Line 8 (Shenzhen Metro)

Line 8
 8 
Overview
Type Rapid transit
System Shenzhen Metro
Status Under Construction
Locale Shenzhen, China
Termini Liantang
Yantian Road
Stations 7
Operation
Planned opening 2020
Operator(s) SZMC (Shenzhen Metro Group)
Character Underground
Rolling stock Trains service in Line 2
Technical
Line length 12.34 km (7.67 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 8 of the Shenzhen Metro (also known as the Yantian line) is currently under construction. Line 8 has a length of 12.34 km (7.67 mi) and a total of 6 stations. It connects Liantang with Yantian. Line 8 is the first line to serve Yantian District. The line may be built as a monorail rather than a traditional metro.[1] Construction may start in 2016, with the line scheduled to open in 2020.[2] This route is planned to connect with Line 2, with trains on Line 2 terminating at Yantian station.

Stations

Phase I

  • Under Construction
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Liantang 莲塘  2  Luohu
Wutong Hill 梧桐山
Shatoujiao 沙头角 Yantian
Haishan 海山
Yantian Port 盐田港
Shenwai 深外
Yantian Road 盐田路

Phase II

  • Under planning
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Yantian Food Street 盐田食街 Yantian
Yantian Port East 盐田港东
Dameisha 大梅沙
OCT East 东部华侨城
Xiaomeisha 小梅沙
Xichong 溪涌 Longgang
Shangdong 上洞
Tuyang 土洋
Kuichong Distribution center 葵涌集散中心
Kuichong Center 葵涌中心
Kuichong Cultural Square 葵涌文化广场

References

  1. 深圳地铁6条延长线线路图!看看哪些经过你家 - 深圳本地宝. jt.sz.bendibao.com. Retrieved 2016-06-11.
  2. Sasin, Jasmin. "New Metro Lines to Start Construction in September". Shenzhen Standard. Retrieved 23 January 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.