List of high-speed railway lines in China

Railway network map with conventional lines upgraded or built to accommodate CRH shown in orange, 160–250 km/h (99–155 mph), secondary high-speed lines in green, 200–299 km/h (124–186 mph), and blue, above 300 km/h (190 mph).
Projected HSR network in China by 2020 and travel time by rail from Beijing to provincial capitals.

China's high-speed railway network is by far the longest in the world. As of 2016 it extends to 29 of the country's 33 provincial-level administrative divisions and exceeds 22,000 km (14,000 mi) in total length, accounting for about two-thirds of the world's high-speed rail tracks in commercial service.[1][2][3] Over the past decade, China’s high-speed rail network grew rapidly according to ambitious railway plans issued by the State. The "Mid- to Long-Term Railway Network Plan" ("Railway Network Plan") approved by the State Council in 2004 called for 12,000 km (7,456 mi) of passenger-dedicated HSR lines running train at speeds of at least 200 km/h (124 mph) by 2020.[4] The 2008 Revisions to the Railway Network Plan increased the year 2020 passenger-dedicated HSR network target length to 16,000 km (9,942 mi) and removed the 200 km/h speed standard to allow new lines to be built to standards that can accommodate faster trains.[5]

Overview

In 2008, the Ministry of Railways announced plans to build 25,000 km (16,000 mi) of high-speed railways with trains reaching normal speeds of 350 km/h.[6][7] China invested $50 billion on its high-speed rail system in 2009 and the total construction cost of the high-speed rail system is $300 billion.[6] The main operator of regular high-speed train services is China Railway High-Speed (CRH).

China's conventional high-speed railway network is made up of four components:

  1. a national grid of mostly passenger dedicated HSR lines (PDLs),
  2. other regional HSRs connecting major cities,
  3. certain regional "intercity" HSR lines, and
  4. other newly built or upgraded conventional rail lines, mostly in western China, that can carry high-speed passenger and freight trains.

National High Speed Rail Grid

"Four Vertical and Four Horizontal" network

Map showing the 4+4 national HSR grid

The centerpiece of the MOR's expansion into high-speed rail is a national high-speed rail grid that is overlaid onto the existing railway network. The 2004 Railway Network Plan called for four lines running north-south (verticals) and four lines running east-west (horizontals) by the year 2020 that would connect population centers in economically developed regions of the country.[8] The 2008 Revisions to the Railway Network Plan extended the length of the Beijing-Shenzhen HSR to Hong Kong and the Shanghai-Changsha HSR to Kunming.[5] Each line in the 4+4 national HSR grid is over 1,400 km in length, except the Qingdao-Taiyuan Line which is 873 km in length. Apart from the Hangzhou–Shenzhen HSR (Ningbo-Shenzhen section) and Shanghai–Chengdu HSR (Nanjing-Chengdu section), which were the first railways to connect those cities and carry both passenger and freight, the other six lines are all passenger-dedicated lines. With the exception of the Yichang-Chengdu section of the Shanghai-Chengdu HSR with speed limits of 200 km/h (120 mph), all other lines in the 4+4 national grid were built to accommodate trains at speeds of 250–350 km/h (160–220 mph).

     Completed lines      Partially completed lines.

Four North-South HSR corridors and constituent lines

Four East-West HSR corridors and constituent lines

"Eight Vertical and Eight Horizontal" network

Map of "Eight Vertical and Eight Horizontal" high-speed railway network (in Chinese)

In 2016, the National Development and Reform Commission (NDRC) announced the plans to extend the almost completed "Four Vertical and Four Horizontal" network to a new "Eight Vertical and Eight Horizontal" network.[38] The new network comprises eight north-south ("vertical") corridors and eight east-west ("horizontal") ones, almost doubling the route length.[38]

A passageway may consist of two or more parallel lines that take different routes between the same cities, branch and connector lines, and in some cases, connecting lines and lower-speed lines.[39] The Beijing-Shanghai HSR Passageway, one of the verticals, comprises the preexisting Beijing-Shanghai HSR, which runs through Tianjin, Jinan, Bengbu, Nanjing, Wuxi and Suzhou, as well as a new high-speed passenger dedicated line from Beijing to Shanghai via Tianjin, Dongying, Weifang, Linyi, Huaian, Yangzhou, and Nantong, as well as HSRs connecting Nanjing, Hefei and Shanghai with Hangzhou.[40] Some passageways consist of a single HSR line; the Shanghai-Kunming HSR Passageway, one of the horizontals, is essentially the Shanghai–Kunming High-Speed Railway by another name.[41]

