Hough End tram stop
Hough End | |
---|---|
Metrolink | |
Location | |
Place | Chorlton-cum-Hardy |
Local authority | City of Manchester |
Fare zone information | |
Present status | Proposed station |
History | |
Opening | N/A |
|
Hough End tram stop was a proposed tram stop on the phase 3b plans to Manchester Airport. It was originally due to open in 2016 but was dropped from the plans.
References
Preceding station | Following station | |||
---|---|---|---|---|
Under Construction | ||||
towards Manchester Airport | Manchester Airport Line | towards Chorlton |
Coordinates: 53°26′15″N 2°15′44″W / 53.4376°N 2.2621°W
This article is issued from
Wikipedia.
The text is licensed under Creative Commons - Attribution - Sharealike.
Additional terms may apply for the media files.