Chengdu Bus Rapid Transit
|
Overview |
---|
Locale |
Chengdu |
---|
Transit type |
Bus rapid transit |
---|
Number of lines |
4 |
---|
Number of stations |
29 |
---|
Website |
http://www.cdgjbus.com/ |
---|
Operation |
---|
Began operation |
June 11, 2013 |
---|
Technical |
---|
System length |
28.3 km (17.6 mi) |
---|
Average speed |
25 km/h (16 mph) |
---|
Top speed |
80 km/h (50 mph) |
---|
Chengdu Bus Rapid Transit is a Bus Rapid Transit system in Chengdu, the capital of Sichuan Province in the People's Republic of China. The current system consists of a loop line integrated with the Chengdu Second Ring Road with dedicated bus lanes running in the center two lanes of the expressway. Transfers are available to several Chengdu Metro stations.[1] The line began a free trial run on May 31, 2013, and started official operation on June 11, 2013. It has 29 center platform stations located in expressway median which requires special buses with the doors on the left.[2] The loop is served by Lines K1, K1A, K2 and K2A. All buses have wifi. A new 7.8 km (4.8 mi) radial line heading northeast from the BRT loop to Qingbaijiang District is under construction.[3] The line, called the Fenghuang Shan (Phoenix Mountain) BRT, is scheduled to open in 2017.[4] Another 4.5 km (2.8 mi) elevated BRT line heading south of the BRT loop is also currently under constriction.[5] This line is known as the Jiannan Avenue BRT and is projected to open in 2018.[6] Additional BRT lines are planned to radiate from the loop with lines heading west to Wenjiang District, east via Shanbanqiao Road and south to Tianfu New Area.[3][7] Additionally another BRT loop along the Third Ring Road was proposed.[8]
References
Public transportation in Sichuan Basin Metropolitan Region (SC) |
---|
Chengdu Metro | Lines in operation | |
---|
Under construction |
- 3 (Phase II & III)
- 5 (Phase I & II)
- 6 (Phase I & II & III)
- 8 (Phase I)
- 9 (Phase I)
- 10 (Phase II)
- 17 (Phase I)
- 18 (Phase I & II)
- 19 (Phase I)
|
---|
Planned |
- 8 (Phase II)
- 10 (Phase III)
- 11
- 12
- 13 (Phase I)
- 14
- 15
- 16
- 17 (Phase II)
- 18 (Phase III)
- 19 (Phase II)
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27 (Phase I)
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 18-1
- 18-2
|
---|
|
---|
Guang'an Metro | |
---|
C-train | |
---|
Intercity Rails | Lines in operation | |
---|
Under construction | |
---|
|
---|
Others | Chengdu BRT |
- Line K1 / Line K1A (clockwise)
- Line K2 / Line K2A (anticlockwise)
|
---|
|
---|
Transportation Hubs | Int'l airports | |
---|
Major rail stations | |
---|
|
---|
- China: AH
- BJ
- CQ
- FJ
- GD/HK/MO
- GS
- GX
- GZ
- HA
- HB
- HE
- HI
- HL
- HN
- JL
- JS
- JX
- LN
- NM
- NX
- QH
- SC
- SD
- SH
- SN
- SX
- TJ
- XJ
- XZ
- YN
- ZJ
|