The national HSR mainlines in the 8+8 passageway grid are generally electrified, double-tracked, passenger-dedicated HSR lines built to accommodate train speeds of 250–350 km/h, but passageways also make use of intercity and regional HSR lines with speeds of 200 km/h as well as certain regular speed railways. The Qingdao-Yinchuan Passageway includes the Taiyuan–Zhongwei–Yinchuan Railway, which is partially single-track with speeds of only 160 km/h.[42]

Eight vertical lines
No. Line Passing Cities Changes from 4+4 Network
1 Coastal passageway
(沿海通道)
Dalian (Dandong)-Qinhuangdao-Tianjin-Dongying-Weifang-Qingdao (Yantai)-Lianyungang-Yancheng-Nantong-Shanghai-Ningbo-Fuzhou-Xiamen-Shenzhen-Zhanjiang-Beihai (Fangchenggang) Extensions of Hangzhou–Fuzhou–Shenzhen High-Speed Railway; north from Hangzhou to Dalian/Dandong, and south from Shenzhen to Fangchenggang.
2 Beijing–Shanghai passageway
(京沪通道)
Beijing, Tianjin, Jinan, Nanjing, Shanghai (Hangzhou) Incorporates all of Beijing–Shanghai High-Speed Railway and other parallel line sections connecting Beijing and Shanghai.
3 Beijing–Hong Kong (Taipei) passageway
(京港(台)通道)
Beijing-Hengshui-Heze-Shangqiu-Fuyang-Hefei (Huanggang)-Jiujiang-Nanchang-Ganzhou-Shenzhen-Hong Kong (Kowloon) New line.
4 Beijing–Harbin, Beijing–Hong Kong (Macau) passageway
(京哈~京港澳通道)
Harbin-Changchun-Shenyang-Beijing-Shijiazhuang-Zhengzhou-Wuhan-Changsha-Guangzhou-Shenzhen-Hong Kong, and Guangzhou-Zhuhai-Macau. Merger of Beijing–Harbin High-Speed Railway and Beijing–Guangzhou–Shenzhen–Hong Kong High-Speed Railway, with a branch line to Macau.
5 Hohhot–Nanning passageway
(呼南通道)
Hohhot-Taiyuan- Zhengzhou-Xiangyang-Changde-Yiyang-Shaoyang-Yongzhou-Guilin-Nanning. New line
6 Beijing–Kunming passageway
(京昆通道)
Beijing-Shijiazhuang-Taiyuan-Xi'an-Chengdu (Chongqing)-Kunming, including Beijing-Taiyuan-Zhangjiakou-Datong. New line
7 Baotou (Yinchuan)–Hainan passageway
(包(银)海通道)
Baotou-Yan'an-Xi'an-Chongqing-Guiyang-Nanning-Zhanjiang-Haikou (Sanya). New line
8 Lanzhou (Xining)–Guangzhou passageway
(兰(西)广通道)
Lanzhou (Xining), Chengdu (Chongqing), Guiyang, Guangzhou. New line
Eight horizontal lines
No. Line Passing Cities Changes from 4+4 Network
9 Suifenhe–Manzhouli passageway
(绥满通道)
Suifenhe, Mudanjiang, Harbin, Qiqihar, Hailar, Manzhouli. New line
10 Beijing–Lanzhou passageway
(京兰通道)
Beijing, Hohhot, Yinchuan, Lanzhou. New line
11 Qingdao–Yinchuan passageway
(青银通道)
Qingdao, Jinan, Shijiazhuang, Taiyuan, Yinchuan. West extension of Qingdao–Taiyuan high-speed railway from Taiyuan to Yinchuan.
12 Eurasia Continental Bridge passageway
(陆桥通道)
Lianyungang, Xuzhou, Zhengzhou, Xi'an, Lanzhou, Xining, Urumqi. Extensions of Xuzhou–Lanzhou high-speed railway; east from Xuzhou to Lianyungang, and west from Lanzhou to Urumqi.
13 Yangtze River passageway
(沿江通道)
Shanghai-Nanjing-Hefei-Wuhan-Chongqing-Chengdu, including Nanjing-Anqing-Jiujiang-Wuhan-Yichang-Chongqing, and Wanzhou-Dazhou-Suining-Chengdu. Incorporates all of Shanghai–Wuhan–Chengdu high-speed railway and other parallel line sections connecting Shanghai and Chengdu.
14 Shanghai–Kunming passageway
(沪昆通道)
Shanghai, Hangzhou, Nanchang, Changsha, Guiyang, Kunming. Route is identical to the Shanghai–Kunming high-speed railway.
15 Xiamen–Chongqing passageway
(厦渝通道)
Xiamen, Longyan, Ganzhou, Changsha, Changde, Zhangjiajie, Qianjiang, Chongqing. New line
16 Guangzhou–Kunming passageway
(广昆通道)
Guangzhou, Nanning, Kunming. New line

