Beijing underground cross-city railway

Beijing underground cross-city railway
The entrance at Beijing Railway Station
Overview
Type Higher-speed rail
Status Operational
Locale Beijing
Termini Beijing
Beijing West
Stations 2
Operation
Opened March 20, 2015
Owner China Railway
Operator(s) China Railway High-speed
Technical
Line length 9.156 km (6 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius 4500m
Electrification 50Hz 25,000V
Operating speed 200 km/h (124 mph)
Maximum incline 16%
Route map

Up arrow 
Beijing–Shenyang HSR
to Shenyang North
Up arrow 
Beijing–Harbin Railway
to Harbin
Up arrow 
Beijing–Shanghai Railway
to Shanghai
Line 5, Beijing Subway
Line 8, Beijing Subway
Line 4, Beijing Subway
Moat
Beijing West
Down arrow 
Beijing–Guangzhou Railway
to Guangzhou
Down arrow 
Beijing–Guangzhou–Shenzhen–Hong Kong HSR
to West Kowloon

The Beijing underground cross-city railway is a short high-speed rail connection in Beijing. It connects the important transportation hubs Beijing Railway Station and Beijing West Railway Station via a tunnel. It also connects lines from southern and western areas with lines from northeast China.[1] The railway has a length span of 9.156 km (5.689 mi), and has been officially operational since March 20, 2015.[2] In 2017, the Beijing Development and Reform Commission proposed a commuter rail service utilizing the tunnel to connect Tongzhou and Shijingshan Districts.[3]

History

In the early 1980s a plan was proposed to connect Beijing Railway Station to Beijing West Railway Station via a conventional railway. This was an important part of the overall planning of Beijing West Railway Station's renovation, originally announced as part of the "Eighth Five-Year Plan". However, due to technical difficulties and other factors, this project did not initiate.

Train Z622 enters into Beijing underground tunnel

Construction

  • Construction Unit: Beijing Railway Bureau
  • Construction Unit: China Railway Liu Ju Group Limited, China Railway 16 Bureau Group Co., Ltd., China Railway Bureau Group, a company tunnel
  • Designer: Third Railway Survey and Design Institute
  • Supervisor: Academy of Railway Sciences Engineering Construction Supervision Department, China Railway Engineering Consulting Corporation, Beijing Railway Construction Engineering Co. Ltd.

Main technical standards

  • Railroad grade: I level
  • Number of main lines: Double
  • Minimum curve radius: General area 800 meters, 550 meters in difficult sections
  • Limiting gradient: 16%[8]
  • Effective train length: 650 m
  • Type of traction: Electric traction
  • Rolling stock: CRH6
  • Block type: Automatic block

References

  1. 1 2 Shao Wenjie (邵文杰) (2005-12-25). 北京站至北京西站地下直径线动工. Guangming Daily. Retrieved 2010-07-13.
  2. 北京站-西站首开地下“火车摆渡” 20日开通直径线. Sohu News. 2015-03-09.
  3. 关于市郊铁路城市副中心线车辆购置及交通标识系统工程项目建议书(代可行性研究报告)的批复-工程建设领域项目信息-北京市发展和改革委员会. www.bjpc.gov.cn. Retrieved 2017-09-27.
  4. 北京两大火车站将通地下列车 2008年前建成. Xinhua News. Retrieved 2010-06-02.
  5. 北京铁路地下直径线贯通 预计2015年初实现地下穿行. Beijing Municipal People's Government. 2013-07-27. Retrieved 2013-07-27.
  6. 北京站至西站地下线空载试运行. People's Daily Online Politics.
  7. 北京站-北京西站 乘火车15分钟就到. 法制晚报. 2015-03-21. Archived from the original on 2015-03-24. Retrieved 2015-03-21.
  8. "北京至北京西地下直径线". 铁路建设工程网. Archived from the original on 2014-03-16. Retrieved 2014-03-17.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.