List of nuclear reactors

This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only include civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of April 2018, there are 449 operable reactors in the world, with a combined electrical capacity of 394 GW. Additionally, there are 58 reactors under construction and 154 reactors planned, with a combined capacity of 63 GW and 157 GW, respectively.[1] Over 300 more reactors are proposed.[1]

Argentina

Nuclear power stations in Argentina (view)
 Active plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Atucha[2][3][4]1PHWRPHWR KWUOperational3353621 June 196824 June 1974
2[5]PHWRPHWR KWUOperational69274514 July 1981 (halted in 1994, restarted in 2007)27 June 2014
3PHWRCANDU-6Planned[6]800(January 2018)(2025)
5th Plant[7]1PWRHualong-1Planned1000(2020)(2026)
Embalse [8]1PHWRCANDU-6Operation suspended for maintenance[9]6006481 April 197420 January 1984
CAREM1PWRCAREM25Under construction25298 February 2014

Armenia

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Metsamor1PWRVVER V-270Shut down3764081 July 19696 October 197725 February 1989
2PWRVVER V-270Operational3754081 July 19753 May 1980
3PWRVVER V-392Planned10601200(2018)(2023)

Austria

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Zwentendorf1BWRFinished; never started692April 19725 November 1978

Bangladesh

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Ruppur1PWRVVER-1200/523Under construction1080120030 November 2017[10](2023)
2PWRVVER-1200/523Under construction1080120014 July 2018(2024)

Belarus

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Ostrovets1PWRVVER V-491Under construction110911946 November 2013(2019)
2PWRVVER V-491Under construction1109119424 April 2014(2020)
Minsk1PWRVVER-1000Unfinished100019831987
2PWRVVER-1000Unfinished100019831987

Belgium

Belgium Nuclear power plants (view)
 Active plants
 Closed plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Doel1PWRWE-2 loopsOperational4334541 July 196915 February 1975(2025)
2PWRWE-2 loopsOperational4334541 September 19711 December 1975(2025)
3PWRFramatome 3-loopsOperational100610561 January 19751 October 1982(2022)
4PWRWE-3 loopsOperational103910901 December 19781 July 1985(2025)
Tihange1PWRFramatome 3-loopsOperational96210091 June 19701 October 1975(2025)
2PWRFramatome 3-loopsOperational100810551 April 19761 June 1983(2023)
3PWRWE-3 loopsOperational104610891 November 19781 September 1985(2025)

Brazil

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Angra1PWRWE-2 loopsOperational6096401 May 19711 January 1985
2PWRPRE KONVOIOperational127513501 January 19761 February 2001
3PWRPRE KONVOIUnder construction124513501984 (halted in 1986, restarted on 1 June 2010)

Bulgaria

Nuclear power plants in Bulgaria (view)
 Active plants
 Unfinished/future plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Kozloduy1PWRVVER-440/V-230Shut down4084401 April 197028 October 197431 December 2002
2PWRVVER-440/V-230Shut down4084401 April 197010 November 197531 December 2002
3PWRVVER-440/V-230Shut down4084401 October 197320 January 198131 December 2006
4PWRVVER-440/V-230Shut down4084401 October 197320 June 198231 December 2006
5PWRVVER-1000/V-320Operational96310009 July 198023 December 1988
6PWRVVER-1000/V-320Operational96310001 April 198230 December 1993
Belene1PWRVVER-1000/V-320
VVER-1000/V-446B
Unfinished1000
2PWRVVER-1000/V-320
VVER-1000/V-446B
Unfinished1000

