List of spacewalks since 2015
This list contains all spacewalks performed since the beginning of 2015 where an astronaut has fully, or partially left the spacecraft.
As of 19 August 2016, 215 astronauts have made spacewalks (out of 549 people who have gone into Earth orbit).[1][2][3]
2015–2019 spacewalks
Spacewalk beginning and ending times are given in Coordinated Universal Time (UTC).
2015 spacewalks
Start Date/Time | Duration | End Time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|
21 February 12:45 |
6 hours 41 minutes |
19:26 | Expedition 42/43 | Rigged and routed power and data cables at the forward end of the Harmony module as part of preparations for the installation of the International Docking Adapter at PMA-2.[4] | |
25 February 11:51 |
6 hours 43 minutes |
18:34 | Expedition 42/43 | Completed power and data cable routing at the forward end of the Harmony module. Removed launch locks from forward and aft berthing ports of Tranquility to prepare for relocation of the Permanent Multipurpose Module and the installation of the Bigelow Expandable Activity Module. Lubricated end effector of Canadarm2.[5][6] | |
1 March 11:52 |
5 hours 38 minutes |
17:30 | Expedition 42/43 | Finished cable routing, antenna and retro-reflector installation on both sides of the ISS truss and on other modules in preparation for the installation of the International Docking Adapter at PMA-2 and 3.[7][8] | |
10 August 14:20 |
5 hours 31 minutes |
19:51 | Expedition 44/45 | Installed gap spanners on the hull of the station for facilitating movement of crew members on future spacewalks, cleaned windows of the Zvezda Service Module, install fasteners on communications antennas, replaced an aging docking antenna, photographed various locations and hardware on Zvezda and nearby modules, and retrieved a space environment experiment.[9][10] | |
28 October 12:03 |
7 hours 16 minutes |
19:19 | Expedition 45 | Prepared a Main Bus Switching Unit for repair, installed a thermal cover on the Alpha Magnetic Spectrometer, lubricated elements of the Space Station Remote Manipulator System, and routed data and power cables to prepare for the installation of the International Docking Adaptor at PMA-2 and 3.[11] | |
6 November 11:22 |
7 hours 48 minutes |
19:10 | Expedition 45 | Worked to restore a portion of the ISS's cooling system to its primary configuration, returning ammonia coolant levels to normal in the primary and backup radiator arrays.[12] | |
21 December 13:45 |
3 hours 16 minutes |
16:01 | Expedition 46 | Released a brake on the Mobile Servicing System to allow it to be properly stowed prior to the arrival of a visiting Progress vehicle. Routed cables in preparation for the installation of the Nauka module and the International Docking Adapter, and retrieved tools from a toolbox.[13] |
2016 spacewalks
Start Date/Time | Duration | End Time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|
15 January 13:48 |
4 hours 43 minutes | 18:31 | Expedition 46 ISS Quest |
Replaced a failed voltage regulator responsible for shutting down one of the station's eight power channels in November 2015, and routed cables in support of the installation of the International Docking Adaptor. EVA terminated two hours early due to water leakage in Kopra's helmet, but the primary task was accomplished.[14] | |
3 February 12:55 |
4 hours 45 minutes | 17:40 | Expedition 46 ISS Pirs |
|
Deployed a commemorative flash drive, took samples of module exteriors, installed handrails for use in future EVAs, retrieved an astrobiology experiment, deployed a materials science experiment, and tested a tool for applying coatings to module exteriors.[15] |
19 August 12:04 |
5 hours 58 minutes | 18:02 | Expedition 48 ISS Quest |
The astronauts installed the International Docking Adapter (IDA) which was delivered by Dragon CRS-9, allowing future commercial crew spacecraft to dock with the station. This first IDA was attached to Harmony's forward port, over the existing Pressurized Mating Adapter (PMA).[16][17] The EVA terminated after completing the primary objective, without completing the secondary objectives, due to a malfunction of the right earphone of Jeff Williams. | |
1 September 11:53 |
6 hours 48 minutes | 18:41 | Expedition 48 ISS Quest |
The crew retracted a thermal radiator which is a backup, and then installed the first pair of several High Definition cameras to monitor the traffic around the station. Then they have performed some maintenance operations.[18] |
Timothy Peake Malenchenko and Volkov Jeff Williams during EVA
2017 spacewalks
Source:[19]
Start Date/Time | Duration | End Time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|
6 January 12:23 |
6 hours 31 minutes |
18:54 | Expedition 50 ISS Quest |
The crew completed the installation of new batteries on the Station's power channel 3A, and then executed a series of tasks to get ahead for the next EVA. Kimbrough collected photos of the AMS-02, then they removed a broken light on the S3 truss and routed ethernet cables on the Z1 truss. | |
13 January 11:22 |
5 hours 58 minutes |
17:20 | Expedition 50 ISS Quest |