Other Regional high-speed rail lines

Regional high-speed rail lines connect major cities and national HSR lines and are built to accommodate train speeds of up to 200–350 km/h (120–220 mph). According to the "Mid-to-Long Term Railway Network Plan" (revised in 2008), the MOR plans to build over 40,000 km (25,000 mi) of railway in order to expand the railway network in western China and to fill gaps in the networks of eastern and central China. The 2008 Revisions to Railway Network Plan listed regional railways in Jiangxi, Sichuan and the Northeast.[43] The 2016 Revision lays out 10 new regional railways in eastern China, four in the Northeast, seven in central China, and five in western China.[41] These are also considered high-speed rail though they are not part of the national HSR grid or Intercity High Speed Rail. However several HSR lines planned and built as a regional high-speed railway under the 2008 Revisions have since been incorporated into the 8+8 national grid.

     Completed lines      Partially completed lines. Click [show] for details.

Line Name Route Description Designed
Speed
(km/h)

Length
(km)

Construction
Start Date

Open Date
Datong–Zhangjiakou HSR from Datong to Zhangjiakou 250 137 2015-12 2019[49]
Xi'an–Chengdu HSR from Xi'an to Chengdu via Hanzhong and Guangyuan. 250 510 2012-10-27 2017-12-6[50]
Chongqing–Guiyang HSR from Chongqing to Guiyang. 200 345 2010-12-22 2018-01-25[51]
Jilin–Hunchun HSR linking Jilin and Hunchun 250 359 2010[52] 2015-09-20[53]
Shangqiu–Hefei–Hangzhou HSR linking Shangqiu, Hefei and Hangzhou 350 770 2014[54] 2020[55]
Zhengzhou–Wanzhou HSR linking Zhengzhou, Xiangyang, Badong and Wanzhou - 770 2015[56] 2020
Meizhou–Chaozhou-Shantou HSR linking Meizhou, Chaozhou and Shantou 250 120 2014[57] 2017
Lianyungang–Huai’an–Yangzhou–Zhenjiang HSR linking Lianyungang, Huai'an, Yangzhou and Zhenjiang 250 305 2014-12-26[58]  2019
Map showing some of China's intercity railways, including lines already operational (red) and lines under construction.

High-speed intercity railways

Intercity lines with speeds ranging from 200–350 km/h (120–220 mph) are designed to provide regional high-speed rail service between large cities and metropolitan areas that are generally within the same province. They are built with the approval of the central government but are financed and operated largely by local governments with limited investment and oversight from the China Rail Corporation. Some intercity lines run parallel to national grid high-speed rail lines but serve more stations along the route.

The 2004 Railway Network Plan arranged for intercity lines around the Bohai Rim, Yangtze and Pearl River Deltas.[59] The 2008 Revision to the Railway Network Plan designated Changsha, Wuhan, Zhengzhou, Chengdu, Chongqing, Xian and coastal Fujian metropolitan areas for intercity rail development.[43] The 2016 Revision to the Railway Network Plan identifies the Shandong Peninsula, coastal Guangxi, Harbin-Changchun, southern Liaoning, central Yunnan, central Guizhou, the northern slopes of Tian Shan, Yinchuan, Hohhot-Baotou-Ordos-Yulin as additional metro regions for intercity rail.[60]

Operational lines are marked with green background.

