Line 21 (Guangzhou Metro)

Line 21
 21 
Overview
Other name(s) M21 (plan name)
Eastern New Town express line (Chinese: 东部新城快线)
Type Rapid transit
System Guangzhou Metro
Status Under construction
Termini Zhenglongxi
Zengcheng Square
Stations 15
Services 1
Operation
Opened 28 December 2018
Owner City of Guangzhou
Operator(s) Guangzhou Metro Corporation
Technical
Line length 47.8 km (29.7 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Route map

Zengcheng Square
Zhonggang
Xiangling Stabling Yard
Xiangling
Zhucundong
Zhucun
Zhongxindong
Zhongxin
Zhenlong
 14 
Zhenlong Depot
 14  Left arrow to Xinhe
Zhenlongnan
Jinkeng
Changping
Shuixi Stabling Yard
Shuixi
 7 
 7 
Left arrow to Shuixi North
to Meidi Dadao Right arrow
Suyuan
 6 
Science Square
Shenzhou Lu
Intelligent Town
Grand World Scenic Park
Huangcun
 4 
Tangdong
 11  Left arrow clockwise
Share track with Line 11
 13 
Left arrow to Chaoyang
to Xinsha Right arrow
Tianhe Park
 11   13 
Yuancun
 5   11 
 5 
Left arrow to Jiaokou
to Wenchong Right arrow
 11  Down arrow clockwise

Line 21 of the Guangzhou Metro (Chinese: 广州地铁21号线; pinyin: Guǎngzhōu Dìtiě Èrshíyīhàoxiàn) is a rapid transit rail line under construction in Guangzhou. Line 21 is an express suburban metro line along with Line 14. Both lines are envisioned to connect and promote development in the northeast regions of Guangzhou. Line 21's unique role means that it has many design features that make it different from other Guangzhou metro lines. For example, several stations will have passing loops to allow for express and local stopping patterns. The trains in Line 21 will reach a maximum service speed of 120 km/h (75 mph). These considerations will allow for passengers to travel from outer Guangzhou to the city center in one hour.[1] It is planned to run from Yuancun in Tianhe to Zengcheng Square in Zengcheng.[2] The Line is about 61.5 km (38.2 mi) long. The line will have 40.1 km (24.9 mi) of underground sections, 6.8 km (4.2 mi) of mountain base tunneling and 14.7 km (9.1 mi) on viaducts. The line will have a total of 20 stations, of which 17 will be underground and 3 will be elevated. Line 21 is currently under construction and is expected to be operational by the end of 2018.[3]

Line 21 drawn to scale.

Station

R L Station
Station name Connections Distance
km
Location
English Chinese
21 01 Yuancun 员村  5  0.00 0.00 Tianhe
21 02 Tianhe Park 天河公园 1.37 1.37
21 03 Tangdong 棠东 3.41 4.78
21 04 Huangcun 黄村  4  2.13 6.91
21 05 Daguan Nanlu 大观南路 1.16 8.07
21 06 Tianhe Intelligent City 天河智慧城 2.08 10.15
21 07 Shenzhou Lu 神舟路 3.27 13.42 Huangpu
21 08 Guangzhou Science City 科学城 1.99 15.41
21 09 Suyuan 苏元  6  2.45 17.86
21 10 Shuixi 水西 2.31 20.17
21 11 Changping 长平 3.00 23.17
21 12 Jinkeng 金坑 6.27 29.44
21 13 Zhenlongxi 镇龙西 5.94 35.38 Huangpu
21 14 Zhenlong 镇龙  14  2.17 37.55
21 15 Zhongxin 中新 2.12 39.67 Zengcheng
21 16 Kengbei 坑贝 3.59 43.26
21 17 Fenggang 凤岗 2.54 45.80
21 18 Zhucun 朱村 3.24 49.04
21 19 Shantian 山田 4.46 53.50
21 20 Zhonggang 钟岗 4.95 58.45
21 21 Zengcheng Square 增城广场 2.95 61.40

References

  1. 广州地铁 全程为你--公司新闻. www.gzmtr.com. Retrieved 2016-12-23.
  2. 广州规划7条新线地铁 里程超500公里 [Guangzhou plans 7 new metro lines, total metro length to exceed 500 km] (in Chinese). Guangzhou Metro Daily. 2012-07-12. Retrieved 2012-07-12.
  3. 广州市轨道交通二十一号线工程(员村~增城广场) 环境影响评价重新进行第二次公示_院内动态_广州市环境保护科学研究院. www.griep.com.cn. Retrieved 2016-12-23.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.