The crew completed the installation of new batteries on the Station's power channel 1A, and then executed a series of get ahead tasks. First they installed a new camera on the Mobile Transporter Relay Assembly, then Pesquet replaced a Worksite Interface Adapter on Canadarm-2 and collected photos of Z1 truss and S0 truss, meanwhile Kimbrough removed 2 handrails from the Destiny module. Then they picked up a bundle of covers and brought them to the Tranquillity module where will be installed when Pressurized Mating Adapter 3 will be moved from Node 3 to Node 2. When removed, the PMA's Common Berthing Mechanism will be covered up to protect it from the space environment. | |
24 March 11:24 |
6 hours 34 minutes |
17:58 | Expedition 50 ISS Quest |
Kimbrough replaced the External Control Zone 2 (EXT-2) Multiplexer-Demultiplexer (MDM) with an upgraded "EPIC MDM" and prepared PMA-3 for its robotic relocation on Sunday. Pesquet inspected the Radiator Beam Valve Module for ammonia leaks, then lubricated one of the Latching End Effectors of Dextre. Kimbrough then replaced a pair of cameras on the Kibo module, and a light on one of the CETA carts. | |
30 March 11:29 |
7 hours 4 minutes |
18:33 | Expedition 50 ISS Quest |
Kimbrough replaced the External Control Zone 1 (EXT-1) Multiplexer-Demultiplexer (MDM) with an upgraded "EPIC MDM" while Whitson connected heater power and heater feedback telemetry to enable PMA-3 to be repressurized, then released a series of straps to free up a cover that protected the APAS. The astronauts then installed 4 axial shields on PMA-3's former location on Tranquillity module and installed covers on PMA-3. | |
12 May 13:01 [20] |
4 hours 13 minutes |
17:21 | Expedition 51 ISS Quest |
| |
23 May 11:20 [21] |
2 hours 46 minutes |
14:06 | Expedition 51 ISS Quest |
Throughout this hurriedly planned ‘contingency’ spacewalk, both Fischer and Whitson successfully replaced a failed multiplexer-demultiplexer (MDM), and installed a pair of antennas on station to enhance wireless communication for future spacewalks.[22] | |
17 August 14:36 [23] |
7 hours 34 minutes |
22:10 | Expedition 52 ISS Pirs |
||
5 October 12:05 |
6 hours 55 minutes |
19:00 | Expedition 53 ISS Quest |
| |
10 October 11:56 |
6 hours 26 minutes |
18:22 | Expedition 53 ISS Quest |
| |
20 October 11:47 |
6 hours 49 minutes |
18:36 | Expedition 53 ISS Quest |
Peggy Whitson
2018 spacewalks
Source:[24]
Start Date/Time | Duration | End Time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|
23 January 11:49 |
7 hours 24 minutes |
19:13 | Expedition 54 ISS Quest |
| |
2 February 15:34 |
8 hours 13 minutes |
23:47 | Expedition 54 ISS Pirs |
| |
16 February 12:00 |
5 hours 57 minutes |
17:57 | Expedition 54 ISS Quest |
||
29 March 13:33 |
6 hours 10 minutes |
19:43 | Expedition 55 ISS Quest |
| |
16 May 11:39 |
6 hours 31 minutes |
18:10 | Expedition 55 ISS Quest |
| |
14 June 13:06 |
6 hours 49 minutes |
19:55 | Expedition 56 ISS Quest |
| |
15 August 16:17 |
7 hours 46 minutes |
00:03 on 16 August | Expedition 56 ISS Pirs |
||
11 December 15:59 |
7 hours 45 minutes |
21:44 | Expedition 57 ISS Pirs |
|
2019 spacewalks
Start Date/Time | Duration | End Time | Spacecraft | Crew | Remarks |
---|---|---|---|---|---|
22 March
12:01 |
6 hours
39 minutes |
18:40 | Expedition 59 | ||
29 March
11:42 |
6 hours
45 minutes |
18:27 | Expedition 59 | ||
8 April
11:31 |
6 hours 29 minutes | 18:00 | Expedition 59 |
| |
29 May
15:42 |
6 hours 1 minute | 21:43 | Expedition 59 |
| |
21 Aug
12:27 |
6 hours 32 minutes | 18:59 | Expedition 60 |
Hague and Morgan installed the final International Docking Adapter on the Harmony Module. Task for this spacewalk was identical to Spacewalk 194 and required work by both spacewalkers and Dextre to get the docking port installed in preparation for its test by the Boeing CST-100 Starliner which will occur at the end of October. The crew also routed cables and installed wifi routers for upcoming experiments. [32] | |
6 October
11:39 |
7 hours 01 minutes | 18:40 | Expedition 61 |
This spacewalk was the first of Expedition 61 and the first of a series of 5 to replace and improve ISS batteries on the P6 truss. [33] | |
11 October
11:38 |
6 hours 45 minutes | 18:23 | Expedition 61 |
This spacewalk was the second of Expedition 61 and the second of a series of 5 to replace and improve ISS batteries on the P6 truss. Before they went out the hatch Mission Control Moscow relayed to the crew Alexei Leonov had passed away and this spacewalk is dedicated to him. As the crew came in and took off their suits each gave a choice of words before station commander Luca Parmitano said "Farewell Alexei, and ad astra." [34] [35] | |
18 October
11:38 |
7 hours 17 minutes | 18:55 | Expedition 61 |
This spacewalk was to be the third of Expedition 61 and the third of a series of five to replace and improve ISS batteries on the P6 truss. Some of the battery swaps were delayed to EVA 222 because of a failure in a Battery Charge Discharge Unit on the P6 Truss taking the 4B battery channel partially offline. Koch and Meir replaced the failed unit and brought it inside. They wrapped up the spacewalk by installing a stanchion on the Columbus Module and routing a cable on the Destiny Lab module.[36] This was the first all-female spacewalk. During the spacewalk President Trump called the station and congratulated Koch and Meir on this milestone.[37] | |
- Jessica Meir during first all female spacewalk in history on October 18, 2019.