Line Design Speed
(km/h)
Length
(km)
Construction Start Date Open Date
Beijing–Tianjin Intercity Railway3501152005-04-072008-08-01
Chengdu–Dujiangyan Intercity Railway22065
(mainline)
2008-11-042010-05-12
20021
(Pengzhou branch)
2009-09-27[61]2014-04-30[62]
Shanghai–Nanjing Intercity Railway3503012008-07-012010-07-01
Nanchang–Jiujiang Intercity Railway2501312007-06-282010-09-20
Hainan Eastern Ring Railway2503082007-09-292010-12-30
Changchun–Jilin Intercity Railway2501112007-05-132010-12-30[63]
Pearl River Delta Rapid Transit| 200117
Guangzhou–Zhuhai
2005-12-182011-01-07[64]
2012-12-31[65]
27
Xinhui branch
2011-01-07[64]
85
Guangzhou–Zhaoqing
2009-09-29[66]2016-03-30[67]
97
Dongguan–Huizhou
2009-05-08[68]2016-03-30[69]
200 38
Guangzhou–Qingyuan
2012-11-22[70]2017[71]
Nanjing–Hangzhou Intercity Railway3502512008-12-282013-07-01[23]
Hengyang–Liuzhou Intercity Railway25049720092013-12-28
Liuzhou–Nanning Intercity Railway2502232008-12-272013-12-28[47]
Wuhan Metropolitan Area Intercity Railway25090
Wuchang–Xianning[72]
2009-03-222013-12-28[73]
97
Wuhan–Huangshi
2014-06-18[74]
66
Wuhan–Huanggang
2014-06-18[74]
198

Wuhan–Jiujiang

20162017-09-21[75]
20061
Hankou–Xiaogan
2009-03-222016-12-01[76]
200438
Wuhan-Shiyan
20152020[77]
Jiangyou–Mianyang–Chengdu–Leshan Intercity Railway2003142008-12-302014-12-20[78][79]
Chengdu–Pujiang Intercity Railway200992010-10-16[80]2018[81]
Central Plain Metropolitan Intercity Rail20050
Zhengzhou–Kaifeng
2009-12-29[82]2014-12-28[83]
69
Zhengzhou–Jiaozuo
2015-06-26[84]
101
Zhengzhou–Xuchang
2009-12-29[82]2015-12-31[85]
Changsha–Zhuzhou–Xiangtan Intercity Railway200962010-07-022016-12-26[86]
Nanjing–Anqing Intercity Railway2502572008-12-282015-07[87][88]
Harbin–Qiqihar Intercity Railway2502862008-11-252015[89]
Qingdao–Rongcheng Intercity Railway2502992010-10-10[90]2014-12-28[90]
Guiyang–Kaiyang Intercity Railway200622010-09-20[91]2015-05-01[92]
Jinhua-Wenzhou High Speed Railway25018820112015-12-26[93]
Chengdu–Chongqing Intercity Railway30030520092015[94][95]
Shenyang–Dandong Intercity Railway3502082010-03-17[96]2015[97]
Dandong–Dalian Intercity Railway2002962010-03-17[96]2015[98][99]
Chongqing–Wanzhou Intercity Railway35025020092016-11-28[100][101][102]
Hainan Western Ring Railway2503422012-102015[103]
Wuhan–Jiujiang Passenger Railway2501012013-12-29[104]2017-09-21[105]
Tianjin–Baoding 250 158 2011-03-18 2015-12-28[106]
Beijing–Tangshan Intercity Railway35016020092020[107]
Hangzhou–Huangshan Intercity Railway2502652014-06-30[108]2018
Harbin–Jiamusi Intercity Railway2003432014-06-30[109]2018-09-30[110]
Harbin–Mudanjiang Intercity Railway2502932014-12-15[111]2019[112]

Upgraded conventional railways

Several existing railway lines have been upgraded to double-track, electrified rail lines to accommodate high-speed trains. As of 2007, more than 6000km of track have been upgraded to accommodate trains running at speeds of 200km/h, and 846km of track have been upgraded to accommodate trains running at speeds of 250km/h. These trains are designed to carry both passenger and freight traffic. The Railway Network Plan released in 2008 identified 19,000km of existing railway lines requiring an additional track and 25,000km of railway lines requiring electrification[113]. Many of these lines or sections thereof have since been incorporated into the 8+8 national HSR grid announced in 2016.

