Campo Verde Solar Project

Campo Verde Solar Project
Country United States
Location California
Coordinates 32°45′N 115°43′W / 32.750°N 115.717°W / 32.750; -115.717Coordinates: 32°45′N 115°43′W / 32.750°N 115.717°W / 32.750; -115.717
Status Operational
Owner(s) Southern Power and Turner Renewable Energy
Solar field
Type Flat-panel PV
Power generation
Nameplate capacity 139 MWAC
161 MWDC
Annual net output 371 GW·h

Campo Verde Solar Project is a 139-megawatt (MWAC) solar photovoltaic power station in Imperial County, California. The project was approved in December 2012. Construction began in early 2013 and was completed the same year. Designed and constructed by U.S. thin-film manufacturer First Solar, the plant uses nearly 2.3 million CdTe-PV modules. Campo Verde Solar was acquired in April 2013 by Southern Power and Turner Renewable Energy.[1] First Solar acquired the project in 2012 from US Solar Holdings LLC, which had developed the project and negotiated the 139 MW PPA with SDG&E.[2]

Production

Generation (MW·h) of Campo Verde Solar [3]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2013 9,72614,49327,20025,990 77,409
2014 26,65724,88633,92634,07036,09235,39433,95133,60232,89230,60028,59020,637 371,297
2015 24,23228,33733,18134,52335,31432,24533,61034,02829,36929,80528,12126,168 368,933
2016 24,55530,36033,09833,13936,54333,71333,63332,37629,65230,41924,69520,144 362,327
Total1,179,966

See also

References

  1. "First Solar Sells 139-Megawatt Campo Verde Solar Project". First Solar. April 23, 2013.
  2. "First Solar Acquires US Solar 139 MW Project". US Solar Holdings. August 1, 2012.
  3. "Campo Verde Solar, Monthly". Electricity Data Browser. Energy Information Administration. Retrieved March 8, 2017.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.