Sydney Metro

Sydney Metro
Interior of a prototype Alstom Metropolis designed for the Sydney Metro
Overview
Owner Transport for NSW (through RailCorp)
Locale Sydney
Transit type Rapid transit
Number of lines
  • 1 (under construction)
  • 1 (proposed)
Number of stations
  • 13 (Stage 1)
  • 18 (Stage 2)
Website Sydney Metro
Operation
Operation will start 2019 (Stage 1)
Operator(s) Northwest Rapid Transit (Metro Trains Sydney Pty Ltd)[1][2]
Character Elevated railway, subway
Number of vehicles 22 trains
Headway 4 minutes during peak hours (capable of 2 minutes)
Technical
System length 66 km (41 mi)[3]
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
System map

Sydney Metro is a future automated rapid transit system in Sydney, New South Wales, Australia. Sydney will be the first Australian city to build a metro system.[4][5] The network will be controlled by Sydney Metro which was established in July 2018 and is an operating agency owned by the NSW Government. It has been announced that Jon Lamonte will be the Chief Executive of Sydney Metro, [6] which will be part of Transport for NSW's Opal ticketing system.

The first line is planned to consist of 31 stations and 66 km of track. It will be served by driverless, single deck trains, arriving every 4 minutes in peak hours and every 10 minutes at other times. The first stage, called Sydney Metro Northwest, is under construction and testing and is expected to open in the first half of 2019. It will link Rouse Hill to Chatswood. Construction has also commenced for Sydney Metro City & Southwest, an extension across Sydney Harbour, through the Central Business District (CBD) and then on to Bankstown.[7] This stage is expected to open in 2024.[8]

Sydney Metro West, a separate line between the Sydney CBD and Parramatta, was approved for financing by the New South Wales Government in June 2018[9] and is expected to open in the second half of the 2020s.

Plans and projects involving a high speed, rapid transit underground railway in Sydney date at least back to 2008,[10] although an initial proposal was raised as early as 2001.[11] Despite extensive plans for an underground network in the past, disputes over privatisation and funding had hampered government approval, delaying its inception. In spite of difficulties getting the project off the ground, government approval for what was initially known as the North West Rail Link, Sydney's first underground metro, was given in 2013. Route extensions and a name change to the Sydney Metro soon followed.[12]

History

Earlier proposals

The first proposals for a metro system in Sydney were put forward in 2001, when Co-ordinator-General of Rail Ron Christie released his "Long-term Strategic Plan for Rail" report, outlining long-term goals for the expansion of the rail network.[13] He suggested that a number of "metro" lines—operationally independent from the existing network—should be constructed past 2020 due to capacity constraints.[14] This was later dismissed by the New South Wales Government as only a "shopping list" of potential projects.[15]

The idea for a metro resurfaced in late 2007, when discussions about an underground 'Anzac Line' took place within the NSW Government. The line would have run from West Ryde in Sydney's north-west to Malabar in the south-east, but did not come to fruition.[16] In early 2008, following the shelving of various heavy rail expansion projects from the 2005 Metropolitan Rail Expansion Programme, the Government officially announced the 37 km (23 mi) North West Metro.[17] Expected to cost $12 billion, it would have linked Rouse Hill in Sydney's north-west with the CBD, with construction starting in 2010 and finishing in 2017.[18]

The construction of the North West Metro was however dependent on the privatisation of the electricity network,[19] and after a change of the state's Premier in late 2008 it was cancelled due to budgetary concerns. Its replacement was the 9 km (5.6 mi), $4 billion CBD Metro, a shortened route running from Rozelle in the inner-west and into the CBD through to Central.[20] Construction was scheduled to start in 2010, like its predecessor, but finish earlier in 2015. The CBD Metro was to have formed the "central spine" of a future metro network, with a planned West Metro extension to Westmead and Parramatta to be constructed soon after, subject to Federal funding.[21] Reception to the plans was mixed, with Opposition leader Barry O'Farrell accusing the Premier of "making it up as he goes along" after costings weren't released until after the press conference,[22] and criticism came from the Greens on the grounds that the route seemed designed to pass through marginal electoral seats.[23] The Government's initial submission to Infrastructure Australia for funding was rejected to due "a lack of integrated planning".[24] It was later revealed that the cost had jumped from $4 billion to $5.3 billion in six months,[25] and internal estimates showed that the metro would run at only 15% of its maximum capacity.[26]