Line Design
Speed
(km/h)
Length
(km)
Construction
Start Date
Open Date Ref
Guangzhou–Shenzhen Railway2001472005-12-312007-04-18
Longyan–Xiamen Railway2001712006-12-252012-06-29[114]
Xiangtang–Putian Railway2006352007-11-232013-09-26[115]
Ganzhou–Longyan Railway2002742009-12-292015-12-25[116]
Chongqing–Lanzhou Railway2008322008-09-262017-09-29[117]
Nanping-Sanming-Longyan Railway2502472010-12-252017[118]
Chengdu–Lanzhou Railway2007302011-02-262019[119]
Jiujiang–Quzhou Railway2003332013-12-292017[120][104]
Shanghai–Nantong Railway2001372014-03-012018[121]
Fuzhou–Pingtan Railway35088.42013-10-312019[122]
Qianjiang–Zhangjiajie–Changde Railway2003402014-12-292019[123]
Qingdao-Lianyungang Railway200194.52014-12-292018[124]

References

  1. (Chinese) 全国高铁运营里程已超过2.2万公里 2017-01-03
  2. "Chinese high speed network to double in latest master plan". Railway Gazette. 21 July 2016.
  3. "China to start construction on 35 railway projects: report". Xinhua. February 19, 2017.
  4. (Chinese) 2004年国家《中长期铁路网规划》内容简介 2014-05-27; accessed 2017-07-16
  5. 1 2 National Development and Reform Commission 2008, p. 2.
  6. 1 2 China's amazing new bullet train CNN Money August 6, 2009
  7. China starts work on Beijing-Shanghai express railway Xinhua 2008-04-18
  8. (Chinese) 2004年国家《中长期铁路网规划》内容简介 2014-05-27; accessed 2017-07-16
  9. "Work starts on Beijing-Shenyang high-speed railway". People's Daily Online. 2014-03-03. Retrieved 2014-04-17.
  10. "Construction begun on new Beijing-Shenyang line". china.org.cn. 2014-03-10. Retrieved 2014-09-04.
  11. "World's fastest railway in frigid regions starts operation". English.news.cn. 2012-12-01. Retrieved 2012-12-01.
  12. "盘锦至营口高速铁路运营 大连到北京6小时". 人民网. 2013-09-12. Retrieved 2013-09-18.
  13. Zha, Minjie (2011-06-23). "Beijing-Shanghai high speed rail to be launched June 30". Shanghai Daily. Retrieved 2011-06-25.
  14. "China launches new high-speed railway". People's Daily Online. 2012-10-17. Retrieved 2012-11-02.
  15. 1 2 "Beijing - Guangzhou high speed line completed". Railway Gazette. 2012-12-26. Retrieved 2012-12-28.
  16. "New high-speed railway spurs debate over prices". People's Daily Online. 2012-09-27. Retrieved 2012-09-27.
  17. "Guangzhou south railway station to open on Jan. 30". Newsgd.com. 2010-01-05. Retrieved 2013-10-08.
  18. Lu, Yanan; Zeng, Yong (2011-12-26). "Guangzhou-Shenzhen high-speed railway opens". People's Daily Online. Retrieved 2011-12-26.
  19. "Asia's largest underground railway station opens for business". SmartRail World. 2016-01-05. Retrieved 2016-01-29.
  20. "Guangzhou-Shenzhen-Hong Kong Express Rail Link Opens To Public". Headlines Today. Retrieved 23 September 2018.
  21. "Luggage and ticket confusion as Hong Kong's high-speed rail service to mainland China opens". South China Morning Post. 2018-09-23. Retrieved 2018-09-23.
  22. "Railway Bridge to Cross Hangzhou Bay". HighBeam Business.
