Taichung Metro

Taichung Metro
Overview
Locale Taichung & Changhua
Transit type Rapid transit
Operation
Operation will start Unknown
Operator(s) Taichung Mass Rapid Transit System Co.
Technical
System length 31.8 km (19.8 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Taichung Metro
Traditional Chinese 臺中捷運
Taichung MRT
Traditional Chinese 臺中都會區大眾捷運系統

The Taichung Metro (also called Taichung Mass Rail Transit or Taichung MRT) is a rapid transit system currently being constructed by the city government of Taichung, Taiwan. In addition to Taichung, it may serve Changhua and Nantou counties.

History

Planning of the Taichung MRT started in 1990 with a study conducted by the Taiwanese Bureau of Housing and Urban Development.[1] The study was completed in 1998 and suggested the implementation of three routes (Red, Green, and Blue). The project was formally approved by the Executive Yuan of the ROC government on November 23, 2004. The city government signed a joint development contract with the Taipei City Government on December 12, 2007.[2]

Meanwhile, the Taichung City Government started their own planning of more lines and decided that the much cheaper BRT system would be the future of mass transit in Taichung. Since the corridor of the originally proposed Red Line is partially served by the TRA mass transit construction, the Blue Line corridor was chosen as a first step to implement BRT in Taichung.

Construction of the first line, the Green Line, had been paid for and was expected to begin in October 2007, though it was pushed back and started construction on October 8, 2009.[3] The 16.7 km (10.4 mi) section of the Green Line is now scheduled for completion by 2018 and will include 15 stations.

On March 9, 2011, Kawasaki Heavy Industries announced that it had won a joint order with Alstom Transport SA (France) and CTCI Corp. (Taiwan) to supply 36 units consisting of two-car, driverless trains totaling 29.5 billion yen.[4] While Kawasaki will oversee construction, Alstom will focus on signaling and CTCI will supply the electrical system.[4]

Proposed network

Map of proposed network

Green Line

The Green Line is currently being constructed as an elevated railway with driverless electric trains. It will be about 16.5 km (10.3 mi) long. Original plans included 15 stations and a depot, but because of pressure from the Taichung City Government the station count was increased to 18. It will stretch from Songzhu Road in Beitun District of Taichung along Beitun Road, Wenxin Road, and Wenxin South Road to the High Speed Rail Station in the Wuri District.[5] It is expected to cost NT$53,491,000,000, and will be built by the Taipei City Department of Rapid Transit Systems.[6]

The BRT Blue Line has been completed and began operations in July 2014. It ran between Providence University and Taichung TRA station. However, it was shut down in July 2015, following a year of operation by an executive decision made by Mayor Lin Chia-Lung. Currently it is a designated bus lane for multiple routes. A MRT system running the same route is currently being planned.

The MRT Wuri — Beitun Line (Green Line) is currently under construction as a grade-separated heavy rail line, with test runs anticipated by late 2018 and formal operations by 2020[7]. The line runs between Wuri and Beitun districts, passing through Nantun and Xitun districts. The planned total cost for the project is NT$51.39 billion (including land acquisition costs), which is split between the local and central government.[1]

The LRT Orange line is currently being planned, after several rejections from the Ministry of Transportation and Communications to build a MRT or BRT system.

LineModeTerminuskmTotal kmStatus
 G  Wuri–Wenxin–Beitun Line MRT Beitun Depot - Taichung HSR Station 16.7 26.9Under construction
Changhua Extended Line Taichung HSR Station - Changmei Road10.2Planned
 B  BRT Dajia - Zhonggang Elementary School14.06?Pause planned[8]
Wuqi - Providence University?Planned
Providence University - Taichung TRA station17.3Opened on 28 July 2014
Closed on 8 July 2015[8]
Taichung TRA station - Taiping?Pause planned[8]
Taichung Airport - Shalu4.18Pause planned[8]
MRT Taichung Harbor - Taiping29.529.5Planned
 O  BRT Zhongqing - Provincial Advisory Council2525Cancelled[8]
MRT Taichung Airport - Wufeng29.2729.27Cancelled[8]
LRT Taichung Airport - Wufeng2525Planned[8]

Blue Line

The Taichung City Government cites LRT being five times cheaper to build than MRT, and BRT in turn being five times cheaper than LRT. For this reason, the first MRT line in Taichung is being built as an elevated line (as opposed to underground), and future lines are planned to be built as BRT with the possibility of later upgrading to grade-separated modes of transit. The system began its operation in 2014, between Providence University and the Taichung Railway Station. It ran along the busy Taiwan Boulevard, on a designated lane made specifically for BRT. Bus stations were built on the divider between the fast and slow lanes on the road. It was the first articulated bus system in Taiwan. The service ended on July 8, 2015 due to the new policy announced by Mayor Lin Chia-lung on March 30, 2015. The designated BRT Lane was changed to an ordinary bus lane, allowing other buses that operate primarily on Taiwan Boulevard to use the lane. The articulated buses that originally ran the route became known as bus route 300.

A MRT line running on the same route as the BRT line is currently being planned.

Orange Line

A fourth line was planned in 2009 to connect the city with Taichung Airport. However, after multiple proposals to build a MRT and BRT line were rejected by the Ministry of Transportation and Communications, the city government turned to an LRT system. The system is still being planned.[9]

See also

References

  1. 1 2 "Taichung Metropolitan MRT System Wuri-Wenxin-Beitun Line Construction Project". Department of High Speed Rail, MOTC. Retrieved 2011-01-06.
  2. "Taipei and Taichung signed a contract for the cooperation of the Taichung MRT development project(2007-12-12)". Taichung City Government. 2007-12-12. Retrieved 2011-01-19.
  3. "Taichung MRT System Breaks Ground". China Economics News Service. 2008-10-08. Archived from the original on 2011-07-24. Retrieved 2011-01-19.
  4. 1 2 "Kawasaki Heavy, Others Snag Taiwan Order For Train System". Nikkei. 2011-03-10. Retrieved 2011-03-09.
  5. "Taipei, Taichung City & the Department of Transportation jump start the Taichung MRT". Compass Magazine. December 2008. Retrieved 2011-01-19.
  6. "臺中都會區捷運系統- 烏日文心北屯線暨場、站聯合開發". Department of Rapid Transit Systems. 2008-11-01. Retrieved 2010-06-19.
  7. "Taichung MRT Green Line enters systems integration stage". Taiwan Focus. Retrieved 4 March 2018.
  8. 1 2 3 4 5 6 7 "等了3個月…台中大眾運輸網洗牌". United Daily News. 2015-03-24. Retrieved 2015-04-21.
  9. "林佳龍:捷運橘線被退 才啟動輕軌捷運路網 - 政治 - 自由時報電子報". Retrieved 2016-07-27.
KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.