Grand Central–42nd Street station

Grand Central–42nd Street (also signed as 42nd Street–Grand Central) is a major station complex of the New York City Subway. Located in Midtown Manhattan at 42nd Street between Madison and Lexington Avenues, it is the second busiest station in the 424-station system, with 44,928,488 passengers in 2017; only the Times Square station complex has more riders.[6] It serves trains on the IRT Lexington Avenue Line, the IRT Flushing Line and the 42nd Street Shuttle, and lies next to and beneath Grand Central Terminal, which serves all Metro-North Railroad lines east of the Hudson River.

 Grand Central–42 Street
 
New York City Subway station complex
Newer entrance to Grand Central–42nd Street at Lexington Avenue
Station statistics
AddressEast 42nd Street & Park Avenue
New York, NY 10017
BoroughManhattan
LocaleMidtown Manhattan
Coordinates40°45′08″N 73°58′39″W
DivisionA (IRT)
Line42nd Street Shuttle
IRT Flushing Line
IRT Lexington Avenue Line
Services      4  (all times)
      5  (all times except late nights)
      6  (all times) <6>  (weekdays until 8:45 p.m., peak direction)
      7  (all times) <7>  (rush hours until 9:30 p.m., peak direction)
      S  (all except late nights)
Transit connections NYCT Bus: M1, M2, M3, M4, M42, M101, M102, M103, Q32, X27, X28, X37, X38, X63, X64, X68, SIM4C, SIM6, SIM8, SIM8X, SIM11, SIM22, SIM25, SIM26, SIM30, SIM31, SIM33C
MTA Bus: BxM1, BxM3, BxM4, BxM6, BxM7, BxM8, BxM9, BxM10, BxM18, BM1, BM2, BM3, BM4, BM5, QM21, QM31, QM32, QM34, QM35, QM36, QM40, QM42, QM44
Academy Bus: SIM23, SIM24
Metro-North Railroad: Harlem, Hudson, and New Haven Lines (at Grand Central Terminal)
StructureUnderground
Levels3
Other information
OpenedJune 22, 1915 (1915-06-22)[1]
Station code610[2]
Accessible Partially ADA-accessible (all lines except 42nd Street Shuttle; shuttle is accessible at Grand Central but not at its only other station at Times Square)
Wireless service[3][4]
Former/other names42nd Street–Grand Central
Traffic
Passengers (2019)45,745,700[5] 1.2%
Rank2 out of 424[5]

The complex is served by the:

  • 4, 6, and 7 trains at all times
  • 5 train at all times except late nights
  • 42nd Street Shuttle (S) from 6 AM to midnight daily
  • <6> train during weekdays in the peak direction
  • <7> train during rush hours and early evenings in the peak direction

Station layout

G Street level Exit/entrance
Elevator to mezzanine inside main entrance, immediately to right of Grand Central Terminal entrance on 42nd Street between Park Avenue and Lexington Avenue
B1 Mezzanine To entrances/exits, station agent, MetroCard vending machines
Track 4 toward Times Square (Terminus)
Island platform
Track 3 toward Times Square (Terminus)
Island platform
Track 1 toward Times Square (Terminus)
B2 Northbound local toward Pelham Bay Park or Parkchester (51st Street)
toward Woodlawn late nights (51st Street)
Island platform
Northbound express toward Woodlawn (59th Street)
toward Dyre Avenue or Nereid Avenue (59th Street)
Southbound express toward Utica Avenue (14th Street–Union Square)
toward Flatbush Avenue weekdays, Bowling Green evenings/weekends (14th Street–Union Square)
Island platform
Southbound local toward Brooklyn Bridge (33rd Street)
toward New Lots Avenue late nights (33rd Street)
B3 Escalator landing
B4 Southbound toward Hudson Yards (Fifth Avenue)
Island platform
Northbound toward Flushing–Main Street (Vernon Boulevard–Jackson Avenue)
1918 plan

There is a mezzanine above the Lexington Avenue Line's platforms, which have numerous exits to and from Grand Central itself as well as to the streets (see § Exits). Escalators connect this mezzanine to the Flushing Line, although there are also staircases and passageways directly between the Lexington Avenue and Flushing Lines' platforms. The Flushing Line platform also has its own exit at its extreme eastern end, though all other exits are through the Lexington Avenue Line platforms and mezzanine.[7] Outside the Lexington Avenue Line mezzanine's fare control, there are stairs, escalators, and an elevator to Grand Central. An east-west passageway connects the Lexington Avenue Line's mezzanine to the 42nd Street Shuttle, which also has its own dedicated entrance and exit stairs. Except for the 42nd Street Shuttle (which is inaccessible at its other station at Times Square), the whole station is handicapped accessible, as is the connection to Grand Central Terminal.[8]

The station has undergone various renovations since the 1980s—when the first major renovation was carried out—but some of the passages and other components still require repair or renovation. At the same time, a project was ongoing to air cool the station in conjunction with Metro-North Railroad's project to cool Grand Central Terminal. However, as of 2006, only the Lexington Avenue Line station is air-cooled. The Lexington Avenue Line station is one of a very small number of artificially cooled stations in the New York City Subway.[9][10] The Flushing Line platforms have been equipped with fans, but not an air-cooling system.

