Line 13 (Shenzhen Metro)

Line 13
 13 
Overview
Other name(s) Shiyan Line
(石岩线; 石岩線; shíyán xiàn)
Type Rapid transit
System Shenzhen Metro
Status Under construction
Locale Nanshan District
Shenzhen, Guangdong
Termini Shenzhen Bay Checkpoint
Shangwu
Stations 16
Services 1
Operation
Operator(s) SZMC (Shenzhen Metro Group)
Character Underground
Technical
Line length 22.5km
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Overhead Line, 1,500 V DC

Line 13 of the Shenzhen Metro is one of the four new metro lines of Phase IV expansion under construction in the city of Shenzhen, Guangdong.[1] It is expected to be completed and operational in 2022.[2] The first phase of the line will be 23 km (14 mi) long and use eight car type A trains with a maximum operating speed of 100 km/h (62 mph).[3]

Stations

Line 13 of Shenzhen Metro will run through Nanshan District with 16 stations.[3] It will link Shenzhen Bay Immigration Checkpoint to Xili Lake near Shenzhen University.[4]

References

  1. "WORK ON 4 NEW METRO LINES TO START THIS YEAR". Shenzhen Daily. 9 February 2017. Retrieved 9 February 2017.
  2. "Metro lines to connect with Dong guan and Hui zhou". The Nanfang. 11 December 2016. Retrieved 9 February 2017.
  3. 1 2 深圳地铁12、13、14、16等5条线明天开工,5年建成. news.sina.com.cn. Retrieved 2018-03-07.
  4. "Shenzhen metro official website". www.szmc.net. Retrieved 9 February 2017.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.