Line 16 (Beijing Subway)

Line 16
 16 
Overview
Other name(s) M16 (planned name)
Type Rapid transit
System Beijing Subway
Status Operational
Locale Haidian District
Beijing
Termini Bei'anhe
Xiyuan (Current)
Wanpingcheng (Future)
Stations 10
Daily ridership 114,000 (2018 Peak)[1]
Operation
Operator(s) Beijing MTR Metro Line 16 Corp., Ltd.
Technical
Track gauge 1,435 mm (4 ft 8 12 in)
Route map
[{{fullurl:{{{1}}}|action=edit}}    ]
Bei'anhe
[{{fullurl:{{{1}}}|action=edit}}    ]
Wenyanglu
[{{fullurl:{{{1}}}|action=edit}}    ]
Daoxianghulu
[{{fullurl:{{{1}}}|action=edit}}    ]
Tundian
[{{fullurl:{{{1}}}|action=edit}}    ]
Yongfeng
[{{fullurl:{{{1}}}|action=edit}}    ]
Yongfeng South
[{{fullurl:{{{1}}}|action=edit}}    ]
Xibeiwang
[{{fullurl:{{{1}}}|action=edit}}    ]
Malianwa
[{{fullurl:{{{1}}}|action=edit}}    ]
Nongdananlu
Line 4, Line 16
[{{fullurl:{{{1}}}|action=edit}}    ]
[{{fullurl:{{{1}}}|action=edit}}    ]
Xiyuan
Wanquanheqiao
Line 10, Line 16
[{{fullurl:{{{1}}}|action=edit}}    ]
Suzhoujie
Suzhouqiao
Wanshousi
Line 4, Line 9, Line 16
[{{fullurl:{{{1}}}|action=edit}}    ]
[{{fullurl:{{{1}}}|action=edit}}    ]
National Library
Line 6, Line 16 Erligou
Ganjiakou
East Gate of Yuyuantan Park
Line 1, Line 16
[{{fullurl:{{{1}}}|action=edit}}    ]
Muxidi
Line 7, Line 16
[{{fullurl:{{{1}}}|action=edit}}    ]
Daguanying
Hongliannanli
Line 14, Line 16 Lize Business District
Line 16
Fangshan line
Fengyiqiao South
Line 10, Line 16
[{{fullurl:{{{1}}}|action=edit}}    ]
Fengtai Railway Station
Line 9, Line 16
[{{fullurl:{{{1}}}|action=edit}}    ]
Fengtainanlu
Fufengqiao
Kandan
Yushuzhuang
Wanpingcheng
The exterior of the Malianwa Station

Line 16 of the Beijing Subway (Chinese: 北京地铁16号线; pinyin: běijīng dìtiě shíliù hàoxiàn) is a rapid transit rail line in Beijing.

Line 16's route will run 49.7 km (30.9 mi) in western Beijing, parallel and to the west of Line 4. Construction began in December 2013.

The North section, from Bei'anhe to Xiyuan was opened on 31 December 2016.[2] An infill station, Nongdananlu was opened on December 30, 2017.[3]

The line is managed by the Beijing MTR Corporation Limited and uses CNR Changchun DKZ93 and CSR Sifang SFM40 eight-car high-capacity wide-body Type A trains.[4] Line 16's color is      dark-moderate green.

History

In 2009, Line 16 was among the 198 major urban planning projects listed by the city’s development and reform commission.[5] At that time, Line 16 was slated to run about 35 km (22 mi) from Huilongguan in Changping District to Huaxiang in Fengtai.[5]

According to the June 2010 plans, the northern section of Line 16 will replace the originally planned Line 4 northern extension and run 48 km (30 mi) from Bei'anhe in Haidian District south to Xiaoyueyuan near the Marco Polo Bridge in Fengtai District.[6] The line would begin near Bei'anhe, and provide access to parts of Haidian, north of the foothills the Western Hills that extend into district. For this reason, that section of the line was also referred to as the Haidian Shanhou (literal translation Haidian Back Mountain) Line because it begins on the backside of the low-lying range that extends from the Fragrant Hills to the Summer Palace.[6] Points of interest that the line may pass along route to Xiaoyueyuan in the south include the Summer Palace, Haidian Gymnasium, National Library, Purple Bamboo Park, Beijing Zoo, Chegongzhuang West Road, Sanlihe, Wanshou Temple, Lize Business District, and the Fengtai railway station.[6] The proposal was scaled back with the removal of the Haidian Shanhou section in December 2010. Reducing the line to just 23 km (14 mi), from Suzhoujie to Wanping, but the northern section was subsequently restored months later, bringing the line length 49 km (30 mi).[7]