Canada

Nuclear plants in Canada (view)
 Active plants
 Closed plants
Name Unit
No.
Reactor Status Capacity in MWe Construction start Commercial operation Closure
TypeModelNetGross
Pickering1PHWRCANDUOperational515542June 196629 July 1971(2022)
2PHWRCANDUShut Down515542September 196630 December 19711997
3PHWRCANDUShut Down515542December 19671 June 19721997
4PHWRCANDUOperational515542May 196817 June 1973(2022)
5PHWRCANDUOperational516540November 197410 May 1983(2024)
6PHWRCANDUOperational516540October 19751 February 1984(2024)
7PHWRCANDUOperational516540March 19761 January 1985(2024)
8PHWRCANDUOperational516540September 197628 February 1986(2024)
Darlington1PHWRCANDUOperational878934April 198214 November 1992(2052)
2PHWRCANDUOperational878934September 19819 October 1990(2050)
3PHWRCANDUOperational878934September 198414 February 1993(2053)
4PHWRCANDUOperational878934July 198514 June 1993(2053)
Bruce1PHWRCANDUOperational750805June 19711 September 1977(2042)
2PHWRCANDUOperational750805December 19701 September 1977(2043)
3PHWRCANDUOperational750805July 19721 February 1978(2053)
4PHWRCANDUOperational750805September 197218 January 1979(2054)
5PHWRCANDUOperational795845June 19781 March 1985(2052)
6PHWRCANDUOperational822872January 197815 September 1984(2052)
7PHWRCANDUOperational822872May 197910 April 1986(2052)
8PHWRCANDUOperational795845August 197922 May 1987(2052)
NPD1PHWRCANDUShut Down19.522January 19584 June 19621987
Douglas Point1PHWRCANDU-6Shut Down200220February 196026 September 19681984
Gentilly1BWRCANDUShut Down250266September 19661 May 19721977
2PHWRCANDU-6Shut Down635675April 19741 October 19832012
Point Lepreau1PHWRCANDUOperational635660May 19751 February 1983(2041)

China

Nuclear power plants in China (view)
 Active plants
 Under construction plants
 Firmly planned plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Bailong1PWRCAP-1000Planned15001550
2PWRCAP-1000Planned15001550
ChangjiangI-1PWRCNP-600Operational61065025 April 201025 December 2015
I-2PWRCNP-600Operational61065021 November 201020 June 2016
I-3PWRCNP-600Planned610650
I-4PWRCNP-600Planned610650
II-1PWRACP-100Planned100100
II-2PWRACP-100Planned100100
Daya Bay (Guangdong)1PWRM-310Operational9449847 August 19871 February 1994
2PWRM-310Operational9449847 April 19886 May 1994
Fangchenggang1PWRCPR-1000Operational1000108030 July 201025 October 2015
2PWRCPR-1000Operational1000108023 December 201015 July 2016
3PWRHualong-1Under construction1080115024 December 2015
4PWRHualong-1Under Construction1080115023 December 2016
5PWRHualong-1Planned11171250
6PWRHualong-1Planned11171250
Fangjiashan1PWRCPR-1000Operational1000108026 December 200815 December 2014
2PWRCPR-1000Operational1000108017 July 200912 February 2015
Fuqing1PWRCPR-1000Operational1000108021 November 200819 November 2014
2PWRCPR-1000Operational1000108017 June 200915 October 2015
3PWRCPR-1000Operational1000108031 December 20107 September 2016
4PWRCPR-1000Operational1000108017 November 201231 July 2017
5PWRHualong-1Under construction1080115015 April 2015
6PWRHualong-1Under construction1080115022 December 2015
Haiyang1PWRAP-1000Under construction1100125024 September 2009
2PWRAP-1000Under construction1100125020 June 2010
3PWRCAP-1000Planned11001250
4PWRCAP-1000Planned11001250
5PWRCAP-1000Planned11001250
6PWRCAP-1000Planned11001250
7PWRCAP-1000Planned11001250
8PWRCAP-1000Planned11001250
Haixing[11]1PWRCAP-1000Planned11001250
2PWRCAP-1000Planned11001250
Hongyanhe I1PWRCPR-1000Operational1061111918 August 20076 June 2013
2PWRCPR-1000Operational1061111928 March 200813 May 2014
3PWRCPR-1000Operational100010807 March 200923 March 2015
4PWRCPR-1000Operational1000108015 August 20091 April 2016
5PWRHualong-1Under construction1080115029 March 2015
6PWRHualong-1Under Construction1080115024 July 2015
Huizhou1PWRHualong-1Planned11001250
2PWRHualong-1Planned11001250
Lianjiang[12]1PWRCAP-1000Planned11001250
2PWRCAP-1000Planned11001250
Ling Ao I1PWRM-310Operational95099015 May 199728 May 2002
2PWRM-310Operational95099028 November 19978 January 2003
3PWRCPR-1000Operational1007108015 December 200515 September 2010
4PWRCPR-1000Operational1007108015 June 20067 August 2011
Lufeng1PWRCAP-1000Planned11001250
2PWRCAP-1000Planned11001250
Ningde I1PWRCPR-1000Operational1018108718 February 200815 April 2013
2PWRCPR-1000Operational1018108012 November 20084 May 2014
3PWRCPR-1000Operational101810808 January 201010 June 2015
4PWRCPR-1000Operational1018108029 September 201029 March 2016
5PWRHualong-1Planned10801150
6PWRHualong-1Planned10801150
Pengze1PWRCAP-1000Planned11001250
2PWRCAP-1000Planned11001250
QinshanI-1PWRCNP-300Operational29831020 March 19851 April 1994
II-1PWRCNP-600Operational6106502 June 199615 April 2002
II-2PWRCNP-600Operational6106501 April 19973 May 2004
II-3PWRCNP-600Operational61065028 April 20065 October 2010
II-4PWRCNP-600Operational61065028 January 200730 December 2011
III-1PHWRCANDU-6Operational6507288 June 199831 December 2002
III-2PHWRCANDU-6Operational65072825 September 199824 July 2003
Sanmen1PWRAP-1000Under construction1000125019 April 2009
2PWRAP-1000Under construction1000125015 December 2009
3PWRCAP-1000Planned11001250
4PWRCAP-1000Planned11001250
ShidaowanI-1HTGRHTR-PMUnder construction200210December 2012
II-1PWRCAP-1400Planned15001550
II-2PWRCAP-1400Planned15001550
Taohuajiang1PWRCAP-1000Planned11001250
2PWRCAP-1000Planned11001250
3PWRCAP-1000Planned11001250
4PWRCAP-1000Planned11001250
Taishan1PWREPRUnder construction1660175018 November 2009
2PWREPRUnder construction1660175015 April 2010
3PWREPRPlanned16601750
4PWREPRPlanned16601750
Tianwan1PWRVVER V-428Operational990106020 October 199917 May 2007
2PWRVVER V-428Operational990106020 September 200016 August 2007
3PWRVVER V-428MOperational1060112627 December 201214 February 2018
4PWRVVER V-428MUnder construction990106027 September 2013
5PWRACPR-1000Under construction1000108027 December 2015
6PWRACPR-1000Under construction100010807 September 2016
7PWRVVER V-491Planned11501200
8PWRVVER V-491Planned11501200
Xianning1PWRCAP-1000Planned11001250
2PWRCAP-1000Planned11001250
Xiapu[13]1SFRCFR-600Under construction6002017
2SFRCFR-600Planned600
Xudabao1PWRVVER V-491[12]Planned11501200
2PWRVVER V-491[12]Planned11501200
Yangjiang1PWRCPR-1000Operational1000108616 December 200825 March 2014
2PWRCPR-1000Operational100010864 June 20098 June 2015
3PWRCPR-1000+Operational1000108615 November 20101 January 2016
4PWRCPR-1000+Operational1000108617 November 201215 March 2017
5PWRACPR-1000Operational[14]1000108618 September 2013July 2018
6PWRACPR-1000Under construction1000108623 December 2013
Zhangzhou1PWRHualong-1Planned10801150
2PWRHualong-1Planned10801150

