Line 10 (Guangzhou Metro)

Line 10
 10 
Overview
Other name(s) M10 (plan name)
Wushan line (五山线)
Type Rapid transit
System Guangzhou Metro
Status Under construction
Termini Xilang
Tianhe Coach Terminal
Stations 19
Services 1
Operation
Opened 2022
Owner City of Guangzhou
Operator(s) Guangzhou Metro Corporation
Technical
Line length 26.9 km (16.7 mi)
including the Wushan section
Track gauge 1,435 mm (4 ft 8 12 in)
Line 10
Simplified Chinese 广州地铁10号线
Traditional Chinese 廣州地鐵10號線
Line 10 drawn to scale.

Line 10 of the Guangzhou Metro is a rapid transit rail line currently under construction in Guangzhou. Line 10 will incorporate Line 3's spur line into Line 10 once it becomes operational. Line 10 will connect Tianhe with Liwan via Haizhu. Line 10 mainly runs parallel in-between Line 2 and Line 3 in Haizhu. Line 10 has been under construction since January 2018.[1]

Station

Station
Station name Connections Distance
km
Location
English Chinese
Xilang 西朗  1   Guangfo  0.00 0.00 Liwan
Guanggang New Town 广钢新城
Dongsha 东沙
Daganwei 大干围 Haizhu
Shixi 石溪
Dongxiaonan 东晓南  2 
Wufeng 五凤
South Gate of Sun Yat-sen University 中大南门
Binjiang Donglu 滨江东路
Donghu 东湖  6  Yuexiu
Shuqian Lu 署前路
Siyou Xinmalu 寺右新马路  5 [lower-alpha 1]
Guangzhou Dadaozhong 广州大道中 Tianhe
Tianhe Lu 天河路  1 [lower-alpha 2]  3 [lower-alpha 2]
Shipaiqiao 石牌桥
Gangding 岗顶
South China Normal University 华师
Wushan 五山
Tianhe Coach Terminal 天河客运站  6 
  1. Out of system transfer via Wuyangcun
  2. 1 2 Out of system transfer via Tiyu Xilu

References

  1. "广州地铁10号线、3号线东延段工程可行性研究报告获批复". CaMet. Guangzhou Daily. Retrieved 4 September 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.