In 2014, the Metropolitan Transportation Authority installed an online, interactive touchscreen computer program called "On The Go! Travel Station" (OTG) in Grand Central. The self-updating kiosks allow people to route their trips and check for delays.[11] The MTA set up the map as part of a pilot project in five subway stations. It lists any planned work or service changes, as well as information to help travelers find nearby landmarks and addresses.[12][13][14]

Exits

The station has numerous exits into Grand Central Terminal, to the street level at and directly into several buildings along 42nd Street and Park Avenue, including:[7][15]

An exit outside of the planned One Vanderbilt is proposed.[16] In October 2016, construction began on the entrance in One Vanderbilt.[17]

Exits directly to the street include:

  • One stair on either side of 42nd Street between Madison and 5th Avenues[7]
  • One stair/escalator, SW corner of Park Avenue and 42nd Street[7]
  • Two stairs, SW corner of Lexington Avenue and 42nd Street[7]

Relative depths

Canceled Hudson & Manhattan Railroad platform

In the 1900s and 1910s, it was proposed to extend the Uptown Hudson Tubes of the Hudson & Manhattan Railroad (now PATH), which had opened in 1908, from its current terminus of 33rd Street and Sixth Avenue to Grand Central.[18] The H&M platforms would have been directly below the 42nd Street Line's platforms, but above the IRT's Flushing Line platforms. However, by 1909, the IRT had constructed an unauthorized ventilation shaft between the 42nd Street line and the Steinway Tunnel. This would force the H&M to build its station at a very low depth, thus making it harder for any passengers to access the H&M station.[19] As an alternative, it was proposed to connect the Uptown Tubes to the Steinway Tunnel.[20]

A franchise to extend the Uptown Tubes to Grand Central was awarded in June 1909, with the expectation that construction could start within six months and that the new extension would be ready by January 1911.[21] However, by 1914, the H&M had not started construction of the Grand Central extension yet, and it wished to delay the start of construction further.[22] By 1920, the H&M had submitted seventeen applications in which they sought to delay construction of the extensions; in all seventeen instances, the H&M had claimed that it was not an appropriate time to construct the tube.[23] This time, however, the Rapid Transit Commissioners declined this request for a delay, effectively ending the H&M's right to build an extension to Grand Central.[24]

Planned improvements

As part of the construction of One Vanderbilt at the corner of Vanderbilt Avenue and 42nd Street, developer SL Green Realty is making several upgrades to the station. The improvements entail multiple new entrances and exits, including two staircases to the southeast corner of Lexington Avenue and 42nd Street, as well as an underground entrance directly from One Vanderbilt to the 42nd Street Shuttle platforms. Three new staircases from the mezzanine to the southbound Lexington Avenue Line platform, and one new staircase to the northbound platform, will be added. The project also involves reconfiguration of columns supporting the nearby Grand Hyatt New York hotel at the southeast corner of the station, destruction of 40% of the Hyatt's basement to expand the subway mezzanine, and the thinning of columns on platforms and mezzanines to increase space. A new elevator is being added within the existing Hyatt entrance, and the existing staircase was replaced.[25][26] This would directly result in additional capacity for the station, since 4,000 to 6,000 more subway passengers per hour would be able to use it.[25] These improvements would cost over $200 million.[27][28][29] The MTA mandated the station improvements in exchange for allowing the tower's construction.[26] In 2015, SL Green gave $220 million toward the building's construction, of which two-thirds of the money would be used for station redesign;[30][31] this marked the largest private investment to date to the New York City Subway system.[25] The upgrades are estimated to be completed by 2021.

A new mezzanine built below the existing mezzanine will provide a direct connection from the subway station to the lower level of Grand Central Terminal and the future Long Island Rail Road concourse built as part of the East Side Access project; this will replace the current escalators from the existing mezzanine directly to the Flushing Line platforms, and is estimated to cost $75–150 million.[32]

As part of the construction of the Second Avenue Subway, a transfer might be included between here and the 42nd Street station on that line. This would provide a transfer to the T train, which is proposed to serve Phase 3 of the Second Avenue Subway (which is currently not funded or scheduled). Currently, the transfer is under evaluation.[33][34] The 900-foot long[35] transfer passageway would run under 42nd Street between Second Avenue and Third Avenue, connecting to the IRT Flushing Line platform. Up to four properties might need to be required for the necessary ancillaries and emergency exits to built.[36] The passageway would run under the northern side of 42nd Street, and the exit at the eastern end would be on the northwestern corner of that street and Second Avenue.[37] Under a plan for the line in the 1990s, a spur to Grand Central Terminal was considered, which would have turned off Second Avenue at 44th Street as a way to divert riders from the 4 and 5 routes, which run express on the Lexington Avenue Line. Service on this spur could not be as frequent as that on Lexington Avenue as there would not be enough capacity on Second Avenue, and as a result this plan was dropped.[38]