Cuba

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Juragua1PWRVVER-440 V-318Unfinished44019835 September 1992
2PWRVVER-440 V-318Unfinished44019855 September 1992

Czech Republic

Nuclear power stations in the Czech Republic (view)
 Active plants
 Planned plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Dukovany1PWRVVER V-213Operational4685001 January 19793 May 1985
2PWRVVER V-213Operational4715001 January 197921 March 1986
3PWRVVER V-213Operational4685001 March 197920 December 1986
4PWRVVER V-213Operational4715001 March 197919 July 1987
5PWR?Planned
Temelín1PWRVVER V-320Operational100310561 February 198710 June 2002
2PWRVVER V-320Operational100310561 February 198718 April 2003
3PWRVVER or AP1000Planned
4PWRVVER or AP1000Planned

Egypt

Name Unit
No.
Reactor Status Capacity in MW Construction
start date
Commercial
operation date
Closure
TypeModelNetGross
El Dabaa1PWRVVER-1200Planned1200(2020)[15](2026)
2PWRVVER-1200Planned1200
3PWRVVER-1200Planned1200
4PWRVVER-1200Planned1200

Finland

Nuclear power plants in Finland (view)
 Active plants
 Planned plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Loviisa1PWRVVER-440/V-213Operational4965201 May 19719 May 1977
2PWRVVER-440/V-213Operational4965201 August 19725 January 1981
Olkiluoto1BWRABB-III, BWR-2500Operational8809101 February 197410 October 1979
2BWRABB-III, BWR-2500Operational8809101 November 197510 July 1982
3PWREPRUnder construction1600172012 August 2005(2019)
Hanhikivi1PWRVVER-1200/V-491Planned1200(2019)

