Line 10 (Shenzhen Metro)

Line 10
 10 
Overview
Type Rapid transit
System Shenzhen Metro
Status Under construction
Locale Shenzhen, China
Termini Futian Checkpoint
Shuangyong Street
Stations 24
Operation
Planned opening 2020
Operator(s) SZMC (Shenzhen Metro Group)
Character Underground
Technical
Line length 29.9 km (18.58 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 10 (simplified Chinese: 十号线; traditional Chinese: 十號線; pinyin: Shíhào Xiàn), also known as the Bantian line (simplified Chinese: 坂田线; traditional Chinese: 坂田線; pinyin: Bǎntián Xiàn) of the Shenzhen Metro began construction at the end of 2015; the line is expected to open in 2020.[1] Line 10 has a length of 29.9 km (18.6 mi) and a total of 23 stations. It connects the Futian Checkpoint to Pinghu Center. In the southern terminus of the line, a 555 meters long and 50.5 meters wide double deck underground depot capable of storing 16 trains will be constructed.[2]

History

Line 10 was originally a low priority line to be constructed in the long term future called Line 16. In 2011, the Shenzhen Municipal Government approved the Longgang District Government to start the preliminary work on Line 10.[3] On 2013, the Shenzhen Municipal Government renumbered Line 16 into Line 10 and included it in the Phase III expansion.[4][5] The original Shenzhen Metro Line 10 was renumbered to Line 12 planned to be built in Phase IV.[6] This was done to fast track the construction of the line to ease the pressure on Line 4 and accommodate further growth of the Longgang area.[7][8] In August 2016, planners are proposing the line be redesigned to handle 8 car trains instead of the original specification of 6 cars to increase the line's ability to handle the growing transport demand in Shenzhen.[9]

Stations

Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Shuangyong Street 双拥街 Longgang
Pinghu 平湖
Hehua 禾花
China South City 华南城
Mugu 木古
Shanglilang 上李朗
Liangmao Hill 凉帽山
Gankeng 甘坑
Xuexiang 雪象
Gangtou 岗头
Huawei 华为
Bei'er Road 贝尔路
Bantian North 坂田北
Wuhe 五和  5 
Guangyayuan 光雅园
Nankeng 南坑
Yabao 雅宝
Maling 孖岭  9  Futian
Donggualing 冬瓜岭
Lianhuacun 莲花村  3 
Gangxia North 岗厦北  2   14 
Gangxia 岗厦  1 
Fumin 福民  4   7 
Futian Checkpoint 福田口岸  4 (      via LMC [thru border check])

References

  1. 地铁10号线拟于本月动工 深圳东部将增添轨道大动脉 - 深视新闻 - 城市联合网络电视台. www.cutv.com. Retrieved 2016-12-13.
  2. "深圳将有国内最大地铁停车场 可同时停16列车_广深新闻_新闻_星岛环球网". news.stnn.cc (in Chinese). Retrieved 2018-07-21.
  3. Huang Chun (黄淳). 地铁16号线有望2015年提前开工建设 设26站_深圳新闻_深圳新闻网. www.sznews.com. Retrieved 2016-12-13.
  4. 地铁10号线 终点在平湖---深圳都市报. dtzbd.sznews.com. Retrieved 2016-12-13.
  5. 原地铁10号线将何去何从?. Archived from the original on 2016-08-03.
  6. 深圳原地铁10号线没有取消 只是建设时序调整_深圳新闻_最全最迅速的深圳资讯—深圳新闻网. www.sznews.com. Retrieved 2016-12-13.
  7. 深圳交委称早7点以前或实行地铁票价优惠. Ifeng Guangzhou. December 5, 2012. Archived from the original on December 4, 2014.
  8. 我市召开轨道交通建设指挥部会议,地铁16号线有望提前开工. 深圳市交通运输委员会 [Shenzhen Municipal Transportation Committee]. January 7, 2013. Archived from the original on January 4, 2015.
  9. 深圳地铁10号线初步设计修编(8A编组)专家暨政府评审会圆满召开.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.