IRT 42nd Street Shuttle platforms

 Grand Central
 
New York City Subway station (rapid transit)
Passengers exit a 42nd Street shuttle, and walk toward Grand Central Terminal
Station statistics
DivisionA (IRT)
LineIRT 42nd Street Shuttle
Services      S  (all except late nights)
Platforms2 island platforms
Tracks3
Other information
OpenedOctober 27, 1904 (1904-10-27)[39]
Rebuilt1966 (1966) (after fire)[40]
Station code469[2]
Accessible ADA-accessible to mezzanine only; platforms are not ADA-accessible
Wireless service[3]
Opposite-direction transfer availableN/A
Former/other names42nd Street–Grand Central
Station succession
Next westTimes Square: S 
Next east(Terminal): S 
33rd Street: no regular service
Track layout
to Times Square
End of former track 2
to 33 St

The Grand Central shuttle platforms date from the original IRT subway, completed in 1904. It was originally a four-track express stop with two island platforms between the local and express tracks.[39] The present configuration of the shuttle has three tracks coming into the station; the old southbound express track (track 2) was removed. The two platforms connect directly, as tracks 3 and 4 terminate at bumper blocks. Island platforms are located between both pairs of tracks; the southernmost platform is extra wide, covering the area where track 2 had been located.

Track layout

There is no connection between the northbound local track (track 4) and the other two. West of the station, there is a track connection from the northbound express track 3 to the southbound local track 1.

The southbound local track (track 1) merges with the southbound local track of the Lexington Avenue Line. This merge is used to supply rolling stock to shuttle tracks 1 and 3, and occasionally during special railfan excursions. The other three original tracks followed similar paths until the Lexington Avenue Line was extended north, turning this part of the line into a shuttle.[41]

History

The station opened on October 27, 1904.[39] The opening of the Grand Central shuttle platforms actually predate the terminal itself, as the construction of Grand Central Terminal was completed in 1913.[42]

In 1913, as part of the Dual Contracts, the New York City Public Service Commission planned to split the original IRT system into three segments: two north-south lines, carrying through trains over the Lexington Avenue and Broadway–Seventh Avenue Lines, and a west-east shuttle under 42nd Street. This would form a roughly "H"-shaped system. A new platform for the shuttle would be built close to the current Lexington Avenue Line station.[43] Since there was 400 feet between the eastern end of the original line's station and the new Lexington Avenue Line station, a new shuttle station was to be built near the Lexington Avenue Line station. The construction of the narrow island platform station required building two new trackways extending east under 42nd Street. Although the platform was constructed, it was never used.[44] On August 1, 1918, the Dual Contracts' "H system" was put into service. The station was not ready in time, and therefore wooden flooring was temporarily laid over sections of the trackways at Times Square and Grand Central.[45] The shuttle was heavily used, and the crowding conditions were so bad that the shuttle was ordered closed the next day.[46]

The shuttle reopened September 28, 1918.[47] Track 2 at the Grand Central station was covered over by a wooden platform.[48] A New York Times columnist later said that former southbound express track 2 was still usable for the first few hours of the shuttle's operation, but the wooden platform was placed over that track later the same day to allow shuttles to use former northbound express track 3, due to high demand for the shuttles on the former local tracks, numbered 1 and 4.[49]

On February 12, 1946 work began to double the width of the passageway connecting the shuttle platforms and the main mezzanine over the Lexington Avenue Line platforms. As part of the work the wooden passenger walkway, which had an average width of 15 feet (4.6 m) was replaced by a 37 feet (11 m) wide passageway with concrete flooring. This walkway had been "temporary" when it was put into place in August 1918. The new 350 feet (110 m)-long passageway covered most of the trackways used by downtown trains of the Original Subway prior to 1918. The iron railings along the planked walkway were removed. The project cost $45,800 and was intended to ease congestion. As part of the project, the upper passageway was moved to within fare control to allow passengers to go between the subway mezzanine and the entrance to Grand Central Terminal at the shuttle without paying a fare. This was accomplished by moving the turnstiles at the eastern end of the passageway.[50] In March, members of the Metallic Lathers Union Local 46 sought to halt construction on the project, which was 80 percent complete, as the union objected to having the work done by city employees who made less than union workers.[51] The rebuilt passageway opened on March 18, 1946.[52] Track 2 between this station and Times Square–42nd Street was removed in 1975.[44]

The station suffered a severe fire on April 21, 1964, which destroyed the automated train being tested in the 42nd Street Shuttle at the time.[53][54] The fire began under a shuttle train on track 3, and it became larger, feeding on the wooden platform. The basements of nearby buildings were damaged.[48] Tracks 1 and 4 returned to service on April 23, 1964,[55] while Track 3 returned to service on June 1, 1964.[56] The reinstallation of Track 3 was delayed because of the need to replace 60 beams that were damaged in the fire.[57] From September 19, 1966 to April 1967, service on the shuttle was limited in order to allow for the reconstruction of parts of the line. The entire project cost $419,000 and included the construction of a new mezzanine at Grand Central.[58] As part of the project, the tiles damaged by the smoke from the fire were replaced with tiles in the city's colors of blue, white and orange, with black tiles interspersed. In addition, fluorescent lighting, which was 12 times brighter than the old lighting, was installed.[40]

Accessibility status

The Grand Central shuttle platforms are actually wheelchair accessible as the mezzanine elevators are on the same level, but due to the platforms at Times Square being inaccessible, the 42nd Street Shuttle itself is not accessible. As part of the 2015–2019 MTA Capital Program, the 42nd Street Shuttle will become ADA accessible, and the shuttle will be reconfigured from three tracks to two tracks, and the trains will become six cars long. The whole project will cost $235.41 million.[59] The cost of this part of the project is $30 million.[59][25][60] By December 2016, the project was delayed, with construction set to start in December 2019 and be completed by September 2022.[61][62] A construction contract was awarded on March 7, 2019, with an estimated completion date of March 2022.[63]

Filming location

This section of the complex is frequently used for movie shooting when it is closed. Notable scenes include a famous scene in the 1971 film The French Connection, an episode of Fringe, an episode of Person of Interest, and an episode of 30 Rock (filling in for 47th–50th Streets–Rockefeller Center station).

