Guangzhou–Dongguan–Shenzhen intercity railway

Guangzhou–Dongguan–Shenzhen
intercity railway
Overview
Native name 穗莞深城际轨道交通
穗莞深线
Type High-speed rail
Status Under Construction
Locale People's Republic of China
Termini Guangzhou East
Airport
Stations 18
Operation
Operator(s) China Railway High-speed
Technical
Line length 87 km (54 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 50Hz 25,000V
Operating speed 160 km/h (99 mph)
Guangzhou-Dongguan-Shenzhen ICR route map
Guangzhou-Shenzhen Railway
to Guangzhou railway station
Guangzhou East
Shipai
Jinshan
Future Railway Connection
to Guangzhou Baiyun Airport and Guangzhou North
Xintang railway station
Guangzhou-Shenzhen Railway
to Shenzhen
Zhongtang
Wangniudun
Foshan-Dongguang ICR
to Guangzhou South
Wanghong
Dongguan–Huizhou ICR
to Huizhou
Hongmei
Dong River
Shatian
Houjie
Guangzhou-Shenzhen-Hong Kong XRL
to Guangzhou South and West Kowloon Terminus
Humen
Humen Nanmaocheng
Chang'an Shabian
Chang'an Jinsha
Haishang Tianyuan
Heping
Shenzhen-Maoming HSR
to Maoming East and Shenzhen North
Airport North (Jichang Bei)
Airport (Jichang)
Possible extension beside Shenzhen Metro Line 11
to Futian

Guangzhou–Dongguan–Shenzhen intercity railway, also known as Guangzhou–Shenzhen intercity railway, is a commuter railway in the Pearl River Delta of Guangdong, China. The construction route traces roughly along the east bank of the Pearl River,[1] connecting Guangzhou, Dongguan and Shenzhen Bao'an International Airport. It will feature a length of about 87 km,[2] operating at a top speed of 140 kilometers per hour using CRH6S EMU trains.[3]

History

Route planning in 2009 within Guangzhou changed several times and then a big change, with Xintang in Guangzhou's Zengcheng District chosen as the originating point, straight into Hongmei, Dongguan. This changed the access to the Guangzhou Metro to Line 13, with future access to the planned Line 16.[4][5] Guangzhou–Dongguan–Shenzhen intercity railway originally planned to through operate into Shenzhen Metro's Line 11 to Futian Station in central Shenzhen.[6] However, in September 2010, it was announced that this railway will no longer enter into the Shenzhen city center and designed as a separate railway service. Despite this, reservations parallel to Line 11 for extending services into Shenzhen's Futian station at some point in the future still exist.[7][8]

Chronology

  • 21 December 2008 - Construction started.[9]
  • 25 November 2009 - Dongguan-Changan segment started[10]
  • 6 June 2012 - Deletion of Mayong station from plans.[2]
  • 21 September 2012 - Dongguan-Shenzhen section started.[11]
  • 17 October 2012 - Planning extends to Guangzhou East railway station, with renovating and running alongside the Guangzhou-Shenzhen Railway corridor[12] and the transformation of Jishan and Shipai stations will be upgraded for intercity use.
  • 6 December 2012 - Shenzhen route basically established, with two sites in Shenzhen: Airport East Station and Qianhaiwan Station.[13]
  • 14 May 2013 - Shenzhen section of the railway adjusted again, terminating at Airport Station, cancelling this line running to Airport East and Qianhaiwan stations.[14]

Station List

Station Name Chinese Distance
km
PRD MIR (CR C-train)
transfers/connections
Metro
transfers/connections
Location
Guangzhou North (Guangzhoubei) 广州北 0.00 0.00  GFC   GQ  Guangzhou Metro  9 
Tiangui Lu 天贵路  GFC   GQ 
Guangzhou Airport Terminal 2 白云机场T2 20.85  GFC   GQ  Guangzhou Metro  3 
Guangzhou Airport Terminal 1 白云机场T1 0.96  GFC   GQ  Guangzhou Metro  3 
Guangzhou Airport Terminal 3 白云机场T3 3.36  GFC 
Zhuliao 竹料  GFC  Guangzhou Metro  14 
Health Industry Park 健康产业城
Matouzhuang 马头庄 Guangzhou Metro  14  via Xinnan
Fulangcun 佛塱村
Pinggang 平岗
Zhenlong 镇龙 Guangzhou Metro  14   21 
Lihucheng 荔湖城
Zengcheng Development Zone 增城开发区
(Xintang Junction)
Through-service via Guangshen railway to/from Guangzhou East
Xintang 新塘 Guangzhou Metro  13 
Zhongtang 中堂 5.54
Wangniudun 望牛墩 5.37
Dongguan West (Dongguanxi) 东莞西 3.49  GH   FG 
Hongmei 洪梅 3.25
Shatian 沙田 8.59
Houjie 厚街 5.15
Humen 虎门 5.34  GSH  Dongguan Rail Transit  2 
Humen Business Park 虎门商贸城 4.08
Chang'an Xiabian 长安厦边 6.75
Chang'an Jinsha 长安金沙 3.75
Haishang Tianyuan 海上田园 8.28
Heping 和平 4.93
Shenzhen Airport North 深圳机场北 4.43 Shenzhen Metro  11 
Shenzhen Airport 深圳机场 3.82 Shenzhen Metro  11 
Qianhaiwan 前海湾  SH   SZ  Shenzhen Metro  1   5   11 

Future development

It is planned in the future to extend this railway further north eventually extending to Guangzhou Baiyun Airport and Guangzhou North railway station. A Sino-French joint venture is pursuing this option. Construction is expected to start in August 10, 2012, with an opening in 2015.

There are possible links too with the proposed Hong Kong–Shenzhen Western Express Railway, allowing for cross-border services and an eventual rail link between Hong Kong Airport with Shenzhen Airport and Guangzhou Airport.

There is also the option to make use of the rail reservation alongside Shenzhen Metro's Line 11 into central Shenzhen at Futian station.

References

  1. 附件F,香港立法會 交通事務委員會鐵路事宜小組委員會,二零零七年一月五日. "北環線和廣深港高速鐵路香港段資料文件]" (PDF). 珠三角城際快速軌道RTS(廣州至深圳段)最高時速 Max. Speed 140 km/h
  2. 1 2 "穗莞深城际轨道减了一个站". June 6, 2012.
  3. "穗莞深城轨东莞境内设10站". June 7, 2012.
  4. "增城区新塘镇被改成穗莞深城轨地铁的起点". Archived from the original on July 15, 2009.
  5. "新塘将交汇三轨道线穗莞深城轨全程一个钟". May 7, 2009.
  6. "远期轨道交通线网方案". 深圳市規劃局. Archived from the original on May 28, 2010.
  7. "穗莞深城轨2015年建成 共设15车站深圳占4个". June 7, 2012.
  8. "穗莞深城际2015年建成 全线设立15个站点". June 7, 2012.
  9. "穗莞深城际轨道干线在深圳开工". December 22, 2008.
  10. "穗莞深城際軌道長安段動工 8社區設3個站". November 25, 2009.
  11. "穗莞深城轨莞深段已动工 广州到深圳只需20元". September 21, 2012. Archived from the original on January 9, 2015.
  12. "穗莞深将连通到广州东站". October 17, 2012.
  13. "福田至九龙乘高铁仅14分钟". December 6, 2012.
  14. "穗莞深城轨莞深段再调:站点少两个投资多16.29亿元". 南方都市报. April 18, 2013. Archived from the original on June 30, 2013. Retrieved May 14, 2013.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.