The CBD Metro was cancelled in early 2010, after the Premier was deposed a few months before in 2009.[27][28] The Government had spent almost $410 million on the project.[29] The new Premier Kristina Keneally chose instead to focus on expansion of the existing heavy rail network, including the North West Rail Link and South West Rail Link.[30]

Revival

In mid-2012 the newly elected Coalition government announced Sydney's Rail Future and the NSW Transport Masterplan.[31] Under this proposal, the North West Rail Link would be built as a single-deck, privately operated metro connecting to a future second harbour crossing.[32] These plans received criticism on the basis that they might not have the capacity of existing double-deck trains,[33] and concerns over the inability of trains on the existing network to use the new crossing.[34]

In 2014 the Government announced the second harbour crossing under the name Sydney Rapid Transit, as part of the 'Rebuilding NSW' infrastructure plan funded through the sale of electricity infrastructure.[35][36] The new railway would cross Sydney Harbour, tunnel beneath the CBD, and join the Bankstown line which would be converted to metro standards.[37]

The system was officially renamed 'Sydney Metro' in June 2015 following the passage of power privatisation bills.[38] Opposing parties warned the government that the sale of the power infrastructure may not provide the capital needed.[39]

Under construction

Sydney Metro Northwest

Chatswood railway station, which will be serviced by Sydney Metro. It will be the initial terminus prior to the extension to Bankstown.

The first stage will connect Sydney's north-western suburbs to Chatswood. 23 km (14 mi) of new track is planned between Rouse Hill and Epping, including eight new stations. The 13 km (8.1 mi) Epping to Chatswood rail link will then be converted to rapid transit standards and segregated from the existing Sydney Trains network.[40] Passengers will be able to interchange with the existing system at Epping and Chatswood. Construction on Sydney Metro Northwest began in late 2013 and the first services are scheduled to start in 2019.[41]

In November 2016, Sydney Metro, in particular the John Holland Group, Dragados and Transport for NSW, were awarded the 2016 NSW Premier's Award for Building Infrastructure for the 15 km twin-tunnels in Bella Vista and Epping, which are currently the longest tunnels constructed in Australia.[42] The completion of these tunnels in early 2016 marked the completion of the first stage of Sydney Metro Northwest. The NSW Premier's award recognises "infrastructure projects in the state that make a difference to the local community".[42]

Sydney Metro City & Southwest

The second stage will extend Sydney Metro Northwest, currently under construction, 30 km (19 mi) from Chatswood on the North Shore, to Bankstown in the city's south-west via the Sydney central business district. The centrepiece of the project is a new twin-tunnel rail crossing under Sydney Harbour. Together with planned improvements to the Main Western line, the project is expected to increase capacity on the Sydney rail network by up to 60%, and allow for the movement of over 100,000 extra commuters across the network every hour.[43] The City & Southwest extension represents the first phase of the "southern sector conversion" envisaged in Sydney's Rail Future.[8]

Proposed extensions

Sydney Metro West

Sydney Metro West geotechnical survey locations[44] up to May 2018

Sydney Metro West is a separate line between the Sydney CBD and Westmead. The project was mentioned in a discussion paper released in September 2016 that investigated new rail projects to service Western Sydney and the proposed Western Sydney Airport. Media reports indicated the project had found favour with Transport for NSW and the New South Wales Government.[45][46] It was announced as an official project on 14 November 2016.[47]