IRT Lexington Avenue Line platforms

 Grand Central–42 Street
 
New York City Subway station (rapid transit)
5 train departing
Station statistics
DivisionA (IRT)
Line      IRT Lexington Avenue Line
Services      4  (all times)
      5  (all times except late nights)
      6  (all times) <6>  (weekdays until 8:45 p.m., peak direction)
Platforms2 island platforms
cross-platform interchange
Tracks4
Other information
OpenedJuly 17, 1918 (1918-07-17)[64]
Station code402[2]
Accessible ADA-accessible (transfer to 42nd Street Shuttle not accessible)
Wireless service[3]
Opposite-direction transfer availableYes
Former/other names42nd Street–Grand Central
Diagonal Station
Station succession
Next north59th Street (express): 4  5 
51st Street (local): 4  6  <6>
Next north125th Street (express): 4  5 
51st Street (local): 4  6  <6>
Next south33rd Street (local): 4  6  <6>
14th Street–Union Square (express): 4  5 
Next south28th Street (local): 4  6  <6>
Brooklyn Bridge–City Hall (express): 4  5 
Track layout
to 51 St
to 59 St
Express tracks descend
to lower level
to shuttle platforms
to 33 St
to 14 St
Upper level, existing track
Upper level, former track
Lower level, existing track

Grand Central–42nd Street is an express station on the IRT Lexington Avenue Line. It was also known as the Diagonal Station at time of construction, being oriented 45° from the street grid.[65] It has two island platforms, four tracks, and includes a crossover and a crossunder. The columns and beams here are massive, in order to support part of Grand Central Terminal and the office towers next to it.

On one wall, there is a stylized steam locomotive mosaic. The northbound platform's side wall includes tile depicting a big passageway; the first room, as seen from the platform, has doors to a second room which appears to be a mechanical room. There is a correctly oriented compass rose inlaid on the floor of the mezzanine.

The Grand Central complex is home to the master tower which controls the entire Lexington Avenue Line, located south of the Lexington Avenue Line platforms.

Track layout

The southbound local track south of the station merges into the original downtown local track from the 42nd Street Shuttle. The track was part of the original four-track IRT subway. This track is now used for moving trains to and from the shuttle and for launching railfan trips from the shuttle tracks. This was the only track that is preserved.

Just south of the station, the tracks split, with two on each side of the 1870 New York and Harlem Railroad Murray Hill Tunnel which is now used for automobile traffic on Park Avenue.

The uptown tracks are about ten feet below the original grade at the point where they turn off. The old uptown express and local trackways that used to lead to the 42nd Street Shuttle are visible from the uptown local track. As the alignment of the original trackways curves into the old Grand Central station on the 42nd Street Shuttle, it passes through the rebuilt area for the proposed Grand Central station shuttle platform. From the public passageway, none of the original support columns and roof are visible, since they were removed in exactly this area to open the way for the unused shuttle station. The unused ramps leading from the 42nd Street Shuttle are still in place, just south of this station.

History

The station was first proposed in March 1913 as part of the Dual Contracts.[43] As originally proposed, it ran diagonally under the former Children's Hospital on the north side of 42nd Street east of Park Avenue. The route would connect the original subway under Park Avenue, on the west, to the new line under Lexington Avenue, on the east, at a point between 43rd and 44th Streets. In April 1913 the plan was modified to run diagonally between Park Avenue just south of 42nd Street to Lexington Avenue near 43rd Street.[66] The new alignment also ran under the Grand Union Hotel at the southeast corner of 42nd Street and Park Avenue.[67] The Public Service Commission voted on the modification in June 1913.[68] A modified route that instead made an S-curve under 40th Street was adopted that November.[69]

The Commission voted in favor of the original diagonal route in February 1914,[70] at which point the Grand Union Hotel was condemned via eminent domain.[71] The condemnation proceedings for the hotel cost $3.5 million, then a very high sum.[72] To pay the station's construction cost, the Public Service Commission approved the construction of a 25-story building above the station.[73] The station opened on July 17, 1918.[64] The structure was not erected as proposed; it would later become the Pershing Square Building, which opened in 1923.[74]

In 1955, the New York City Transit Authority had a scheme to make a lower level to the station, also of four tracks.[75] It would tap into the express tracks beyond the station and be used as an intermediate terminal stop for certain services. There is room between the station and the Flushing Line for such a new level.

