Trafford Park Line
Trafford Park Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Where the new line will start. Provision was made for a future junction with the Trafford Park Line at the end of Pomona tram stop, branching away from the Eccles Line. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Tram/Light rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Manchester Metrolink | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Under construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale |
Manchester Trafford | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
Pomona Trafford Centre | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 6 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | Transport for Greater Manchester | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | scheduled 2021 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character |
Reserved track & street running | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | M5000 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 5.5 km (3.4 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 volts DC overhead | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Trafford Park Line is a tram line under construction on the Manchester Metrolink network in Greater Manchester, running from Pomona to the Trafford Centre. Its name derives from Trafford Park, an area of the Metropolitan Borough of Trafford and the first planned industrial estate in the world,[1] through which the line will eventually run.
History
Between July and September 2014, Transport for Greater Manchester (TfGM) conducted a public consultation to build the line.[2][3] In November 2014, TfGM applied for power under the Transport and Works Act 1992 to build and operate the line.[4] In October 2016, power to build the line was granted by the Secretary of State for Transport.[5][6][7][8] Construction commenced in January 2017, and it is expected to be open in 2020/21.[9]
Route description
The line will branch off from the Eccles Line immediately beyond Pomona, where provision was made for a future junction at the south–western end when the viaduct on which it sits was built in the late 1990s. Stops will be built at Wharfside, Imperial War Museum, Village, Parkway, EventCity and the Trafford Centre. Future provision will be made to extend the line to Port Salford.[10]
Crumpsall, on the Bury Line, will eventually become the northern terminus for Trafford Park line services. The line will run from Crumpsall (via the Bury line, city zone and Eccles line) to the Trafford Centre on completion. TfGM announced in July 2017 that works would begin at Crumpsall from 31 July 2017 "in preparation for the new Trafford Park line joining the Metrolink network", and expected completion would be in March 2018.[11]
Rolling stock
No new rolling stock will be required to operate the line; it will absorb capacity within the existing M5000 fleet, provision for the line's operation having been made when finalising the number ordered.[12]
References
- ↑ Nicholls (1996), p. xiii
- ↑ Consultation on Manchester Metrolink extension set to begin Rail Technology Magazine 16 June 2014
- ↑ Trafford Centre Metrolink plans to be discussed BBC News 7 July 2014
- ↑ "Trafford Park Line". Transport for Greater Manchester. Archived from the original on 14 March 2016.
- ↑ Metrolink's Trafford Park £350m Tramline Approved BBC News 13 October 2016
- ↑ Green light for new Trafford Park Metrolink line Metrolink 14 October 2016
- ↑ Metrolink line to the Trafford Centre will go ahead despite objections from Coronation Street and Manchester United Manchester Evening News 14 October 2016
- ↑ Powers granted for Manchester Metrolink Trafford Park extension Railway Gazette International 14 October 2016
- ↑ "Ground broken on Manchester's Trafford Park Line". Global Rail News. Retrieved 15 January 2017.
- ↑ Metrolink future network Archived 3 December 2013 at the Wayback Machine. Transport for Greater Manchester
- ↑ "Works at Crumpsall Metrolink stop". TfGM. Retrieved 8 Aug 2017.
- ↑ TfGM backs Manchester tram-train proposals Railway Gazette International 11 November 2013