Highways in Greece
Highways in Greece are generally organized so that the odd-numbered highways are of north-south alignment and even numbered highways are of east-west alignment. However, there are many exceptions.
The designation of some important roads of Greece as "national" was decided by a 1955 decree, while a minister's decision in 1963 determined the numbering of these roads. In 1998, a survey of the Hellenic Statistical Authority defined some new national roads that were constructed after the 1963 decision. Furthermore, motorway numbers in Greece are different and irrelevant to other highways' numbers. For example, Motorway 6 (A6) refers to the Attiki Odos motorway, while "GR-6" refers to National Road 6.
With a total length of about 2.500 km as of 2017, Greece's motorway network is the biggest one in Southeastern Europe and one of the most advanced in Europe.[1]
Motorways
Greece's motorway network has been extensively modernized throughout the 2000s and part of it is still under construction. Most of it was completed by early 2017. There are a total of 10 main routes throughout the Greek mainland and Crete, from which some feature numerous branches/auxiliary routes, as described in the listing below.
Greek motorways according to ministerial decree of 2015
Name | Connecting cities | progress | notes |
---|---|---|---|
Athens - Thessaloniki - Evzonoi |
Athens, Thebes, Chalkis, Lamia, Volos, Larissa, Katerini, Thessaloniki | 550/550 km
342/342 mi |
Completed
Section Chalastra - Evzonoi is an expressway |
Egnatia Odos |
Igoumenitsa, Ioannina, Grevena, Kozani, Veria, Thessaloniki, Kavala, Xanthi, Komotini, Alexandroupoli | 670/670 km.
416/416 mi. |
Completed |
Central Greece Motorway |
Lamia, Karditsa, Trikala | 80/175 km
50/109 mi |
Sections Trikala - |
Ionia Odos |
Patras, Missolonghi, Arta, Ioannina | 196/196 km
122/122 mi |
Completed |
Attiki Odos |
Attica | 48/48 km
30/30 mi |
Completed |
Central Peloponnese Motorway |
Corinth, Argos, Tripoli, Kalamata | 149/149 km
93/93 mi |
Completed |
Olympia Odos |
Athens, Corinth, Patras | 205/279 km
127/173 mi |
|
Schimatari - Chalkis |
Chalkis | 11/26 km
7/16 mi |
Chalkis bypass is under planning |
Velestino - Volos |
Volos | 0/40 km
0/25 mi |
Upgrade under planning |
Thebes - Eleusis |
Thebes, Eleusis | 0/40 km
0/25 mi |
Under planning. |
Thessaloniki - Nea Moudania |
Thessaloniki, Nea Moudania | 72/72 km
45/45 mi |
Completed
No emergency lane, green signs |
Thessaloniki - Serres - Promachonas |
Thessaloniki, Serres | 105/105 km
62/62 mi |
Completed
Section Kato Christos - Sidirokastro upgrade under planning |
Kozani - Ptolemaida - Niki |
Kozani, Ptolemaida, Florina | 40/79 km
25/49 mi |
Sections Kozani - Ptolemaida and Florina - Niki completed
Section Ptolemaida - Florina under planning to be upgraded |
Siatista - Krystallopigi |
Kastoria, Kozani, Florina | 72/72 km
45/45 mi |
Completed |
Ymittos - Rafina |
Attica | 13,5/20 km
8,4/12 mi |
Completed
Sections Pikermi - Rafina and southern expansion under planning |
Koropi - Aerodromio |
Athens International Airport | 6/6 km
4/4 mi |
Completed |
Lefktro - Sparti |
Tripoli, Sparta | 45,5/45,5 km
28/28 mi |
Completed |
Northern Cretan Motorway |
Chania, Rethymno, Heraklion | 41/310 km
25/193 mi |
Upgrade under construction/planning |
Raidestos - Thessaloniki International Airport |
Thessaloniki | 3/3 km
2/2 mi |
Completed
Pre-existing section is not a motorway |
Attiki Odos western branch |
Attica | 2,5/2,5 km
1,6/1,6 mi |
Completed |
A1 (Athens - Thessaloniki - Evzonoi)
Motorway 1 (
The full length of this motorway is around 553 km or 346 miles, including 14 km or 8.7 miles of shared route with the A2 (Egnatia Odos). Note that until recently, the "P" in "PAThE" referred to Patras, but the Patra – Athens section has now become part of the A8 (Olympia Odos) motorway, belonging to a different project.[2][3]
- Motorway 11 (
) is a branch of the Motorway 1, connecting it with the city of Chalcis. - Motorway 12 (
) is a planned branch of the Motorway 1, connecting it with the city of Volos. Upgrade of the pre-existing section is under way. - Motorway 13 (
) is a planned branch of the Motorway, from Thiva to Elefsina; connecting it with the Olympia Odos motorway and serving as a western bypass of Athens Metropolitan Area.