IRT Flushing Line platform

 Grand Central–42 Street
 
New York City Subway station (rapid transit)
View from the end of the platform, looking west
Station statistics
DivisionA (IRT)
Line      IRT Flushing Line
Services      7  (all times) <7>  (rush hours until 9:30 p.m., peak direction)
Platforms1 island platform
Tracks2
Other information
OpenedJune 22, 1915 (1915-06-22)[1]
Station code465[2]
Accessible ADA-accessible (transfer to 42nd Street Shuttle not accessible)
Wireless service[3]
Opposite-direction transfer availableYes
Former/other names42nd Street–Grand Central
Station succession
Next eastVernon Boulevard–Jackson Avenue: 7  <7>
Next eastCourt Square: 7  <7>
Next westFifth Avenue: 7  <7>
Next westTimes Square–42nd Street: 7  <7>
Track layout
to Vernon–Jackson
Trolley loop
to 5 Av

Grand Central–42nd Street (signed as 42nd Street–Grand Central) on the Flushing Line has a single island platform and two tracks.

There is a large arched ceiling, similar to other deep-level stations in the system and in other parts of the world. Along the platform are stairs and escalators to other lines and to a mezzanine and passageways under the Grand Central Terminal concourse. Exits and entrances are located at the center, west and east ends of the platform. There is an ADA-accessible elevator toward the west end. A newsstand/snack shop is located on the platform towards the east end.

The light and signage fixture that runs along the length of the platform is an art installation, entitled V-Beam, designed by Christopher Sproat.

History

In 1913, the Public Service Commission planned to connect the Flushing line to the 42nd Street shuttle, just west of the Grand Central station. Some ramp work was built for this purpose, then converted to a passenger walkway that has been in use since 1916.[44] In addition, there are two remaining sections of the old trolley loop that remain intact and are accessible to MTA personnel via the southbound track approximately 200 feet beyond the station.[76] The third is between the tracks and is a pump room. Parts of the loop were converted into CBTC circuit breaker rooms.[77]

On March 2, 1950, a new type of stainless steel portable newsstand was installed at the Flushing Line platform at Grand Central. The newsstand was owned by the Union News Company.[78]

The platforms at Grand Central and all other stations on the Flushing Line with the exception of Queensboro Plaza were extended in 1955–1956 to accommodate 11-car trains.[79]

IRT Third Avenue Line transfers

For a while, free transfers were provided between the subway station and 42nd Street on the elevated IRT Third Avenue Line. This started on June 14, 1942, the day after the IRT Second Avenue Line, which provided access to Queensboro Plaza and the IRT Flushing Line, was closed. The Third Avenue Line closed on May 12, 1955, rendering the transfer obsolete.[80]

Foiled terrorist attack

Najibullah Zazi and alleged co-conspirators were arrested in September 2009 as part of an al-Qaeda Islamist plan to engage in suicide bombings on trains in the New York City subway system, including near the Grand Central station and the Times Square–42nd Street/Port Authority Bus Terminal station during rush hour that month, and Zazi has pleaded guilty.[81][82][83][84]

