Delhi–Meerut Regional Rapid Transit System

Delhi–Meerut Regional Rapid Transit System
Overview
Owner National Capital Region Transport Corporation (NCRTC)
Area served
Locale NCR
Transit type Suburban rail
Number of lines 1
Number of stations 16
Website http://ncrtc.in
Technical
System length 82 km (51 mi)
Track gauge 1676 mm [1](1,676 mm (5 ft 6 in) broad gauge)
Electrification Single phase 25 kV, 50 Hz AC through overhead catenary
Average speed 100 km/h (62 mph)
Top speed 160 km/h (99 mph)
System map

Delhi-Meerut RRTS
Sarai Kale Khan
New Ashok Nagar
Anand Vihar
Sahibabad
Ghaziabad
Guldhar
Duhai
Muradnagar
Modi Nagar South
Modi Nagar North
Meerut South
Shatabdi Nagar
Meerut Central
Begumpul
Meerut North
Modipuram

Delhi–Meerut Regional Rapid Transit System (Delhi–Meerut RRTS) is an 82 km long,[2][3] under-development, semi-high speed rail corridor connecting Delhi-Ghaziabad-Meerut. It is one of the three rapid-rail corridors planned under Phase-I of Regional Rapid Transport System (RRTS) project of National Capital Region Transport Corporation (NCRTC). With maximum speed of 160 km/h (99.42 mph), the distance between Delhi and Meerut will be covered in around 62 min (1.03 h).[4] The project will cost 21,902 crore (US$3.1 billion) and is expected to start operations by 2024.[3]

History

Government of Uttar Pradesh approved Delhi-Meerut RRTS on 19 May 2017. It approved the DPR and the proposed project.[5][6] The estimated 82 km long Delhi-Meerut Corridor would be passing through one of the most densely populated sections of the National Capital Region connecting Delhi to Uttar Pradesh.

Introduction

The corridor would be beneficial for the development of the region and help connect the large number of townships and centres of economic activity that are already planned along this corridor.

Length = 82 km

Number of RRTS Stations =16

Number of additional Stations for Meerut MRTS = 6

Route

Of the entire length, 60.35 km (37.50 mi) is elevated, 30.25 km (18.80 mi) is underground[2] and 1.45 km (0.90 mi) will be at grade for connections to two depots that will come up at Duhai, Ghaziabad and Modipuram, Meerut. In densely populated areas of Delhi and Meerut, the route will be underground, including that of the river Yamuna.[3] The entire route is designed for a maximum speed of 180 km/h (111.85 mph) and the operating speed will be 160 km/h (99.42 mph).[7][8] Average speed (including all the stops) will come around 100 km/h (62.14 mph).[8]

The Delhi-Meerut corridor starts from Sarai Kale Khan station in Delhi. The corridor will pass through areas of Delhi, Ghaziabad and Meerut, terminating at Modipuram in Meerut.[2][3]

Sarai Kale Khan will also become a transit hub with the presence of an Sarai Kale Khan ISBT and the Hazrat Nizamuddin railway station in vicinity.[3]

The 38.05 km (23.64 mi) long Sahibabad - Meerut South section, including Duhai Depot, is expected to become operational by January 2023, the 16.60 km (10.31 mi) Sarai Kale Khan - Sahibabad in January 2024 and the remaining 37.40 km (23.24 mi) Meerut South - Modipuram in July 2024.[3]

There will be a total of 16 stations [9]

Delhi Meerut RRTS Stations
No. Station Name Inter-Station Distance(km) Cumulative Distance (km) Travel Time from Delhi (min) Connections Layout Status
English Hindi
1 Sarai Kale Khan सराय काले खाँ 0 0.0 Bus interchange Sarai Kale Khan ISBT Elevated Planned
2 New Ashok Nagar न्यू अशोक नगर 5.6 5.6 Elevated Planned
3 Anand Vihar आनंद विहार 12.9 7.2 Underground Planned
4 Sahibabad साहिबाबाद 18.9 5.7 Elevated Planned
5 Ghaziabad ग़ाज़ियाबाद 23.7 5.1 Elevated Planned
6 Guldhar गुलधर 27.1 3.4 Elevated Planned
7 Duhai दुहै 32.1 5.0 At Grade Planned
8 Murad Nagar मुराद नगर 38.2 6.1 Elevated Planned
9 Modi Nagar South 45.1 6.9 Elevated Planned
10 Modi Nagar North 48.9 3.8 Elevated Planned
11 Meerut South मेरठ दक्षिण 58.2 9.3 Elevated Planned
12 Shatabdi Nagar शताब्दी नगर 63.5 5.3 Underground Planned
13 Meerut Central 67.5 4.0 Underground Planned
14 Begumpul बेगमपुल 70.1 2.6 Underground Planned
15 Meerut North मेरठ उत्तर 76.8 6.7 Elevated Planned
16 Modipuram मोदीपुरम 80.4 3.7 Elevated Planned

See also

References

  1. Feasibility Report: RRTS Delhi-Ghaziabad-Meerut (PDF) (Report). Archived (PDF) from the original on 2016-11-13. Retrieved 2017-10-07.
  2. 1 2 3 "NCRTC | Delhi – Meerut Corridor". ncrtc.in. Retrieved 2017-06-11.
  3. 1 2 3 4 5 6 Reporter, Staff. "Delhi-Meerut rapid rail project gets green light". The Hindu. Retrieved 2017-06-11.
  4. "NCRTC | Project Details". ncrtc.in. Retrieved 2017-06-11.
  5. "NCRTC | Uttar Pradesh Government Approves Delhi-Meerut RRTS". ncrtc.in. Retrieved 2017-06-11.
  6. Agarwal, Kabir (6 May 2017). "Delhi-Meerut rapid rail priority for govt: CM Yogi". The Times of India. Retrieved 8 July 2018.
  7. PTI, Press Trust of India (2016-12-06). "NCRTC approves Delhi-Ghaziabad-Meerut RRTS corridor". India Today. Retrieved 2017-06-12.
  8. 1 2 "NCRTC | RRTS – Background". ncrtc.in. Retrieved 2017-06-12.
  9. "NCRTC|Delhi-Meerut Corridor". ncrtc.in.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.