  23. 1 2 "New high-speed railways open to promote intercity development". Xinhua. 2013-07-01. Retrieved 2013-07-02.
  24. "Xiamen-Shenzhen High Speed Railway opens to traffic". China Daily. 2013-12-28. Retrieved 2013-12-29.
  25. "石家庄至济南铁路客运专线正式开工建设". 央广网新闻. 2014-03-17. Retrieved 2013-07-09.
  26. "郑徐高铁"超计划"动工 郑州将成"米"型高铁枢纽". 中国新闻网. 2012-12-26. Retrieved 2012-12-31.
  27. 1 2 "China's railways mileage tops 100,000 km". People's Daily. 2013-12-28. Retrieved 2013-12-29.
  28. 宝鸡至兰州铁路客运专线建设项目启动, Xinhua, 2012-10-21
  29. 宝鸡至兰州客运专线陕西段工程开工建设, 2012-10-21
  30. 宝鸡至兰州的客运专线昨天在榆中奠基, 2012-10-27
  31. "China's Baoji-Lanzhou high speed rail now in operation". CGTN. 2017-07-09. Retrieved 2017-07-09.
  32. "Yiwan Railway: a project with 253 bridges and 159 tunnels". Xinhua. 2010-12-23. Archived from the original on 2011-01-03. Retrieved 2010-12-23.
  33. "杭长铁路客运专线浙江段电气化接触网全线贯通". Xinhua. 2014-05-29. Archived from the original on 2014-09-04. Retrieved 2014-09-04.
  34. (Chinese) "沪昆高铁南昌至杭州段正式开通运营" Xinhua Archived 2016-01-19 at the Wayback Machine. 2014-12-10
  35. "Nanchang-Changsha high speed railway starts operation". People's Daily Online. 2014-09-16. Retrieved 2014-09-16.
  36. "沪昆高铁长怀段12月16日通车 邵阳北站各项准备工作完成". 人民网. 2015-06-18. Retrieved 2015-06-18.
  37. "Shanghai-Kunming line section starts operation". China.org.cn. Retrieved December 28, 2016.
  38. 1 2 "30,000-kilometer high-speed railway to cover 80% of urban areas by 2020". People's Daily Online. July 21, 2016.
  39. National Development and Reform Commission 2016, pp. 7-10.
  40. National Development and Reform Commission 2016, p. 8.
  41. 1 2 National Development and Reform Commission 2016, p. 10.
  42. National Development and Reform Commission 2016, p. 9.
  43. 1 2 National Development and Reform Commission 2008, p. 3.
  44. "New high-speed railway starts operation in north China". Xinhuanet. 2013-12-01. Archived from the original on 2013-12-08. Retrieved 2013-12-01.
  45. "News in Brief". Railway Gazette International. 2011-12-04. Retrieved 2012-01-11.
  46. "High Speed Railway Promotes the Urban Integration of 4 Cities in Guangxi Beibu Gulf Economic Zone". China-ASEAN Online. 2012-07-02. Archived from the original on 2012-12-12. Retrieved 2012-10-23.
  47. 1 2 3 4 "铁路总公司:12月28日中国多条铁路将开通运营". 新华网. 2013-12-26. Archived from the original on 2014-01-05. Retrieved 2013-12-29.
  48. "Taiyuan – Xi'an high speed line opens". Railway Gazette. 2014-07-03. Retrieved 2014-07-08.
  49. "Construction of Datong-Zhangjiakou railway in full swing". english.visitbeijing.com.cn. Retrieved 2017-12-09.
  50. "High-speed railway links major west China cities - Xinhua | English.news.cn". news.xinhuanet.com. Retrieved 2017-12-09.
  51. "渝贵铁路、重庆西站、沙坪坝站25日开通,乘车出行的你千万别走错地方!" (in Chinese). Chongqing Morning News. 2018-01-19. Retrieved 2018-01-19.
  52. 吉林至珲春高铁将于2014年竣工通车 2013-02-20