References

  1. New York Times, Steinway Tunnel Will Open Today, June 22, 1915, page 10
  2. "Station Developers' Information". Metropolitan Transportation Authority. Retrieved June 13, 2017.
  3. "NYC Subway Wireless – Active Stations". Transit Wireless Wifi. Retrieved November 13, 2019.
  4. Attached PDF to "Governor Cuomo Announces Wireless Service and New "Transit Wireless WiFi" in Queens and Manhattan Subway Stations", governor.ny.gov
  5. "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
  6. "MTA Neighborhood Maps: Midtown East/Grand Central" (PDF). mta.info. Metropolitan Transportation Authority. 2015. Retrieved July 17, 2015.
  7. "MTA Guide to Accessible Transit". MTA.info. Retrieved June 1, 2011.
  8. Donohue, Pete (August 4, 2006). "Cooler Subways Coming – Eventually". Daily News. New York. Retrieved February 28, 2010.
  9. Roberts, Sam (September 30, 2013). "No Heel Hazards (or Gusts) as Subway Expands". New York Times. New York. Retrieved May 5, 2014.
  10. Bereznak, Alyssa. "Check Out New York City's First Touchscreen Subway Map". Yahoo! Tech. Retrieved February 21, 2014.
  11. "MTA's First "On The Go" Touchscreen Unveiled In Bowling Green". NY1. September 19, 2011. Archived from the original on September 12, 2012. Retrieved October 5, 2011.
  12. "MTA Introduces New On the Go! Touch-Screen Travel Station". MTA.info. September 19, 2011. Retrieved October 5, 2011.
  13. Brian Sozzi. "Sozzi: The Boring Old Subway is Now Digital, and That's Pretty Awesome". TheStreet.
  14. Cox, Jeremiah. "Grand Central-42nd Street". Retrieved October 4, 2013.
  15. "One Vanderbilt Renderings: Before and After". Second Ave. Sagas.
  16. Chaban, Matt A. (October 16, 2016). "Future Neighbor Will Tower Over Grand Central, but Allow It to Shine". The New York Times. ISSN 0362-4331. Retrieved October 19, 2016.
  17. "TWO NEW SUBWAYS NOW BEING PLANNED; Interborough and McAdoo Interests Likely to Build East and West Side Systems. COMPLETE UNIFIED SYSTEM Traction Interests Disclaim Anything More Than a Tentative Interest at This Time". The New York Times. February 14, 1909. Retrieved April 24, 2018.
  18. "INTER-TUNNEL SHAFT IN M'ADOO'S WAY; Connects Subway and Steinway Tunnel Through Third Level Under 42d Street. WHO AUTHORIZED IT THERE? Public Service Board Likely to Ask Questions -- If It Stays, McAdoo People Must Go Lower". The New York Times. March 26, 1909. Retrieved April 24, 2018.
  19. "MAY CONNECT M'ADOO AND STEINWAY TUBES; Utilities Board Suggests Such a Junction to the Board of Estimate. McADOO FRANCHISE SAFE Commission Says the 42d Street Extension Won't Interfere with Other Subways". The New York Times. May 6, 1909. ISSN 0362-4331. Retrieved April 24, 2018.
  20. "M'ADOO EXTENSION TO BE READY IN 1911; Head of Hudson & Manhattan Road Promises It After the Board of Estimate Approves. BUSINESS MEN GRATIFIED Mr. McAdoo Also Happy -- He Will Begin at Once to Complete the Jersey-Grand Central Route". The New York Times. June 5, 1909. ISSN 0362-4331. Retrieved April 24, 2018.
  21. "M'ADOO'S RAILROAD SLOW IN BUILDING; Two Months More Time Given for Extension to Grand Central". The New York Times. April 9, 1914. ISSN 0362-4331. Retrieved April 25, 2018.
  22. "HUDSON TUBE ASKS DELAY.; Seventeenth Application for More Time to Extend Subway". The New York Times. February 16, 1920. Retrieved April 27, 2018.
  23. Cudahy, Brian J. (2002), Rails Under the Mighty Hudson (2nd ed.), New York: Fordham University Press, pp. 55–56, ISBN 978-0-82890-257-1, OCLC 911046235
  24. Barone, Vincent; Pereira, Ivan (October 17, 2016). "A glimpse at One Vanderbilt's transit improvements". am New York. Retrieved October 19, 2016.
  25. Hawkins, Andrew J. "$210M upgrade for Grand Central's subway unveiled". Crain's New York Business. Retrieved August 1, 2017.
  26. "A sneak peek at One Vanderbilt's Grand Central plan - New York Post". New York Post. September 8, 2014. Retrieved September 13, 2014.
  27. "A glimpse at the $200M transit plans for One Vanderbilt :: Second Ave. Sagas". Second Ave. Sagas. Retrieved September 13, 2014.
  28. "One Vanderbilt Comes with $200M of Subway Improvements - In Transit - Curbed NY". Curbed NY. Retrieved September 13, 2014.
  29. Whitford, Emma. "Inside The $220 Million Plan To Improve The Subway At Grand Central". Gothamist. Archived from the original on October 21, 2016. Retrieved October 19, 2016.
  30. Fitzsimmons, Emma G. (May 27, 2015). "Plan to Build Tower at Grand Central in Exchange for Transit Upgrades Is Approved". The New York Times. Retrieved February 9, 2018.
  31. "Potential East Midtown Transit Improvements" (PDF). www.cb5.org. Metropolitan Transportation Authority. October 2012. pp. 24, 31, 32, 33, 34. Archived from the original (PDF) on January 6, 2017. Retrieved February 8, 2018.
  32. "Second Avenue Subway Final Environmental Impact Statement (FEIS): Figure 2-1: New York City Subway Service with Second Avenue Subway Line" (PDF). mta.info. Metropolitan Transportation Authority. May 2004. Retrieved December 15, 2016.
  33. "Second Avenue Subway Final Environmental Impact Statement (FEIS): Chapter 2: Project Alternatives" (PDF). mta.info. Metropolitan Transportation Authority. May 2004. Retrieved August 5, 2015.
