Southern Expressway (South Australia)

Southern Expressway
South Australia
Main South Road at the northern end of the expressway (looking south), closed to south-bound traffic in 2008 before the second carriageway was built
North end
South end
Coordinates
General information
Type Freeway
Length 18.5 km (11 mi)
Opened 17 December 1997
Maintained by Department of Planning, Transport and Infrastructure
Route number(s)
  • M2
Major junctions
North end
 
South end
Location(s)
Major suburbs / towns Bedford Park, Darlington, O'Halloran Hill, Trott Park, Reynella, Morphett Vale, Noarlunga Downs, Seaford
Highway system

The Southern Expressway (route M2) is an 18.5 km (11.5 mi) freeway[1] in the southern suburbs of Adelaide, South Australia, between Bedford Park[2] and Old Noarlunga.

The Southern Expressway was built as a corridor to relieve heavy traffic from the major arterial, Main South Road, in Adelaide's south. It was originally built as a reversible one way freeway, and was the world's longest after its completion in 2001. Between 2010 and 2014 it was expanded and it is now a regular 2-direction freeway.

Construction of the expressway also included the Adelaide Southern Veloway for cyclists, which runs alongside it for 7 km, from Marion/Main South Road to the Panalatinga Tunnel. South of the Panalatinga Tunnel, the bikeway becomes a shared track for the remaining 12 km of the expressway. The expressway crosses over the Coast to Vines rail trail at both Panalatinga Road and at the expressway's Southern end.

History

Pre-construction

The expressway is the southern part of a north-south freeway originally conceptualised under the Metropolitan Adelaide Transport Study (MATS), completed in 1965, as a freeway bypassing the city from Dry Creek to Old Noarlunga.[3] The MATS plan proved unpopular, and in 1971 all further highway construction in Adelaide was postponed for a period of ten years. In 1983 plans for the freeway north of Darlington were abandoned, and the land that had been set aside was progressively sold off.

In 1984 the state government announced plans to develop a "third arterial road" for the south. In 1987 the project was split into two phases, the first the upgrading of Main South Road and Marion Road in the Darlington area, and the second a new road from Darlington to Reynella. Phase one was completed in 1994 with the widening of Main South Road to eight lanes between Ayliffes Road and Seacombe Road, and the widening of Marion Road to six lanes between Main South Road and Sturt Road.

Phase 2 became the expressway, which was to be constructed in two stages: from Darlington to Reynella, and from Reynella to Old Noarlunga. It was developed as a one-way reversible road with future duplication provided for in the roadworks base, to be constructed when the need arose. It used the remaining "Noarlunga Freeway" reservation, except for the northernmost kilometre where a new route through O'Halloran Hill was chosen to provide high-quality links with Marion and Main South Roads without interfering with existing infrastructure at Sturt.

Construction of the reversible freeway

Construction of the expressway commenced in July 1995 and the first stage was opened to traffic on 17 December 1997. Construction commenced on the second stage in February 1999 and was opened to traffic on 9 September 2001. The total cost of the reversible freeway was A$76.5m.

Promotional FM radio transmitter

During its construction and for some time after its opening, the expressway was promoted via a dedicated FM radio station established by the Department of Transport broadcasting via a low-power FM transmitter in the immediate vicinity of the road.[4] The radio station broadcast a recorded message on continuous loop featuring promotional and community information messages relating to the expressway, including a jingle that Transport Minister Diana Laidlaw declared made the expressway the only road in the world to have its own jingle.

Operation as a one way road

Until August 2014, the expressway was open approximately 21 hours per day, one way for over 10 hours in each direction. The northbound (city-bound) direction occurred on weekday mornings (2:00 am – 12:30 pm) and weekend evenings (2:00 pm – 12:30 am), the southbound direction on weekday evenings (2:00 pm – 12:30 am) and weekend mornings (2:00 am – 12:30 pm).[5] It was closed 12:30–2:00 am and 12:30–2:00 pm, except for Saturday and Monday mornings when the direction remained unchanged. Weekday public holidays also operated under the weekend's opening times to accommodate tourists travelling to the Fleurieu Peninsula. During each closure all road signs, lights and boom gates changed over, and the road was inspected by a tow truck contractor for debris and car breakdowns.

Duplication

In 2007 the Howard Government pledged $100m towards widening the expressway in its unsuccessful re-election bid.[6]

On 17 February 2010, during the state election campaign, Premier Mike Rann announced that, if re-elected the expressway would be duplicated in a A$445m project.[7] However, the inclusion of a new A$75m interchange at Darlington was later scrapped, after the government planning for a major transport hub at Darlington discovered the need for a $50 million section of road that would have to be destroyed when the expressway was eventually duplicated.[8]

Once duplication was announced in 2010, construction started one year later in 2011. The first construction-related expressway closures were 3 consecutive days in January 2012, out of peak hours, but is the most disruption the road has experienced since the opening of Stage 2, with only day-long resurfacing of line-marking, and cycle rides disrupting the expressway previously.

