Guangzhou–Dongguan–Shenzhen intercity railway
Guangzhou–Dongguan–Shenzhen intercity railway | |
---|---|
| |
Overview | |
Native name |
穗莞深城际轨道交通 穗莞深线 |
Type | High-speed rail |
Status | Under Construction |
Locale | People's Republic of China |
Termini |
Guangzhou East Airport |
Stations | 18 |
Operation | |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 87 km (54 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Electrification | 50Hz 25,000V |
Operating speed | 160 km/h (99 mph) |
Guangzhou-Dongguan-Shenzhen ICR route map | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Guangzhou–Dongguan–Shenzhen intercity railway, also known as Guangzhou–Shenzhen intercity railway, is a commuter railway in the Pearl River Delta of Guangdong, China. The construction route traces roughly along the east bank of the Pearl River,[1] connecting Guangzhou, Dongguan and Shenzhen Bao'an International Airport. It will feature a length of about 87 km,[2] operating at a top speed of 140 kilometers per hour using CRH6S EMU trains.[3]
History
Route planning in 2009 within Guangzhou changed several times and then a big change, with Xintang in Guangzhou's Zengcheng District chosen as the originating point, straight into Hongmei, Dongguan. This changed the access to the Guangzhou Metro to Line 13, with future access to the planned Line 16.[4][5] Guangzhou–Dongguan–Shenzhen intercity railway originally planned to through operate into Shenzhen Metro's Line 11 to Futian Station in central Shenzhen.[6] However, in September 2010, it was announced that this railway will no longer enter into the Shenzhen city center and designed as a separate railway service. Despite this, reservations parallel to Line 11 for extending services into Shenzhen's Futian station at some point in the future still exist.[7][8]
Chronology
- 21 December 2008 - Construction started.[9]
- 25 November 2009 - Dongguan-Changan segment started[10]
- 6 June 2012 - Deletion of Mayong station from plans.[2]
- 21 September 2012 - Dongguan-Shenzhen section started.[11]
- 17 October 2012 - Planning extends to Guangzhou East railway station, with renovating and running alongside the Guangzhou-Shenzhen Railway corridor[12] and the transformation of Jishan and Shipai stations will be upgraded for intercity use.
- 6 December 2012 - Shenzhen route basically established, with two sites in Shenzhen: Airport East Station and Qianhaiwan Station.[13]
- 14 May 2013 - Shenzhen section of the railway adjusted again, terminating at Airport Station, cancelling this line running to Airport East and Qianhaiwan stations.[14]
Station List
- Share tracks with Guangfo Circular intercity railway from Guangzhou North to Zhuliao.
- Share tracks with Guangqing intercity railway from Guangzhou North to Guangzhou Airport Terminal 1.
Station Name | Chinese | Distance km |
PRD MIR (CR C-train) transfers/connections |
Metro transfers/connections |
Location | |
---|---|---|---|---|---|---|
Guangzhou North (Guangzhoubei) | 广州北 | 0.00 | 0.00 | GFC GQ | ||
Tiangui Lu | 天贵路 | GFC GQ | ||||
Guangzhou Airport Terminal 2 | 白云机场T2 | 20.85 | GFC GQ | |||
Guangzhou Airport Terminal 1 | 白云机场T1 | 0.96 | GFC GQ | |||
Guangzhou Airport Terminal 3 | 白云机场T3 | 3.36 | GFC | |||
Zhuliao | 竹料 | GFC | ||||
Health Industry Park | 健康产业城 | |||||
Matouzhuang | 马头庄 | |||||
Fulangcun | 佛塱村 | |||||
Pinggang | 平岗 | |||||
Zhenlong | 镇龙 | |||||
Lihucheng | 荔湖城 | |||||
Zengcheng Development Zone | 增城开发区 | |||||
(Xintang Junction) | ||||||
↰ Through-service via Guangshen railway to/from Guangzhou East ↰ | ||||||
Xintang | 新塘 | |||||
Zhongtang | 中堂 | 5.54 | ||||
Wangniudun | 望牛墩 | 5.37 | ||||
Dongguan West (Dongguanxi) | 东莞西 | 3.49 | GH FG | |||
Hongmei | 洪梅 | 3.25 | ||||
Shatian | 沙田 | 8.59 | ||||
Houjie | 厚街 | 5.15 | ||||
Humen | 虎门 | 5.34 | GSH | |||
Humen Business Park | 虎门商贸城 | 4.08 | ||||
Chang'an Xiabian | 长安厦边 | 6.75 | ||||
Chang'an Jinsha | 长安金沙 | 3.75 | ||||
Haishang Tianyuan | 海上田园 | 8.28 | ||||
Heping | 和平 | 4.93 | ||||
Shenzhen Airport North | 深圳机场北 | 4.43 | ||||
Shenzhen Airport | 深圳机场 | 3.82 | ||||
Qianhaiwan | 前海湾 | SH SZ | ||||
Future development
It is planned in the future to extend this railway further north eventually extending to Guangzhou Baiyun Airport and Guangzhou North railway station. A Sino-French joint venture is pursuing this option. Construction is expected to start in August 10, 2012, with an opening in 2015.
There are possible links too with the proposed Hong Kong–Shenzhen Western Express Railway, allowing for cross-border services and an eventual rail link between Hong Kong Airport with Shenzhen Airport and Guangzhou Airport.
There is also the option to make use of the rail reservation alongside Shenzhen Metro's Line 11 into central Shenzhen at Futian station.
References
- ↑ 附件F,香港立法會 交通事務委員會鐵路事宜小組委員會,二零零七年一月五日. "北環線和廣深港高速鐵路香港段資料文件]" (PDF).
珠三角城際快速軌道RTS(廣州至深圳段)最高時速 Max. Speed 140 km/h
- 1 2 "穗莞深城际轨道减了一个站". June 6, 2012.
- ↑ "穗莞深城轨东莞境内设10站". June 7, 2012.
- ↑ "增城区新塘镇被改成穗莞深城轨地铁的起点". Archived from the original on July 15, 2009.
- ↑ "新塘将交汇三轨道线穗莞深城轨全程一个钟". May 7, 2009.
- ↑ "远期轨道交通线网方案". 深圳市規劃局. Archived from the original on May 28, 2010.
- ↑ "穗莞深城轨2015年建成 共设15车站深圳占4个". June 7, 2012.
- ↑ "穗莞深城际2015年建成 全线设立15个站点". June 7, 2012.
- ↑ "穗莞深城际轨道干线在深圳开工". December 22, 2008.
- ↑ "穗莞深城際軌道長安段動工 8社區設3個站". November 25, 2009.
- ↑ "穗莞深城轨莞深段已动工 广州到深圳只需20元". September 21, 2012. Archived from the original on January 9, 2015.
- ↑ "穗莞深将连通到广州东站". October 17, 2012.
- ↑ "福田至九龙乘高铁仅14分钟". December 6, 2012.
- ↑ "穗莞深城轨莞深段再调:站点少两个投资多16.29亿元". 南方都市报. April 18, 2013. Archived from the original on June 30, 2013. Retrieved May 14, 2013.