France

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Belleville1PWRP4 REP 1300Operational131013631 May 19801 June 1988
2PWRP4 REP 1300Operational131013631 August 19801 January 1989
Blayais1PWRCP1Operational9109511 January 19771 December 1981
2PWRCP1Operational9109511 January 19771 February 1983
3PWRCP1Operational9109511 April 197814 November 1983
4PWRCP1Operational9109511 April 19781 October 1983
Brennilis1HWGCRMONTS-D'ARREEShut down70751 July 19621 June 196831 July 1985
Bugey1GCRUNGGShut down5405551 December 19651 July 197227 May 1994
2PWRCP0Operational9109451 November 19721 March 1979
3PWRCP0Operational9109451 September 19731 March 1979
4PWRCP0Operational8809171 June 19741 July 1979
5PWRCP0Operational8809171 July 19743 January 1980
Cattenom1PWRP4 REP 1300Operational1300136229 October 19791 April 1987
2PWRP4 REP 1300Operational1300136228 July 19801 February 1988
3PWRP4 REP 1300Operational1300136215 June 19821 February 1991
4PWRP4 REP 1300Operational1300136228 September 19831 January 1992
ChinonA-1GCRUNGGShut down70801 February 19571 February 196416 April 1973
A-2GCRUNGGShut down1802301 August 195924 February 196514 June 1985
A-3GCRUNGGShut down3604801 March 19614 August 196615 June 1990
B-1PWRCP2Operational9059541 March 19771 February 1984
B-2PWRCP2Operational9059541 March 19771 August 1984
B-3PWRCP2Operational9059541 October 19804 March 1987
B-4PWRCP2Operational9059541 February 19811 April 1988
ChoozA-1PWRCHOOZ-AShut down3053201 January 196215 April 196730 October 1991
B-1PWRN4 REP 1450Operational150015601 January 198415 May 2000
B-2PWRN4 REP 1450Operational150015601 January 198415 May 2000
Civaux1PWRN4 REP 1450Operational1495156115 October 198829 January 2002
2PWRN4 REP 1450Operational149515611 April 199123 April 2002
Cruas1PWRCP2Operational9159561 August 19782 April 1984
2PWRCP2Operational91595615 November 19781 April 1985
3PWRCP2Operational91595615 April 197910 September 1984
4PWRCP2Operational9159561 October 197911 February 1985
Dampierre1PWRCP1Operational8909371 February 197510 September 1980
2PWRCP1Operational8909371 April 197516 February 1981
3PWRCP1Operational8909371 September 197527 May 1981
4PWRCP1Operational8909371 December 197520 November 1981
Fessenheim1PWRCP0Operational8809201 September 19711 January 1978
2PWRCP0Operational8809201 February 19721 April 1978
Flamanville1PWRP4 REP 1300Operational133013821 December 19791 December 1986
2PWRP4 REP 1300Operational133013821 May 19809 March 1987
3PWREPRUnder construction160016503 December 2007
Golfech1PWRP4 REP 1300Operational1310136317 November 19821 February 1991
2PWRP4 REP 1300Operational131013631 October 19844 March 1994
Gravelines1PWRCP1Operational9109511 February 197525 November 1980
2PWRCP1Operational9109511 March 19751 December 1980
3PWRCP1Operational9109511 December 19751 June 1981
4PWRCP1Operational9109511 April 19761 October 1981
5PWRCP1Operational9109511 October 197915 January 1985
6PWRCP1Operational9109511 October 197925 October 1985
MarcouleG1GCRUNGGShut down219557 January 195615 October 1968
G2GCRUNGGShut down39431 March 195522 April 19592 February 1980
G3GCRUNGGShut down40431 March 19564 April 196020 June 1984
PhénixFBRPH-250Shut down1301421 November 196814 July 19741 February 2010
Nogent1PWRP4 REP 1300Operational1310136326 May 198124 February 1988
2PWRP4 REP 1300Operational131013631 January 19821 May 1989
Paluel1PWRP4 REP 1300Operational1330138215 August 19771 December 1985
2PWRP4 REP 1300Operational133013821 January 19781 December 1985
3PWRP4 REP 1300Operational133013821 February 19791 February 1986
4PWRP4 REP 1300Operational133013821 February 19801 June 1986
Penly1PWRP4 REP 1300Operational133013821 September 19821 December 1990
2PWRP4 REP 1300Operational133013821 August 19841 November 1992
Saint-Alban1PWRP4 REP 1300Operational1335138129 January 19791 May 1986
2PWRP4 REP 1300Operational1335138131 July 19791 March 1987
Saint-LaurentA-1GCRUNGGShut down3905001 October 19631 June 196918 April 1990
A-2GCRUNGGShut down4655301 January 19661 November 197127 May 1992
B-1PWRCP2Operational9159561 May 19761 August 1983
B-2PWRCP2Operational9159561 July 19761 August 1983
Superphénix1FBRNa-1200Shut down1200124213 December 19761 December 198631 December 1998
Tricastin1PWRCP1Operational9159551 November 19741 December 1980
2PWRCP1Operational9159551 December 19741 December 1980
3PWRCP1Operational9159551 April 197511 May 1981
4PWRCP1Operational9159551 May 19751 November 1981