A2 (Egnatia Odos)
Motorway 2 (
Specifically, there are auxiliary routes to Albania and Bulgaria, with the main route leading to Turkey. The Republic of Macedonia is accessed through the A1 (PAThE), as described above, or via Motorway A27 (see below). Another auxiliary route runs close to the Evros river in the prefecture of the same name, reaching a point where Greece's, Turkey's and Bulgaria's borders meet. Some of those auxiliary routes are not yet motorways, but typical 2-lane expressways, although they are of considerably higher quality than other similar expressways in the rest of Greece. The project (including most of the auxiliary routes), was completed in 2009, with the length of the main route being 670 kilometers or 416 miles, making it the longest motorway in Greece.
- Motorway 25 (A25) is a branch of the A2 (Egnatia Odos) and lies between Thessaloniki to the Greek–Bulgarian border crossing, via Serres (taking over parts of the GR-12); and between Thessaloniki towards Nea Moudania, referred to in this part of its section as the Thessaloniki – Nea Moudania Motorway or Chalkidiki Motorway. As it passes through the eastern periphery of Thessaloniki the A25 becomes part of the Thessaloniki Inner Ring Road (Esoteriki Peripheriaki Odos, Greek: Εσωτερική Περιφερειακή Οδός).
- Motorway 27 (A27) is another branch of the A2 (Egnatia Odos), at Kozani which leads towards Ptolemaida and from there to Florina and the border crossing with the Republic of Macedonia at Niki. Within 2012 tenders were announced for the construction of the 14 kilometers section from Florina up to the border crossing with the Republic of Macedonia. Construction of this section started in 2013, finished in 2015 and it was opened to traffic on 20 May 2016. The Ptolemaida - Florina part is currently an expressway, planned to be upgraded to a motorway.
- Motorway 29 (A29) is a branch of the A2 (Egnatia Odos) motorway, connecting it with the city of Kastoria and the Greek–Albanian border crossing at Krystallopigi.
A3
Motorway 3 (
A5 (Ionia Odos)
Motorway 5 (
The route passes through most of western continental Greece, along the Ionian Sea, hence its name "Ionia Odos". Work on the majority of the highway began in spring 2006 and would span six years, to be completed by 2012. Though, because of economic problems of the constructing companies, all construction works were halted in 2011, but since mid-2013 works on the whole of the 196 km motorway started again. The motorway was completed in August 2017.[5][2]
- Motorway 52 (A52) is a branch of the A5 (Ionia Odos) connecting it with the island of Lefkada and the undersea-tunnel of Aktio, leading to Preveza. This motorway section is expected to serve the popular tourist region around the Ambracian Gulf. At 48.6 km (30.2 mi) long, the motorway was expected to finish in 2012, having started construction in 2009. Earthworks were largely completed by April 2012 but structures had not commenced as of that time. In mid-2013, works had begun again, but as of December 2016, problems with funding have kept the road largely behind schedule. The road is now expected to be completed by 2020.
