Kolkata Metro Line 5
Kolkata Metro Line 5 | |
---|---|
Overview | |
Type | Rapid transit |
System | Kolkata Metro |
Status | Under Construction |
Locale |
|
Termini |
Baranagar (south) Barrackpore (north) |
Stations | 11 |
Website | KMRC |
Operation | |
Operator(s) | KMRC |
Character | Elevated |
Technical | |
Line length | 12.40 |
Number of tracks | 2 |
Track gauge | 1,676 mm (5 ft 6 in) Broad gauge |
Electrification | 750 V DC[1] using third rail |
Operating speed | 80 km/h (designed) |
The Baranagar-Barrackpore Metro (Line 5) (12.40 km) was meant to enable a quicker commute from the northern suburbs to South Kolkata.
Line 5 | |||||||||
---|---|---|---|---|---|---|---|---|---|
No. | Station Name | Location | Opening | Connections | Layout | Coordinates | Notes | ||
English | Bengali | Hindi | |||||||
1 | Swami Vivekananda | স্বামী বিবেকানন্দ | स्वामी विवेकानंद | Baranagar | Under construction | Kolkata Metro Line 1 | Elevated | Also known as Baranagar (বরানগর) | |
2 | Krishnakali | কৃস্নকলি | कृष्णकालि | Kamarhati | Under construction | Elevated | Also known as Kamarhati | ||
3 | Acharya Prafulla Chandra | আচার্য প্রফুল্ল চন্দ্র | आचार्य प्रफुल्ल चंद्र | Agarpara | Under construction | Elevated | Also known as Agarpara | ||
4 | Gandhi Ashram | গান্ধী আশ্রম | गांधी आश्रम | Sodepur | Under construction | Elevated | Also known as Sodepur | ||
5 | Sarat Chandra | শরথ চন্দ্র | शरत चंद्र | Panihati | Under construction | Elevated | Also known as Panihati | ||
6 | Subhash Nagar | সুভাষ নগর | सुभाष नगर | Subhash Nagar | Under construction | Elevated | |||
7 | Rishi Bankim | ঋষি বঙ্কিম | ऋषि बंकिम | Khardaha | Under construction | Elevated | Also known as Khardaha | ||
8 | Rajendra Prasad | রাজেন্দ্র প্রসাদ | राजेंद्र प्रसाद | Power Plant | Under construction | Elevated | Also known as Titagarh Power Plant | ||
9 | Titagarh | টিটাগড় | टिटागढ़ | Titagarh | Under construction | Elevated | Also known as Titagarh | ||
10 | Anukul | অনুকুল | अनुकूल | Talpukur | Under construction | Elevated | Also known as Talpukur | ||
11 | Mangal Pandey | মঙ্গল পান্দে | मंगल पांडे | Barrackpore | Under construction | Elevated | Also known as Barrackpore |
See also
References
- ↑ CAF to supply Kolkata metro trains, Railway Gazette, 9 September 2012
This article is issued from
Wikipedia.
The text is licensed under Creative Commons - Attribution - Sharealike.
Additional terms may apply for the media files.