  34. "Second Avenue Subway Final Environmental Impact Statement (FEIS): Chapter 3: Description of Construction Methods and Activities" (PDF). mta.info. Metropolitan Transportation Authority. May 2004. Retrieved February 9, 2018.
  35. "Second Avenue Subway Final Environmental Impact Statement (FEIS): Figure F-10 Second Avenue Subway Potential 42nd Street Transfer Study Area for Potential Acquisitions" (PDF). mta.info. Metropolitan Transportation Authority. May 2004. Retrieved January 6, 2017.
  36. "Second Avenue Subway Final Environmental Impact Statement (FEIS): Figure 8-11 Second Avenue Subway Transfer to 42nd Street Grand Central Station" (PDF). mta.info. Metropolitan Transportation Authority. May 2004. Retrieved January 6, 2017.
  37. "Manhattan East Side Transit Alternatives (MESA)/Second Avenue Subway Summary Report" (PDF). mta.info. Metropolitan Transportation Authority. October 11, 2001. Retrieved August 9, 2016.
  38. "Our Subway Open: 150,000 Try It; Mayor McClellan Runs the First Official Train". The New York Times. October 28, 1904. p. 1. ISSN 0362-4331. Retrieved April 21, 2020.
  39. Callahan, John P. (December 11, 1966). "New Look Dawns At Grand Central; Bleak Shuttle Area Cheered by Tiles in City's Colors". The New York Times. ISSN 0362-4331. Retrieved August 6, 2019.
  40. Dougherty, Peter (2020). Tracks of the New York City Subway 2020 (16th ed.). Dougherty. OCLC 1056711733.
  41. "With the Surrounding Buildings It Covers an Area of Thirty City Blocks -- Can Accommodate 100,000,000 People a Year". The New York Times. February 2, 1913. ISSN 0362-4331. Retrieved December 20, 2018.
  42. "MONEY SET ASIDE FOR NEW SUBWAYS; Board of Estimate Approves City Contracts to be Signed To-day with Interboro and B.R.T." (PDF). The New York Times. March 19, 1913. ISSN 0362-4331. Retrieved November 10, 2017.
  43. Brennan, Joseph (2002). "Abandoned Stations: proposed Grand Central shuttle platform". Columbia University. Retrieved March 3, 2017.
  44. "Open New Subway Lines to Traffic; Called a Triumph" (PDF). The New York Times. August 2, 1918. p. 1. ISSN 0362-4331. Retrieved October 4, 2011.
  45. "Drop Shuttle Plan as Subway Crush Becomes a Peril" (PDF). The New York Times. August 3, 1918. p. 1. ISSN 0362-4331. Retrieved October 4, 2011.
  46. "Shuttle Service In Operation". pudl.princeton.edu. Interborough Rapid Transit Company. September 27, 1918. Retrieved September 19, 2016.
  47. Buckley, Thomas (April 22, 1964). "Pavement in 42d Street at Grand Central Is Weakened by Early‐Morning Fire in the IRT Shuttle Station". The New York Times. ISSN 0362-4331. Retrieved January 15, 2016.
  48. Berger, Meyer (January 17, 1955). "About New York; Hudson Sandhogs in Compressed Air Today -- The Shuttle's Missing Track 2". The New York Times. ISSN 0362-4331. Retrieved April 8, 2018.
  49. "WIDER WALK TO AID RIDERS OF SHUTTLE; Corridor From Grand Central End of Line to Lexington Trains Being Doubled CLEAN-UP DRIVE IS BEGUN Transportation Board Opens Campaign to Curb Litter, Improve Car Lighting Part of New Traffic Plan Wooden Barrier to Go". The New York Times. February 12, 1946. ISSN 0362-4331. Retrieved April 4, 2018.
  50. "Union Fails to Halt Subway Shuttle Job". The New York Times. March 12, 1946. ISSN 0362-4331. Retrieved April 4, 2018.
  51. "SUBWAY CEREMONY COSTS O'DWYER 5C; Mayor Pays at the Turnstile in Dedicating New Tunnel to Times Square Shuttle MORE IMPROVEMENTS DUE Pleased With Grand Central Project, He Says Progress Will Take Money". The New York Times. March 19, 1946. ISSN 0362-4331. Retrieved April 4, 2018.
  52. Stengren, Bernard (April 22, 1964). "Shuttle Is Short, Except In History". The New York Times. ISSN 0362-4331. Retrieved January 15, 2017.
  53. "Subway Fire Jams N. Y. Traffic (April 22, 1964)". Chicago Tribune. April 22, 1964. Retrieved January 17, 2017.
  54. Trumbull, Robert (April 24, 1964). "Shuttle Nearly Back to Normal". The New York Times. ISSN 0362-4331. Retrieved January 15, 2017.
  55. Cunningham, Joseph; DeHart, Leonard O. (January 1, 1993). A History of the New York City Subway System. J. Schmidt, R. Giglio, and K. Lang.
  56. "Reopening Put Off on One 42d St. Block". The New York Times. April 25, 1964. ISSN 0362-4331. Retrieved January 15, 2017.
  57. "Reconstruction Cuts Shuttle Service in Subway; 8-Month Project Curtailing Daily Travel of 24,400-- Job Will Cost $419,000" (PDF). The New York Times. October 9, 1966. ISSN 0362-4331. Retrieved January 15, 2017.
  58. "Metropolitan Transportation Authority (MTA) Notice of Public Hearing and Description of Projects – Tuesday, August 23, 2016 4:30 P.M. – Request for Federal Financial Assistance Under the Federal Transportation Authorization For Federal Fiscal Year 2017 Capital Improvement Projects" (PDF). mta.info. Metropolitan Transportation Authority. July 28, 2016. Archived from the original (PDF) on August 17, 2016. Retrieved August 7, 2016.
  59. "MTA Capital Program 2015-2019" (PDF). mta.info. Metropolitan Transportation Authority. October 28, 2015. Retrieved December 17, 2016.
