: Biharprabha. 3 July 2014. Archived from the original on 15 July 2014. Retrieved 22 January 2018.
  184. Shaikh, Ateeq (23 March 2017). "Airports, hospitals light up 40 gw rooftop solar plan". Daily News and Analysis. Archived from the original on 15 January 2018. Retrieved 22 January 2018.
  185. Siemiatycki 2006, p. 284
  186. Mukherjee, Anuradha (13 December 2002). "Vibrant murals bring cheer". The Times of India. New Delhi. Archived from the original on 22 January 2018. Retrieved 22 January 2018.
  187. Preeti Jha (10 October 2007). "Murals by Salwan Public School students decorate Metro pillars on Pusa Road". The Indian Express. Archived from the original on 14 October 2012. Retrieved 2 February 2010.
  188. "At INA Metro station, a gallery for traditional art, crafts". The Indian Express. New Delhi. 2 September 2010. Archived from the original on 1 February 2016. Retrieved 22 January 2018.
  189. Smriti Kak Ramachandran (2 September 2010). "Delhi metro gets a handicrafts gallery". The Hindu. Archived from the original on 29 June 2011. Retrieved 21 September 2010.

Notes

  • Siemiatycki, Matti (June 2006). "Message in a Metro: Building Urban Rail Infrastructure and Image in Delhi, India" (PDF). International Journal of Urban and Regional Research. 30 (2): 259–277. Archived from the original (PDF) on 24 August 2009. Retrieved 17 September 2009.

Further reading

  • Rashmi Sadana (30 May – 2 June 2012). "Metrocity Journal: Up, Up and Away". The Wall Street Journal.
  • Rashmi Sadana (13 November 2010). "On the Delhi Metro: An Ethnographic View". Economic and Political Weekly. 45 (46): 77–83.
  • G. S. Dhillon (29 January 2004). "Trenchless tunnelling". The Tribune.
  • A dream revisited: an archival journey into the making of the Delhi Metro Rail. DMRC. 2003. OCLC 54073649.
  • A journey to remember. DMRC. 2008. p. 94. OCLC 300027063.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.