Due to the duplication of the Expressway, all of the bridges had to be widened to meet the new width of the road. Some road bridges were closed during the work needed, and others required a temporary lower speed limit for safety reasons. This caused some anger to residents and businesses.[9]

The new road was built entirely on the western side of the original roadway, and is four lanes wide between Reynella and Marion Road in the northbound. Accessibility has been improved with the project, with completely new intersections at Beach Road and Sheriffs Road, as well as being able to left turn out at Old Noarlunga, right turn out at Marion Road, and left turn in at Marion Road.[10]

The expressway opened to two-way traffic in August 2014 after a construction period of about a whole year and a cost of about A$400m.[11] [12]

Exits and intersections

Location[13][14]km[14]miDestinationsNotes
Darlington00.0Main South Road no left turn in from South Road.
Bedford Park, Sturt0.50.31Marion Road south side ramps only (no southbound exit, no northbound entrance)
O'Halloran Hill, Trott Park7.24.5Panalatinga Road, South Road Reynellanorth side ramps only (no northbound exit, no southbound entrance), no right turn in from South Road
Reynella, Lonsdale, Morphett Vale11.77.3Sheriffs Road
Morphett Vale, Christie Downs, Noarlunga Centre, Hackham West15.39.5Beach Road – Noarlunga Centre, Christie Downs
Huntfield Heights, Noarlunga Downs, Hackham18.511.5Main South Road Cape Jervis, Victor HarborNo right turn in to Expressway
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Bridges

Southern Expressway over the Field River in Reynella

The 15 bridges over the expressway from north to south are:

No.NameSuburbType
1Seacombe RoadDarlingtonVehicle
2Majors RoadO'Halloran HillVehicle
3Glenthorne PathO'Halloran HillFoot
4Young StreetReynellaVehicle
5Moore RoadReynellaVehicle
6Sugarbush PathReynellaFoot
7O'Sullivan Beach RoadMorphett ValeVehicle
8Glenhelen PathMorphett ValeFoot
9Flaxmill RoadMorphett ValeVehicle
10Elizabeth RoadMorphett ValeVehicle
11Beach RoadMorphett ValeVehicle
12Poznan PathHackhamFoot
13Honeypot RoadHackhamVehicle
14Peppermint PathHackhamFoot
15Perry PathHackhamFoot

The expressway has five underpasses:

No. Location Suburb Type
1 Marion Road Sturt Vehicle
2 O'Halloran Hill Recreation Park O'Halloran Hill Foot
3 Lander Road Trott Park Vehicle
4 Sherriffs Road Reynella Vehicle
5 Southern Expressway Southern terminus Huntfield Heights Bicycle

See also

References

  1. A guide to using the Southern Expressway, Department of Planning, Transport and Infrastructure, Government of South Australia
  2. Suburb boundaries, Warriparinga Ward Archived 21 February 2017 at the Wayback Machine., City of Marion
  3. MATS plan freeways, ozroads.com.au
  4. The Hon. Sandra Kanck MLC. "Hansard 17 October 1995". Hansard of the Legislative Council of South Australia. Retrieved 2008-12-29.
  5. "Southern Expressway". Government of South Australia. Archived from the original on 3 May 2013. Retrieved 3 November 2013.
  6. PM's $100m pledge, Mark Kenny, The Advertiser, 18 August 2007.
  7. http://www.adelaidenow.com.au/news/in-depth/southern-expressway-to-be-doubled-announces-sa-premier-mike-rann/story-fn2sdwup-1225831294904
  8. "New Southern Expressway freeway Darlington interchange scrapped". AdelaideNow. 22 August 2011. Retrieved 22 August 2011.
  9. Southern Expressway upgrade affects trade for Morphett Vale businesses, The Australian, 21 May 2013
  10. http://dpti.sa.gov.au/southern_expressway_duplication/project_overview
  11. http://dpti.sa.gov.au/southern_expressway_duplication
  12. "Southern Expressway flows in two ways". The Times, Victor Harbor, Fairfax Regional Media. 5 August 2014. Retrieved 5 August 2014.
  13. "Property Location Browser" (Map). Property Location Browser. Government of South Australia. Retrieved 8 March 2016.
  14. 1 2 Google (8 March 2016). "Southern Expressway" (Map). Google Maps. Google. Retrieved 8 March 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.