Line 2 (Dongguan Rail Transit)

Line 2
 2 
Overview
Type Rapid transit
System Dongguan Rail Transit
Status Under Construction
Locale Dongguan, China
Termini Humen Railway Station
Bitou
Stations 23 (15 operating)
Operation
Opened 27 May 2016
Operator(s) Dongguan Rail Transit Corporation, Limited
Character Underground and elevated
Rolling stock Bombardier Innovia Metro
Technical
Line length 37.7 km (23.43 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Operating speed 120 km/h designed, operating maximum 110km/h
Current plan map of Dongguan Rail Transit
Current plan map of Dongguan Rail Transit

Line 2 of the Dongguan Rail Transit, formerly known as Line R2, is a subway line in Dongguan. The first section has 15 stations and is 37.743 kilometres (23.452 mi) long, from Dongguan railway station to Humen railway station. It opened on 27 May 2016. Construction of Line 2 began in 2010.[1][2]

Opening timeline

SegmentCommencementLengthStation(s)Name
Humen — Dongguan 27 May 2016 37.7 km (23.43 mi) 15 Phase 1 & 2

Stations

Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Humen Railway Station 虎门火车站 Humen railway station IUQ
L1 Shatian 4(沙田4) Houjie 6(厚街6) Houjie 7(厚街7) Humen 8(虎门8) Humen 10(虎门10) Express 15(公交快线15) Express 21(公交快线21) 801 802 808 841 846 855
0.00 0.00 Humen
Exhibition Center 展览中心
L1 Houjie 6(厚街6) 801 802 806 808 841
1.94 1.94 Houjie
Shanmei 珊美
L1 Shatian 1(沙田1) Houjie 3(厚街3) Houjie 7(厚街7) Houjie 21(厚街21) 801 802 806 808 825 841
3.19 5.13
Liaoxia 寮厦
L1 Houjie 1(厚街1) Houjie 17(厚街17) Houjie 20(厚街20) 802 808 831 841 856
3.26 8.39
Chenwu 陈屋
L1 Houjie 13(厚街13) Houjie 15(厚街15) Houjie 16(厚街16) 802 831 841
2.22 10.61
Hadi 蛤地
Express 1(公交快线1) 34 X12
1.61 12.22 Nancheng
Xiping 西平  GH 
850
1.61 13.83
Hongfu Road 鸿福路  1 
C2 C4 X5 9 X11 X13 14 19 27 36 41 46 328 862
1.46 15.29
Qifeng Park 旗峰公园
1 K1 LG1 K4 X6 14 18 23 27 37 52 56 X11
2.35 17.64 Dongcheng
Dongcheng 东城
4 K4 14 17 27 45 47 56
2.33 19.97
Tianbao 天宝
K4 5 K6 Gaoshe 9(高涉9) 13 14 X16 X23 27 49 50 51
4.82 24.79 Guancheng
Xiaqiao 下桥
L2 C3 K3 K4 Gaoshe 9(高涉9) X9 X18 19 24 25 32 33 858
1.93 26.72 Dongcheng
Liuhua Park 榴花公园
K3 Gaoshe 9(高涉9) 13 19 24 25 47 55 821 822 829 852
2.39 29.11
Chashan 茶山
Chashan 1(茶山1) Chashan 3(茶山3) A5 A9 859 861
2.73 31.84 Chashan
Dongguan Railway Station 东莞火车站  GS  Dongguan railway station RTQ
Chashan 1(茶山1) Shilong 1(石龙1) Chashan 2(茶山2) Shilong 2(石龙2) Chashan 3(茶山3) Shilong 3(石龙3) Chashan 4(茶山4) Shilong 4(石龙4) A5 Shilong 5(石龙5) Chashan 6(茶山6) Shilong 7(石龙7) Shilong 8(石龙8) A9 X18 47 805 805A 807 809 813 821 826 828 829 852 859 861
5.21 37.05 Shilong
Section II (Construction starting next year)[3]
  1. Humen North (虎门北)
  2. Humen Avenue (虎门大道)
  3. Humen Jinjie Road (虎门金捷路)
  4. Humen Guangming Road (虎门光明路)
  5. Humen South (虎门南)
  6. Chang'an New District West (长安新区西)
  7. Chang'an New District (长安新区) Interchange with Line 3
  8. Chang'an New District East (长安新区东)

See also

References

  1. "R2线2011年5月份工程进展". Dongguan Rail Transit. 2011-06-01. Retrieved 2011-08-14.
  2. "东莞首条地铁试运行". 东莞阳光网. 2015-12-29. Retrieved 2015-12-30.
  3. "定了!东莞这条地铁线,今年9月正式动工_". news.timedg.com. Retrieved 2018-07-15.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.