Line 12 (Beijing Subway)

Line 12
 12 
Construction site of Changchunqiao station in September 2017
Overview
Other name(s) M12 (planned name)
Type Rapid transit
System Beijing Subway
Status Under Construction
Termini Sijiqing
Guanzhuangluxikou
Stations 21
Operation
Operator(s) Beijing Mass Transit Railway Operation Corp., Ltd
Technical
Line length 29.2 km
Track gauge 1,435 mm (4 ft 8 12 in)

Line 12 of the Beijing Subway (Chinese: 北京地铁12号线; pinyin: běijīng dìtiě shí'èr hàoxiàn) is a 29.2 km (18.1 mi) long rapid transit rail line under construction in Beijing.[1]

Stations

Station Name Connections Distance
km
English Chinese
Sijiqing 四季青      
Yuandalu 远大路      
Changchunqiao 长春桥  10     
Suzhouqiao 苏州桥  16     
Renmin University 人民大学  4     
Dazhongsi 大钟寺  13     
Jimenqiao 蓟门桥  Changping     
Beitaipingzhuang 北太平庄  19     
Madian 马甸      
Anhuaqiao 安华桥  8     
Anzhenqiao 安贞桥      
Hepingxiqiao 和平西桥  5     
Guangximen 光熙门  13     
Xibahe 西坝河  17     
Sanyuanqiao 三元桥  10   Airport     
Fangyuanli 芳园里      
Gaojiayuan 高家园  14     
Jiuxianqiao 酒仙桥      
Beigangzi 北岗子  Pinggu     
Dongfeng 东风  3     
Guanzhuangluxikou 管庄路西口  3     

History

Line 12's route has undergone substantial changes on the planners' drawing board. In the late 1990s, one draft of the subway plan showed Line 12 running from the Beijing South railway station to Huangcun.[2] The Beijing South railway station was then built with subway platforms for only Lines 4 and 14. The old plan of Line 12 is cancelled now.

A new plan of Line 12 was announced at January 2012.[3] In June 2012, there were several media reports listing the planned stations of the line. The final planning of the line started from Sijiqing in Haidian District east to Guanzhuangluxikou in Chaoyang District, following the northern Third Ring Road.[4] The entire line has 21 stations[1] of with 15 will have transfers with other lines.[5] The line will provide relief for the northern arc of the congested Line 10 loop line.[1]

References

  1. 1 2 3 北京:贯通北三环12号线开建-新华网. news.xinhuanet.com. Retrieved 2017-12-28.
  2. (Chinese) 新闻行业资讯正文精彩关注北京地铁规划一览 Archived 2010-11-20 at the Wayback Machine. Feb. 2, 2004
  3. (Chinese) "2015年轨道交通长度达708公里 4条“增强版”地铁线2012年开建" 《北京日报》 2012-01-13
  4. (Chinese) "北京将再增3条新地铁" 《新京报》 2012-06-16
  5. 1911. "北京地铁12号线预计2021年通车 换乘站达15座--财经--人民网". finance.people.com.cn. Retrieved 2018-02-10.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.