Planning for the line is at an extremely early stage. Parramatta, Sydney Olympic Park, the Bays Precinct and the Sydney CBD were announced as initial station locations, with up to 12 stations being considered.[48] The preferred alignment is scheduled to be announced in late 2018,[49] and the line is expected to open in the second half of the 2020s. The government will use a value capture scheme to help pay for the project. The contributions from value capture are expected to amount to between 10 and 15 percent of the capital cost.[50]

The metro project serves a similar area to the previously announced Parramatta Light Rail. On 17 February 2017 it was announced that "stage 1" of the light rail project would run between Westmead and Carlingford, and that a "stage 2" branch to Strathfield via Sydney Olympic Park had been deferred.[46][51] A redesigned and truncated stage 2 route to Sydney Olympic Park via the suburbs to the north of the Parramatta River was announced in October 2017.[52]

In March 2018, the government announced new stations at Westmead and either Concord West or North Strathfield railway stations would be built.[53][54] An interchange at the western end of the line would also be built, connecting with the existing suburban stations at either Westmead or Parramatta.[55]

Other options for new metro stations include Camellia/Rydalmere, North Burwood/Five Dock, Kings Bay (Five Dock) and Pyrmont.[53] Media reports indicate that Martin Place will be the main CBD interchange.[56] Construction is expected to begin by 2022.[54]

Rolling stock

Prototype of an Alstom Metropolis designed for the Sydney Metro, on display at the 2017 Sydney Royal Easter Show.

Twenty-two 6-car Alstom Metropolis electric multiple units have been ordered for the network. Each single deck train will feature two dedicated areas for prams, luggage and bicycles. There will be three doors per side per carriage and no internal doors between the carriages.[57] In a 6-car configuration the trains will sit 378 people, with a total capacity of 1,100.[58] Seating arrangements on the Alstom trains will be longitudinal, in accordance with the style of most other metro trains.[59]

A full-scale model of the new train has been built for use on public display, including at the annual Sydney Royal Easter Show.[60][61] It consists of the front carriage, including its distinctive nose. Members of the public are able to tour the inside of the mockup. It is approximately 75% of the length of the final design for the new carriages, having two doors instead of three.[62]

These trains were built in Sri City, Chennai, India.[63] The first six-car Sydney Metro train arrived in Rouse Hill on 26 September 2017 and will undergo testing in the coming months.[64]

In February 2018, dynamic testing on the first of the trainsets began.[65] Testing is being done on brakes, passenger information displays, lighting and door operation.[66]

Capacity

Stage 1 is due to operate with 6-car trains running on 4 minute headways. After the addition of the Stage 2 extension to Bankstown the system will require at least 59 six-car trains to run every four minutes during peak periods. However the stations’ platforms will be configured to allow for future use of 8-car trains and the signalling system designed to allow for 2 minute headways, both of which are planned to be introduced once sufficient patronage demands it. Eight-car trains have a design capacity of 1,539 customers, and increasing the running frequency to ultimately 30 trains per hour (2 minute headway) would provide a maximum capacity of 46,170 passengers per hour per direction.[67] The line will run 21 or 22 hours.

Potential extensions

To Hurstville

The second phase of the southern sector conversion would see two of the four tracks between Sydenham and Hurstville, part of the Sydney Trains Illawarra line, converted to rapid transit and added to the Sydney Metro network. This would increase rail capacity between Hurstville and the city by 10 trains per hour. Though a precise construction timeframe was not provided, the plan envisages all work being completed by 2031. The Hurstville conversion would add eight stations and 9 km (5.6 mi) to the metro network.[8] Developing plans for this extension has proven difficult, and the Sydney Morning Herald reported in February 2016 that the project may have been dropped.[68]

Western Sydney routes

A scoping study into rail investment to service Western Sydney and the proposed Western Sydney Airport was announced by the New South Wales and Australian governments in November 2015.[69] A discussion paper was released in September 2016. The paper proposed various options that could provide a rail link to the airport, some of which are or are likely to be metro lines. The metro options are:[70]

OptionMode
Line to the Sydney Metro Northwest at Rouse HillLikely to be metro
Extension of the Sydney Metro City & Southwest from Bankstown via LiverpoolMetro
Line between Macarthur and Schofields via Western Sydney Airport and St MarysLikely to be metro

The paper also suggested two other potential metro projects: a new line between the Sydney CBD and Parramatta via Five Dock and Sydney Olympic Park and conversion of a section of the T2 Airport Line between the CBD and Revesby via the existing airport.[70] The New South Wales Government announced Sydney Metro West in November 2016, turning the CBD to Parramatta line into an official project of the government.

