Hardy Farm tram stop

Hardy Farm
Metrolink
Location
Place Chorlton-cum-Hardy
Local authority City of Manchester
Fare zone information
Present status Proposed station
History
Opening N/A
UK Trams portal

Hardy Farm tram stop was a proposed future tram stop on the phase 3b plans to Manchester Airport. It was due to open in 2016 but was dropped from the plans.

References

  • "Future extensions". Archived from the original on 8 April 2010.
  • "Airport" (PDF). Archived from the original (PDF) on 5 March 2012.
Preceding station   Manchester Metrolink   Following station
  Under Construction  
Manchester Airport Line
towards Chorlton

Coordinates: 53°25′49″N 2°16′42″W / 53.4303°N 2.2784°W / 53.4303; -2.2784


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.