Germany

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
Type Model Net Gross
AVR1HTGRPebble bed reactor prototypeShut down13151 August 196119 May 196931 December 1988
Biblis1PWRPWRShut downa116712251 January 197026 February 19756 August 2011
2PWRPWRShut downa124013001 February 197231 January 19776 August 2011
Brokdorf1PWRPWROperational141014801 January 197622 December 1986(31 December 2021)
Brunsbüttel1BWRBWR-69Shut downa77180615 April 19709 February 19776 August 2011
Emsland1PWRKonvoiOperational1329140010 August 198220 June 1988(31 December 2022)
Grafenrheinfeld1PWRPWRShut down127513751 January 197517 June 198227 June 2015
Greifswald1PWRVVER V-230Shut down4084401 March 197012 July 197414 February 1990
2PWRVVER V-230Shut down4084401 March 197016 April 197514 February 1990
3PWRVVER V-230Shut down4084401 April 19721 May 197828 February 1990
4PWRVVER V-230Shut down4084401 April 19721 November 197922 July 1990
5PWRVVER V-213Shut down4084401 December 19761 November 198924 November 1989
6PWRVVER V-213Finished; never started408440
Grohnde1PWRPWROperational136014301 June 19761 February 1985(31 December 2021)
Großwelzheim1BWRSuperheated steam reactorShut down25271 January 19652 August 197020 April 1971
Gundremmingen1BWRShut down23725012 December 196212 April 196713 January 1977
2BWRBWR-72Shut down[16]1284122520 July 197619 July 198431 December 2017
3BWRBWR-72Operational1288134420 July 197618 January 1985(31 December 2021)
Isar1BWRBWR-69Shut downa8789121 May 197221 March 19796 August 2011
2PWRKonvoiOperational1410148515 September 19829 April 1988(31 December 2022)
Kahl1BWRBWRShut down15161 July 19581 February 196225 November 1985
SNR-3001FBRFinished; never started32719721985
KNK II1FBRShut down17211 September 19743 March 197923 August 1991
Krümmel1BWRBWR-69Shut downa134614025 April 197428 March 19846 August 2011
Lingen1BWRBWR with fossil fuel-fired superheaterShut down1832681 October 19641 October 19685 January 1977
Mülheim-Kärlich1PWRPWRShut down1219130215 January 19758 August 19879 September 1988
MZFR1PHWRHeavy water-cooled pressure vessel reactorShut down52571 December 196119 December 19663 May 1984
Neckarwestheim1PWRPWRShut downa7858401 February 19721 December 19766 August 2011
2PWRPWROperational131014009 November 198215 April 1989(31 December 2022)
Niederaichbach1HWGCRPressure tube reactorShut down1001061 June 19661 January 197331 July 1974
Obrigheim1PWRShut down34035715 March 196531 March 196911 May 2005
Philippsburg1BWRBWR-69Shut downa8909261 October 197026 March 19806 August 2011
2PWRPWROperational140214687 July 197718 April 1985(31 December 2019)
Rheinsberg1PWRVVER-70Shut down62701 January 196011 October 19661 June 1990
Stade1PWRVVER-1000/320Shut down6406721 December 196719 May 19724 November 2003
Stendal1PWRVVER-1000/320Unfinished100019831990
2PWRVVER-1000/320Unfinished100019831990
3PWRVVER-1000/320Never built1000
4PWRVVER-1000/320Never built1000
THTR-3001HTGRPebble bed reactorShut down2963083 May 19711 June 198729 September 1988
Unterweser1PWRPWRShut downa134514101 July 19726 September 19796 August 2011
Würgassen1BWRShut down64067026 January 196811 November 197526 August 1994
Notes:
^a Post-Fukushima shutdown of eight reactors. On 15 March 2011, the German Government decided to close seven nuclear power plants built before 1980 along with the Krümmel nuclear power plant for a duration of three months.[17] The temporary shutdown was changed into permanent shutdown by the German parliament on 30 June 2012. The remaining nine plants that stayed operational were given new decommissioning dates.[18]