The study's final report was released in March 2018. It proposed two new lines to ultimately service the Western Sydney airport precinct: a "North-South Link" from Schofields to Macarthur and an "East-West Link" from Parramatta to the "Badgerys Creek Aerotropolis" - an area south of the airport. The report suggested that "a metro or light metro style of train would suit the North-South Link". The East-West Link could form an extension of Sydney Metro West. Two extensions of the initial metro line were also proposed: an extension of the northern section from Cudgegong Road to Schofields and an extension of the southern section from Bankstown to Liverpool.[71]

At the same time, the governments announced the development of a new rail line serving the airport. This line would form part of the North-South Link, running south from St Marys to the airport, before continuing on to the Badgerys Creek Aerotropolis. Funding for the line will be split 50:50 between the governments.[72] The line is scheduled to open by the time the airport opens in 2026.[73]

In media

A Seven News documentary on the early construction of part of the Sydney Metro aired on the Seven Network on 14 July 2016 titled World's Best Metro.[74]

References

  1. Sydney Metro North West MTR Corporation. 30 December 2017
  2. "Current details for ABN 54 600 820 737". ABN Lookup. Retrieved 5 August 2018.
  3. "About Sydney Metro" (website). Sydney Metro.
  4. "Sydney Metro: Info". sydneymetro.info. 13 July 2015.
  5. "Sydney Metro an Australian first". mondaq.com. 8 December 2009. Retrieved 13 July 2015.
  6. New Chief Executive appointed to Sydney Metro Transport for NSW 27 September 2018
  7. Sanda, Dominica (22 June 2017). "Work on Sydney Harbour tunnels to start". News Limited. Australian Associated Press. Retrieved 22 June 2017.
  8. 1 2 3 Transport for New South Wales (June 2012). Sydney's rail future: modernising Sydney's trains (PDF).
  9. "New South Wales commits funds to the next Sydney Metro line". NextCity.org. 28 June 2018. Retrieved 28 June 2018.
  10. "Don't worry about debt, Sydney needs this metro". The Sydney Morning Herald. 29 September 2008. Retrieved 13 July 2015.
  11. "Long Term Strategic Plan for Rail" (PDF). catalyst.com.au. June 2001. Retrieved 13 June 2015.
  12. "NSW tests the market over Sydney Metro construction". The Australian. 23 June 2015. Retrieved 13 July 2015.
  13. Ron, Christie (June 2001). "1. Introduction". Long-Term Strategic Plan for Rail (Report).
  14. Ron, Christie (June 2001). "5. Beyond 2010: Overcoming the critical inner city constraint and implementing a longer term vision". Long-Term Strategic Plan for Rail (Report).
  15. "Christie Report". Action for Public Transport. Retrieved 14 June 2015.
  16. Besser, Linton (14 September 2007). "New east-west line may cut congestion". Sydney Morning Herald. Fairfax Media. Retrieved 14 June 2015.
  17. Besser, Linton (26 February 2008). "Bye heavy rail, now for a north-west metro". Sydney Morning Herald. Fairfax Media. Retrieved 14 June 2015.
  18. Iemma, Morris. "Premier Iemma unveils Sydney's first Euro-style metro rail project" (PDF). NSW Government. Archived from the original (PDF) on 20 July 2008. Retrieved 14 June 2015.
  19. Gittins, Ross (17 March 2008). "Iemma's reasons for privatising electricity". The Sydney Morning Herald. Fairfax Media. Retrieved 14 June 2015.
