Line 6 (Guangzhou Metro)

Line 6
 6 
Platform of Xunfenggang
Overview
Other name(s) M7 (7 lines plan name)
M6 (2000 plan name)
Luogang line (萝岗线)
Type Rapid transit
System Guangzhou Metro
Status Operational
Locale Huangpu, Tianhe, Yuexiu, Liwan, and Baiyun districts
Guangzhou, Guangdong
Termini Xunfenggang
Xiangxue
Stations 32
Services 2
Daily ridership 850,000 (2018 Avg.)[1]
1.053 million (2017 Peak)[2]
Operation
Owner City of Guangzhou
Operator(s) Guangzhou Metro Corporation
Character Underground/Elevated (Three stations)
Rolling stock CRRC Qingdao Sifang/Kawasaki Heavy Industries Metro cars[3]
Technical
Line length 41.7 km (25.9 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rails, 1,500 V DC
Route map

future extension
Luogang Depot
Xiangxue
Luogang
( 7 )
 7 
Left arrow to Shuixibei
to Guangzhou South Railway Station Right arrow
connection to Line 21
Suyuan
( 21 )
 21 
Left arrow to Zengcheng Square
to Yuancun Right arrow
Xiangang
Jinfeng
Huangbei
Gaotangshi
Kemulang
Longdong
Botanical Garden
future route split
Changban
Tianhe Coach Terminal
Bus interchange  3  before 2022 ( 10  after 2022)
 3  to Airport North
Yantang
 3 
 3  to Panyu Square
Tianpingjia
Shahe
( 11 )
Shaheding
Huanghuagang
 5  to Wenchong
Ouzhuang
 5 
 1  to
Guangzhou East
Railway Station
Dongshankou
 1 
Donghu
( 10   12 )
Tuanyida Square
Beijing Lu
Haizhu Square
 2 
 2 
Left arrow to Jiahewanggang
to Guangzhou S Railway Station Right arrow
Yide Lu
Cultural Park
( 8 )
 8 
Left arrow to Baiyun Lake
to Wanshengwei Right arrow
Huangsha
 1 
 1  to Xilang
Ruyifang
( 11 )
Tanwei
 5 
connection to Line 5
 5  to Jiaokou
Hesha
Baisha River
Shabei
Hengsha
Beihuan Expressway
Xunfenggang
( 12 )
Xunfenggang Yard
Line 6
Simplified Chinese 广州地铁6号线
Traditional Chinese 廣州地鐵6號線

Line 6 of the Guangzhou Metro runs from Liwan District to Huangpu District. It starts at Xunfenggang and ends at Xiangxue, interchanging with Line 5 at Tanwei and Ouzhuang; Line 1 at Huangsha and Dongshankou; Line 8 at Cultural Park; Line 2 at Haizhu Square, Line 3 at Yantang and Tianhe Coach Terminal. The color of Line 6 is maroon. The total length is 41.9 km (26.0 mi) with 32 stations. Line 6 serves densely populated areas including residential communities in Jinshazhou, the pedestrian street in Beijing Lu and wholesale markets in Shahe. Nevertheless, Line 6, which runs four-car trains, has long had a questionable train capacity. The phase one section between Xunfenggang and Changban began to provide service from 28 December 2013 with the exception of Yide Lu and Shahe stations.[4] Yide Lu opened over a year later on 28 January 2015. The second phase of Line 6 from Changban to Xiangxue has been in operation since 28 December 2016.

Opening timeline

Line 6 drawn to scale.
SegmentCommencementLengthStation(s)Name
Xunfenggang — Changban 28 December 2013 24.5 km (15.22 mi) 20 Phase 1
Yide Lu 28 January 2015 Infill station 1
Changban — Xiangxue 28 December 2016 17.2 km (10.69 mi) 8 Phase 2
Botanical Garden, Kemulang 28 June 2017 Infill stations 2

Station listing

Service
routes
Station
Station name Connections Distance
km
Location
English Chinese
6 01 Xunfenggang 浔峰岗 0.00 0.00 Baiyun
6 02 Hengsha 横沙 0.87 0.87
6 03 Shabei 沙贝 0.81 1.68
6 04 Hesha 河沙 2.21 1.89 Liwan
6 05 Tanwei 坦尾  5  1.09 2.98
6 06 Ruyifang 如意坊 1.86 4.84
6 07 Huangsha 黄沙  1  1.19 6.03
6 08 Cultural Park 文化公园 0.85 6.88
6 09 Yide Lu 一德路 0.95 7.83 Yuexiu
6 10 Haizhu Square 海珠广场  2  0.95 8.78
6 11 Beijing Lu 北京路 0.56 9.34
6 12 Tuanyida Square 团一大广场 0.83 10.17
6 13 Donghu 东湖 1.15 11.32
6 14 Dongshankou 东山口  1  1.36 12.68
6 15 Ouzhuang 区庄  5  1.10 13.78
6 16 Huanghuagang 黄花岗 1.07 14.85
6 17 Shaheding 沙河顶 0.97 15.82 Tianhe
6 18 Shahe 沙河 1.03 16.85
6 19 Tianpingjia 天平架 1.10 17.95
6 20 Yantang 燕塘  3  0.64 18.59
6 21 Tianhe Coach Terminal 天河客运站  3  2.21 20.80
6 22 Changban 长湴 0.99 21.79
6 23 Botanical Garden 植物园 1.89 23.68
6 24 Longdong 龙洞 1.74 25.42
6 25 Kemulang 柯木塱 1.94 27.36
6 26 Gaotangshi 高塘石 1.52 28.88
6 27 Huangbei 黄陂 2.42 31.30 Huangpu
6 28 Jinfeng 金峰 2.20 33.50
6 29 Xiangang 暹岗 1.30 34.80
6 30 Suyuan 苏元 0.93 35.73
6 31 Luogang 萝岗 1.53 37.26
6 32 Xiangxue 香雪 2.09 39.35

References

  1. 广州地铁六号线运力再升级!间隔首次压缩到小于3分钟.
  2. 1002.57万人次!广州地铁客流首次突破千万. 金羊网. 2018-01-02. Retrieved 2018-01-12.
  3. https://rail.kychung.com/en/2d-en/guangzhou-metro-line-6-csr-sifang-emu/
  4. Zheng, Xiaojia. "Guangzhou Metro Line 6 opens on Dec. 28". Life of Guangzhou. Guangzhou Interactive Information Network. Retrieved 10 January 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.