  53. "长珲高铁20日全线开通 长春到延吉只需2小时05分". 新文化网. 2015-09-19. Retrieved 2016-01-29.
  54. "Huangshan - Hangzhou railway starts construction in the second half of 2014". China Daily. 2014-05-19. Retrieved 2014-05-24.
  55. (Chinese) "2020年快速铁路网将覆盖安徽 商合杭高铁力争早开工" 2012-10-11
  56. 南阳将搭上郑渝高铁 国家已立项有望15年开建 2014-03-06
  57. Liu, Longsheng (2014-05-22). "Meizhou-Chaoshan High-speed Rail Will Start Construction before the End of the Year". Meizhou City People's Government Portal. Archived from the original on 2014-08-02. Retrieved 2014-06-21.
  58. (Chinese)[http://news.xinhuanet.com/local/2014-12/26/c_1113791596.htm 连淮扬镇铁路客运专线开工建设 Xinhua] 2014-12-26
  59. (Chinese) 2004年国家《中长期铁路网规划》内容简介 2014-05-27; accessed 2017-07-16
  60. National Development and Reform Commission 2016, p. 11.
  61. "达州至万州铁路电气化改造 成都站扩能改造工程". 人民网. 2009-09-29. Retrieved 2014-05-31.
  62. "成灌铁路彭州支线4月30日开通运营". 人民网. 2014-05-04. Retrieved 2014-05-31.
  63. "New intercity railway opens in NE China". China Daily. 2010-12-30. Retrieved 2010-12-30.
  64. 1 2 "Guangzhou-Zhuhai intercity railway put into operation". People's Daily Online. 2011-01-08. Retrieved 2013-01-05.
  65. "Another key PRD rail route opens: Macau-Zhuhai to Guangzhou launched, tickets pricey". The Nanfang. 2013-01-07. Retrieved 2013-05-01.
  66. "广肇城轨时速200公里 广州到肇庆只需1小时". 新浪地产网. 2009-09-30. Archived from the original on 2013-10-02. Retrieved 2013-05-02.
  67. "廣佛肇城軌擬明日開通". Sina. 2016-03-29. Archived from the original on 2016-04-12.
  68. "Construction of Dongguan-Huizhou intercity light rail project started". Dongguan Today. 2009-05-17. Retrieved 2013-05-02.
  69. "莞惠城轨首通段即将运营 东莞常平东至惠州小金口票价35元". southcn.com. 2016-03-29.
  70. "广州至清远城轨项目昨日开工 票价预计约10元". 中国新闻网. 2012-11-23. Retrieved 2014-07-08.
  71. (Chinese) 最新进展!广清城际轨道年底可通车 2017-02-18
  72. "湖北省2014年前将建成开通4条城际铁路". 火车票网. 2012-10-12. Retrieved 2012-05-02.
  73. "The 1st intercity rail to be open to traffic in Hubei". Xianning Municipal People's Government News. 2013-12-30. Retrieved 2013-12-31.
  74. 1 2 (Chinese) 图文:武石武冈城际铁路昨日通车 楚天都市报讯 2014-06-19
  75. 武九客运专线计划下月21日全线运营 中部地区首条跨省城际铁路
  76. 武孝城际铁路正式开通 市民可以坐城铁赶飞机
  77. "Construction Intelligence Center". www.construction-ic.com. Retrieved 2017-12-09.
  78. "成绵乐铁路客运专线年底通车". 中国新闻网. 2014-04-24. Retrieved 2014-04-25.
  79. (Chinese) "成绵乐高铁 千呼万唤始出来" Gaotie.cn 2014-12-19
  80. 成蒲铁路建设正式启动_铁路建设 Archived 2013-05-13 at the Wayback Machine.
  81. http://en.cdftz.gov.cn/articleread.asp?id=373
  82. 1 2 "郑州至焦作开封新郑机场3条城际铁路开工(图)". 人民网. 2009-12-30. Retrieved 2013-05-02.
  83. (Chinese) "河南省首条城际铁路迎客运营 拉来‘双城生活’" 2014-12-29
  84. "High speed trains connecting Zhengzhou and Jiaozuo start operation" 2015-06-27
  85. "郑州至机场城际铁路今日开通运营". 河南日报. 2015-12-31. Retrieved 2015-12-31.
  86. "广铁集团公司关于长株潭城际铁路开通运营的公告". 12306.cn. 2016-12-25. Retrieved 2016-12-25.
  87. 安庆宁安城际铁路长江大桥今年元旦前合龙(图)
  88. Nanjing – Anqing PDL opened