  20. Benson, Simon (31 October 2008). "Northwest Metro rail link officially shelved". The Daily Telegraph. News Corp. Retrieved 14 June 2015.
  21. "Metro: The future of Sydney's transport" (PDF). NSW Government. 30 June 2009. Archived from the original (PDF) on 4 July 2009.
  22. "Metro-sexual Rees flags new rail link". The Daily Telegraph. News Corp. 24 October 2008.
  23. Clennel, Andrew; Besser, Linton (21 April 2009). "CBD Metro cost jumps $1.3b in six months". The Sydney Morning Herald. Fairfax Media. Retrieved 14 June 2015.
  24. Smith, Alexandra (6 February 2009). "'Inadequate' submission puts NSW down the list". The Sydney Morning Herald. Fairfax Media.
  25. Ralston, Nick (24 October 2008). "Rees reveals new Sydney Metro plan". The Sydney Morning Herald. Fairfax Media. Retrieved 14 June 2015.
  26. Besser, Linton (4 May 2009). "CBD Metro will run almost empty". The Sydney Morning Herald. Fairfax Media.
  27. "Keneally rolls Rees and takes top job". ABC News. AAP. 4 December 2009.
  28. "Keneally scraps CBD Metro plans". ABC News. ABC/AAP. 22 February 2010.
  29. Haynes, Rhys (3 December 2010). "Metro rail plan was 'wasteful'". The Daily Telegraph. News Corp.
  30. Newman, Peter (23 February 2010). "An end to Sydney's transport lost years?". The Sydney Morning Herald. Fairfax Media.
  31. "Sydney's Rail Future" (PDF). Transport for NSW. June 2012.
  32. Saulwick, Jacob (20 June 2012). "Sydney transport shake-up: plan for single deck metro-style trains and second harbour crossing". The Sydney Morning Herald. Fairfax Media.
  33. Saulwick, Jacob (23 September 2013). "Secret report casts doubt on train plan". The Sydney Morning Herald. Fairfax Media.
  34. Saulwick, Jacob (4 July 2012). "Tunnel too small could make rail link a bridge too far". Drive. Fairfax Media.
  35. "Transforming Sydney: Sydney Rapid Transit" (PDF). Transport for NSW. November 2014.
  36. "Rebuilding NSW". NSW Government. November 2014. Retrieved 15 June 2015.
  37. Geralthy, Sarah; Liz, Foschia (11 June 2014). "Sydney rapid transit rail build could begin in three years, NSW Transport Minister Gladys Berejiklian says". ABC News.
  38. "Funding secured: Sydney Metro to be a reality". Transport for NSW. 4 June 2015. Archived from the original on 23 June 2015.
  39. Gerathy, Sarah (4 June 2015). "Power vote means Sydney Harbour rail crossing is less than a decade away: NSW Premier Mike Baird". ABC News.
  40. "Green light for the North West Rail Link" (PDF). Transport for NSW. June 2013. Retrieved 7 November 2015.
  41. "Construction ramps up as Showground Station site is cleared". Transport for NSW. 23 October 2013. Archived from the original on 7 November 2015. Retrieved 7 November 2015.
  42. 1 2 "Sydney Metro receives awards for excellence". Trenchless Australasia. 28 November 2016. Retrieved 28 November 2016.
  43. Walker, Ian. "Construction begins on second Sydney Harbour rail crossing". The Daily Telegraph. Retrieved 23 April 2015.
  44. "Documents | Sydney Metro". www.sydneymetro.info. Retrieved 2018-05-22.
  45. Saulwick, Jacob (1 September 2016). "Revealed: new metro between Sydney CBD and Parramatta". The Sydney Morning Herald.
  46. 1 2 O'Sullivan, Matt (2 October 2016). "Change of course looms for multibillion-dollar Parramatta light rail". The Sydney Morning Herald.
  47. "Sydney Metro West: a new railway, more trains for Western Sydney". Transport for NSW. 14 November 2016.
  48. O'Sullivan, Matt (31 May 2017). "Sydney's new metro line to Parramatta kicks off clamour for stations". The Sydney Morning Herald. Fairfax Media. Retrieved 1 June 2017.