The Beijing Municipal Commission of Urban Planning released the plans for several subway stations in 2013.[8] Construction of the line began in December 2013.[9]

The northern section of the line from Bei'anhe to Xiyuan, except for Nongdananlu Station, opened at the end of 2016.[9][2] Nongdananlu station opened on December 30, 2017.[3]

SegmentCommencementLengthStation(s)Name
Bei'anhe — Xiyuan 31 December 2016 19.6 km (12.18 mi) 9 (initial phase)
Nongdananlu 30 December 2017 Infill station 1

Route

The line starts at the west end of Beiqing Road (北清路) just outside of the 6th Ring Road and follows the road east to Yongfeng Road (永丰路) where it turns south towards the city. Line 16 follows Yongfeng Road south to Xiyuan, its current terminus.

List of Stations

List of stations from north to south.[10]

Station Name Connections Nearby Bus Stops Distance
km
Location
English Chinese
Bei'anhe 北安河 544 专16 专99 0.00 0.00 Haidian
Wenyanglu 温阳路 330 544 633 642 651 902 908 2.74 2.74
Daoxianghulu 稻香湖路 543 544 902 专38 专54 2.10 4.84
Tundian 屯佃 303 512 543 544 575 902 2.40 7.24
Yongfeng 永丰 446 512 543 544 575 902 1.94 9.18
Yongfeng South 永丰南 365 384 438 570 575 902 运通123 1.34 10.52
Xibeiwang 西北旺 333 384 438 570 575 902 908 909 运通123 2.07 12.59
Malianwa 马连洼 328 333 362 438 449 476 509 518 575 651 特4 运通108 运通112 运通114 运通123 2.28 14.87
Nongdananlu 农大南路 333 362 393 437 438 476 509 575 636 651 特4 运通108 运通114 运通118 专28 1.50 16.37
Xiyuan 西苑  4  303 331 332 333 346 384 393 394 432 437 438 476 498 508 534 563 579 584 594 601 610 636 671 特19 夜8 运通106 运通108 运通114 运通118 2.70 19.07
Wanquanheqiao 万泉河桥
Suzhoujie 苏州街  10 
Suzhouqiao 苏州桥
Wanshousi 万寿寺
National Library 国家图书馆  4   9 
Erligou 二里沟  6 
Ganjiakou 甘家口 Xicheng
East Gate of Yuyuantan Park 玉渊潭东门 Haidian
Muxidi 木樨地  1  Haidian/Xicheng
Daguanying 达官营  7  Xicheng
Hongliannanli 红莲南里
Lize Business District 丽泽商务区  14  Fengtai
Fengyiqiao South 丰益桥南  Fangshan 
Fengtai Railway Station 丰台站  10 
Fengtainanlu 丰台南路  9 
Kandan 看丹
Yushuzhuang 榆树庄
Wanpingcheng 宛平城

References


  1. "北京轨道交通日客运量首破1300万人次". 中国新闻社. 2018-07-14. Retrieved 2018-07-14.
  2. 1 2 Beijing metro adds Line 16, Metro Report International, 3 January 2017
  3. 1 2 "About BJL16" mtr.bj.cn 2018-01-03
  4. 北京地铁新线将用新编组可提高运能70%. Sina News. 2013-04-25. Retrieved 2013-07-12.
  5. 1 2 (Chinese) "北京地铁16号线初定重要站点 拟过动物园、国图等" 北京晚报 2010-06-29
  6. 1 2 3 (Chinese)"北京地铁16号线城西贯通南北" 法制晚报 Archived 2011-07-07 at the Wayback Machine. 2010-06-29
  7. (Chinese) "北京地铁16号线规划方案获批复 起点为苏州街站" 人民j网(北京) 2010-12-29
  8. (Chinese) "北京地铁16号线车站设计方案展示" 2013-4-25
  9. 1 2 (Chinese) 北京地铁16号线丰台段正式开工 共设8座车站 2013-12-11
  10. (Chinese) "北京地铁16号线拟2017年底通车 全长50公里" 人民网 2014-12-05
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.