A6 (Attiki Odos)
Motorway 6 (
- Motorway 62 (A62) is a section of the Attiki Odos which branches off at the end of the main A6 route. It basically serves as a corridor from Attiki Odos and Koropi towards the Athens International Airport.
- Motorway 64 (A64) is a section of the Attiki Odos which branches off the main A6 route. It is referred to as the Hymettus Beltway (A64) (Greek: Περιφερειακή Υμηττού), serving parts of eastern Athens, while it is also expected to be extended further southwards to Vouliagmeni and further eastwards towards Rafina.
- Motorway 65 (A65) is a second auxiliary route that branches off the main A6 route. The A64 section of the Attiki Odos is referred to as the Aigaleo Beltway (A65) (Greek: Περιφερειακή Αιγάλεω) and serves parts of western Athens. A small part of the A65 remains still unconstructed, and it is yet unknown when it will be completed.[2][3]
- Motorway 642 (A642) is a small branch of Attiki Odos which connects Attiki Odos with Hymettus Beltway. It serves as a small detour of the main route and its length is 2 km.
A7 (Moreas)
Motorway 7 (
The A7 has recently undergone extensive improvement to full motorway standards. As of December 2012, the motorway section between Corinth and Kalamata is fully constructed and operational. Its total length is 205 kilometers or 127 miles.[2][3]
- Motorway 71 (A71) is a branch of the A7 (Moreas) motorway from Lefktro, connecting it with Sparta. It was opened on 18 April 2016.
A8 (Olympia Odos)
Motorway 8 (
The Elefsina–Corinth section has been completed to motorway standards, while the Corinth – Patras section begun construction in 2008, and was due to be completed in 2012. After construction works had begun again the whole motorway was completed in 2017. It includes the widening and general reconstruction of the GR-8A along with some new tunnels and bridges.[2][3]
A90
Motorway 90 (
National Roads
The National Roads in Greece (Greek: Εθνικές Οδοί) are single carriageway or limited-access roads with one or two traffic lanes for each direction, usually with an emergency lane on each side as well.
- Additional National Roads according to the register of the National Roads 1998
Greek National Road 8A: Athens – Corinth – Patras new road (partly motorway) | |
Greek National Road 16A: Greek National Road 16 – Polygyros | |
Greek National Road 34A: Volos – Portaria - Horefto | |
Greek National Road 111: Agia Triada – Lambia - Lalas - Ancient Olympia |
Current construction projects in Greece
As of autumn 2017, most motorway construction projects all over Greece are completed.
- Part of the Central Greece Motorway was completed in late 2017 at a cost of 1,4 bn euros.
- Olympia Odos and Ionia Odos were both finished and opened to traffic in mid-2017 at a cost of 2,2 bn euros and 1,118 bn euros respectively.
- Moreas Motorway was completed in November 2016, costing a total of 1 bn euros.
- The final construction point of Motorway 1 at the Tempe Valley opened to traffic in April 2017, costing 1,3 bn euros.
Correlation with European routes
This is a list of European routes that shows which parts of them run through Greece.
Major routes:
Other routes:
Kakavia (Albanian border) - | |
Note: When certain highways that carry European routes are replaced with motorways, the European routes will be reassigned to the new motorways. For example, GR-7 carried the E65 from Tripoli to Kalamata. When the Corinth – Tripoli – Kalamata motorway was completed, the E65 numbering was reassigned to it.
See also
References
- ↑ "Αυτοκινητόδρομοι: Δίκτυο 2.500 χιλιόμετρα μέχρι το 2017 - ypodomes.com".
- 1 2 3 4 5 6 7 "Υποδομές - Το μοναδικό website για όλες τις υποδομές στην Ελλάδα - ypodomes.com". www.ypodomes.com.
- 1 2 3 4 5 6 "Motorways - Exit Lists Page". motorways-exitlists.com.
- ↑ ypodomes.com
- ↑ Dervou, Angeliki (2017-08-02). "The last section of "Ionia Odos" motorway to be fully put into operation". ERT International. Retrieved 2017-08-03.