  49. "A new railway for Western Sydney" (PDF). Transport for NSW. November 2016.
  50. O'Sullivan, Matt (27 June 2017). "Cost of new metro line from Sydney CBD to Parramatta set to top $12.5 billion". The Sydney Morning Herald. Retrieved 29 June 2017.
  51. Gerathy, Sarah (17 February 2017). "Parramatta Light Rail: NSW Government accused of trying to ditch Sydney Olympic Park". ABC News. Australian Broadcasting Corporation. Retrieved 22 February 2017.
  52. "Parramatta Light Rail to Sydney Olympic Park". Transport for NSW. Retrieved 18 October 2017.
  53. 1 2 "Further Sydney Metro West stations revealed". Sydney Metro. Transport for NSW. 23 March 2018. Retrieved 23 March 2018.
  54. 1 2 O'Sullivan, Matt (23 March 2018). "The Sydney suburbs on list of station sites for new metro line". The Sydney Morning Herald. Retrieved 23 March 2018.
  55. "Sydney Metro West Project Overview". Sydney Metro. Transport for NSW. Retrieved 23 March 2018.
  56. Saulwick, Jacob (8 July 2018). "New CBD rail station to link Wynyard and Martin Place". The Sydney Morning Herald.
  57. "Case study: North West Rail Link, Sydney, Australia". Alstom. Archived from the original on 4 March 2016. Retrieved 14 October 2015.
  58. O'Rourke, Jim (5 November 2015). "Sydney Metro Northwest: Transport minister unveils life-size model of Metropolis carriage". The Daily Telegraph. Retrieved 7 November 2015.
  59. "Alstom's first 'Make in India' Metro inaugurated in Kochi". raillynews.com. 19 June 2017. Retrieved 21 January 2018.
  60. "Check out the Sydney Metro train". Retrieved 2017-07-29.
  61. "Transport for NSW Sydney Metro Marquee at the Sydney Royal Easter Show 2016 - Proj-X Design". www.proj-x.com.au. Retrieved 2017-07-29.
  62. "First glimpse of new Metro train | Sydney Metro". www.sydneymetro.info. Retrieved 2017-07-30.
  63. "First metro trains arrive for new $8.3 billion line to Sydney's north west". Sydney Morning Herald. 26 September 2017. Retrieved 20 January 2018.
  64. "First Sydney Metro train arrives". NSW Government. 26 September 2017. Retrieved 27 September 2017.
  65. UK, DVV Media. "Sydney metro train on test". Metro Report. Retrieved 2018-02-11.
  66. "First Metro Train Testing | Sydney Metro". www.sydneymetro.info. Retrieved 2018-02-11.
  67. "SYDNEY METRO CITY & SOUTHWEST | BUSINESS CASE SUMMARY" (PDF). Transport for NSW. Retrieved 28 February 2017.
  68. O'Sullivan, Matt; Saulwick, Jacob (3 February 2016). "Plan to extend Sydney metro line south hits growing list of hurdles". The Sydney Morning Herald.
  69. "Western Sydney Airport". Transport for NSW. Archived from the original on 2 March 2016. Retrieved 18 February 2016.
  70. 1 2 "Western Sydney Rail Needs Scoping Study: Chapter 6 - The options" (PDF). Transport for NSW. September 2016.
  71. "Western Sydney Rail Needs Scoping Study Outcomes Report". Australian Government and New South Wales Government. March 2018. pp. 7–11, 54–60. Retrieved 7 March 2018.
  72. "Western Sydney City Deal to deliver rail, investment and jobs". Transport for NSW. 4 March 2018. Retrieved 6 March 2018.
  73. "Western Sydney City Deal - Connectivity". Department of Infrastructure, Regional Development and Cities. Retrieved 16 March 2018.
  74. "AIRDATE: Seven News Presents: Worlds Best Metro". Decider TV. 11 July 2016. Retrieved 15 July 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.