  89. (Chinese) 黑龙江省哈牡客专已开工 哈齐客专明年建成 2014-12-18
  90. 1 2 (Chinese) "青荣城际今日通车 青烟威三城连心" 青岛新闻网 2014-12-28
  91. 贵开城际铁路全线贯通 预计年底开通营运
  92. 贵开城际铁路全线贯通 预计年底开通营运
  93. "金温铁路昨天正式开通 时间短了 票价省了". Hangzhou Portal. 2015-12-27. Retrieved 2016-01-04.
  94. "成渝客运专线重庆段昨开工". 成都商报. 2010-03-23. Retrieved 2010-03-23.
  95. "Chengdu-Chongqing Highspeed Railway Starts Operation". CRIENGLISH.com. 2015-12-26. Retrieved 2016-01-03.
  96. 1 2 "NE China starts building new border railways". China.org.cn. 2010-03-18. Retrieved 2013-05-02.
  97. "王占柱:沈丹客运专线明年全线铺轨". 人民网. 2013-03-18. Archived from the original on 2013-05-20. Retrieved 2013-05-02.
  98. "丹大快速铁路全线开工 大连至丹东最快一个半小时". 搜狐焦点. 2013-03-10. Retrieved 2013-05-02.
  99. "Trial operation for 1st coastal express railway in NE China - China.org.cn". www.china.org.cn. Retrieved 2015-11-09.
  100. "Chongqing-Wanzhou Railway under smooth construction". Chongqing News. 2013-04-12. Archived from the original on 2013-11-10. Retrieved 2013-05-02.
  101. "成都铁路局关于渝万高速铁路11月28日正式开通运营的公告(一)". 12306.cn. 2016-11-26. Retrieved 2016-11-26.
  102. "成都铁路局关于渝万高速铁路11月28日正式开通运营的公告(二)". 12306.cn. 2016-11-26. Retrieved 2016-11-26.
  103. "Hainan Island high-speed line goes full circle". International Railway Journal. 2015-11-27. Retrieved 2015-12-30.
  104. 1 2 "首条南昌至北京高铁通道将彻底打通". 中国江西网. 2013-12-30. Retrieved 2014-07-08.
  105. "武九客运专线计划下月21日全线运营 中部地区首条跨省城际铁路". www.cnhan.com (in Chinese). 2017-08-29. Retrieved 2017-12-09.
  106. "At a Glance". Shenzhen Daily. 2015-12-29. Retrieved 2016-01-29.
  107. 孙慕遥. "Beijing-Tangshan intercity express to open in 2020". www.chinadaily.com.cn. Retrieved 2018-08-28.
  108. "Hangzhou-Huangshan Railway project launched". anhuinews.com. 2014-07-01. Retrieved 2014-07-09.
  109. "哈佳新快速铁路开工". 黑龙江晨报. Archived from the original on 2014-11-12. Retrieved 2014-11-12.
  110. "哈佳铁路9月30日开通运营 两地车程缩短至2小时". 中国新闻网.
  111. "新建哈牡铁路客运专线开工 设计时速250公里工期4年半". 东北网. Retrieved 16 December 2014.
  112. (Chinese) 牡丹江至哈尔滨铁路客运专线项目获国家批准 2014-03-10
  113. 铁道部官员深入解析:未来我国铁路布局 Archived 2012-07-01 at Archive.is
  114. "High-speed railway linking Xiamen & Longyan starts operation on June 29". What's On Xiamen. 2012-06-30. Retrieved 2012-06-30.
  115. "China's high-speed railways exceed 10,000 km". China.org.cn. 2013-09-26. Retrieved 2013-10-08.
  116. "赣南闽西革命老区首开动车组列车 今日上午发售车票". JXNews.com.cn. 2015-12-25. Retrieved 2016-01-03.
  117. "兰渝铁路全线开通 重庆至兰州节省7小时". www.chinanews.com. 2017-09-29. Retrieved 2018-04-29.
  118. "南(平)三(明)龙(岩)高铁动工" December 26, 2010
  119. 成兰铁路26日动工 建成后可2小时从成都到达九寨沟_资讯频道_凤凰网
  120. "九景衢铁路初步设计获批 力争2017年通车". 今视网. 2013-09-16. Retrieved 2014-07-08.
  121. "沪通铁路开工 建成后南通到上海不超过1小时". 人民网. 2014-02-28. Retrieved 2014-07-08.
  122. (Chinese) 福州至平潭铁路工程开工建设 人民铁道报 2013-11-02
  123. (Chinese) 黔张常铁路(湘西段)建设工程开工(组图) 2014-12-29
  124. (Chinese) 青连铁路正式开工建设 2018年有望能通车 2014-12-29
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.