  60. "Transit and Bus Committee December 2016" (PDF). mta.info. Metropolitan Transportation Authority. February 21, 2017. Archived from the original (PDF) on February 22, 2017. Retrieved February 21, 2017.
  61. "T7041404 Reconstruction of Times Square Shuttle - Phase 3". web.mta.info. Metropolitan Transportation Authority. Retrieved September 3, 2017.
  62. "Capital Program Oversight Committee Meeting - March 2019" (PDF). mta.info. Metropolitan Transportation Authority. March 25, 2019. p. 11. Retrieved September 23, 2018.
  63. "Lexington Av. Line to be Opened Today". The New York Times. July 17, 1918. p. 13. ISSN 0362-4331. Retrieved April 21, 2020.
  64. "CONTRACT FOR SUBWAY LINK: Award Made for Diagonal Station at Grand Central". The New York Times. October 10, 1914. Retrieved July 15, 2016.
  65. "ALTER SUBWAY PLAN AT GRAND CENTRAL; New Express Station Will Be in Lexington Avenue, from 42d to 43d Street". The New York Times. April 9, 1913. ISSN 0362-4331. Retrieved October 19, 2019.
  66. "PLAN NEW BUILDING ON GRAND UNION SITE; Syndicate Formed by Morgenthau Seeks to Buy Hotel Property for Office Structure". The New York Times. July 25, 1913. ISSN 0362-4331. Retrieved October 19, 2019.
  67. "BOARD AGAIN VOTES FOR DIAGONAL PLAN; Hurries Action on Subway Connection at the Grand Central Station". The New York Times. June 28, 1913. ISSN 0362-4331. Retrieved October 19, 2019.
  68. "ADOPTS NEW ROUTE TO LINK SUBWAYS; Service Board Approves Alternative Connection at 40th St. for Lexington Av. Line. FEARS OTHER ROUTE'S COST Plans Announced for Temporary Operation of Steinway Tunnel to Long Island City". The New York Times. November 15, 1913. ISSN 0362-4331. Retrieved October 19, 2019.
  69. "DIAGONAL ROUTE FOR SUBWAY LINK; Connection for Old and New East Side Lines Decided On by Service Board". The New York Times. February 7, 1914. ISSN 0362-4331. Retrieved October 19, 2019.
  70. "The Passing of Old Hotels" (PDF). The Real Estate Record: Real estate record and builders' guide. 93 (2407): 818. May 5, 1914 via columbia.edu.
  71. "ADDED SUBWAY COST WAS ANTICIPATED; City Could Not Prevent $10,000,000 Increased Interest, McAneny Says. WHITNEY EXPLAINS DELAYS Commission's Secretary Says $20,000,000 Increase Over Estimate Is Small on $350,000,000 Job". The New York Times. December 13, 1915. ISSN 0362-4331. Retrieved October 19, 2019.
  72. "PLANS SUBMITTED FOR SUBWAY LINK; Provide Joining of Old and New Tubes with Extension of Steinway Tunnel. TIMES SQUARE CONNECTION Grade Crossing of Rails Avoided In Bore Through Solid Rock -Sent to Interborough". The New York Times. August 10, 1914. ISSN 0362-4331. Retrieved October 19, 2019.
  73. "Pershing Square Building" (PDF). New York City Landmarks Preservation Commission. November 25, 2016. pp. 1–2, 7. Retrieved October 19, 2019.
  74. Levey, Stanley (March 11, 1955). "TRANSIT PROJECTS STIR AGENCY FEUD; Plans for Four Subway Projects Stir Quarrel in Transit Board". The New York Times. ISSN 0362-4331. Retrieved March 10, 2018.
  75. "www.nycsubway.org". www.nycsubway.org.
  76. "mta.info - 7 Line Work & Planned Service Changes". mta.info.
  77. "Queensboro Subway Gets A Portable Newsstand" (PDF). New York Times. March 2, 1950. Retrieved February 21, 2016.
  78. Authority, New York City Transit (January 1, 1955). Minutes and Proceedings.
  79. 'El' Will Cease Saturday, New York Times June 7, 1942 page 31
  80. Karen Zraik, David Johnston (September 15, 2009). "Man in Queens Raids Denies Any Terrorist Link". New York Times. Archived from the original on September 21, 2009.
  81. David Johnston, Al Baker (September 18, 2009). "Denver Man Admits to a Possible Al Qaeda Connection, Officials Say". The New York Times. Archived from the original on September 21, 2009.
  82. David Johnston, William K. Rashbaum (September 20, 2009). "Terror Suspect Had Bomb Guide, Authorities Say". The New York Times. Archived from the original on September 21, 2009.
  83. Zazi Reveals Details Of Foiled Terror Plot Archived April 13, 2010, at the Wayback Machine–retrieved from NY1 local news channel on December 4, 2010

Further reading

  • Stookey, Lee (1994). Subway ceramics : a history and iconography of mosaic and bas relief signs and plaques in the New York City subway system. Brattleboro, Vt: L. Stookey. ISBN 978-0-9635486-1-0. OCLC 31901471.

Media related to Grand Central – 42nd Street (New York City Subway) at Wikimedia Commons

Google Maps Street View
43rd Street and Lexington Avenue entrance via Hyatt Hotel
42nd Street and Lexington Avenue entrance (NW corner)
42nd Street and Lexington Avenue entrance (NE corner)
42nd Street and Lexington Avenue entrance (SE corner)
42nd Street and Third Avenue entrance
42nd Street and Vanderbilt Avenue entrance
42nd Street and Vanderbilt Avenue entrance in office building
Ex-Bowery Savings Bank entrance
Entrance between Madison Avenue and Fifth Avenue
Park Avenue entrance
Entrance in Grand Central Terminal
Lexington Avenue Line platforms
Flushing Line platform
Mezzanine
42nd Street Shuttle platforms

nycsubway.org:

Various:

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.