Hungary

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Paks1PWRVVER V-213Operational4705001 August 197410 August 1983
2PWRVVER V-213Operational4735001 August 197414 November 1984
3PWRVVER V-213Operational4735001 October 19791 December 1986
4PWRVVER V-213Operational4715001 October 19791 November 1987
5PWRVVER-1200Planned11141200(2023)
6PWRVVER-1200Planned11141200(2025)

The modernization of the four reactors was finally ended at 2009, so the plant's total power generation reached 2000 MWe.

India

Atomic Power Stations in India (view)
 Active plants
 Planned plants

{| class="wikitable sortable mw-datatable" |- ! rowspan="2" |Name[19] ! rowspan="2" |Unit
No. ! colspan="2" |Reactor ! rowspan="2" |Status ! colspan="2" |Capacity in MW ! rowspan="2" |Construction start ! rowspan="2" |Commercial operation ! rowspan="2" |Closure |- ! Type ||Model ||Net ||Gross |- | rowspan=2| Chutka || 1 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | 2 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | rowspan=4| Gorakhpur || 1 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | 2 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | 3 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | 4 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | rowspan=6| Kaiga || 1 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 1 September 1989 || 16 November 2000 || |- | 2 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 1 December 1989 || 16 March 2000 || |- | 3 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 30 March 2002 || 6 May 2007 || |- | 4 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 10 May 2002 || 20 January 2011 || |- | 5 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | 6 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | rowspan=4| Kakrapar || 1 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 1 December 1984 || 6 May 1993 || |- | 2 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 1 April 1985 || 1 September 1995 || |- | 3 || PHWR || PHWR-700 || style="background:#FFB;vertical-align:middle;text-align:center; " class="table-partial"|Under construction || 630 || 700 || 22 November 2010 || || |- | 4 || PHWR || PHWR-700 || style="background:#FFB;vertical-align:middle;text-align:center; " class="table-partial"|Under construction || 630 || 700 || 22 November 2010 || || |- | rowspan=12| Kudankulam || 1 || PWR || VVER V-412 || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 932 || 1000 || 31 March 2002 || 31 December 2014 || |- | 2 || PWR || VVER V-412 || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 932 || 1000 || 4 July 2002 || 31 March 2017 || |- | 3 || PWR || VVER V-412 || style="background:#FFB;vertical-align:middle;text-align:center; " class="table-partial"|Under construction || 917 || 1000 || 30 June 2017 || || |- | 4 || PWR || VVER V-412 || style="background:#FFB;vertical-align:middle;text-align:center; " class="table-partial"|Under construction || 917 || 1000 || 23 October 2017 || || |- | 5 || PWR || VVER V-412 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 917 || 1000 || || || |- | 6 || PWR || VVER V-412 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 917 || 1000 || || || |- | 7 || PWR || VVER || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 917 || 1000 || || || |- | 8 || PWR || VVER || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 917 || 1000 || || || |- | 9 || PWR || VVER || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 917 || 1000 || || || |- | 10 || PWR || VVER || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 917 || 1000 || || || |- | 11 || PWR || VVER || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 917 || 1000 || || || |- | 12 || PWR || VVER || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 917 || 1000 || || || |- | rowspan=2| Madras || 1 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 205 || 220 || 1 January 1971 || 27 January 1984 || |- | 2 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 205 || 220 || 1 October 1972 || 21 March 1986 || |- | rowspan=4| Mahi Banswara || 1 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | 2 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | 3 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | 4 || PHWR || PHWR-700 || style="background: #dfdfff; color: black; vertical-align: middle; text-align: center; " class="table-planned" | Planned || 630 || 700 || || || |- | rowspan=2| Narora || 1 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 1 December 1976 || 1 January 1991 || |- | 2 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 1 November 1977 || 1 July 1992 || |- | PFBR || 1 || FBR || Prototype || style="background:#FFB;vertical-align:middle;text-align:center; " class="table-partial"|Under construction || 470 || 500 || 23 October 2004 || || |- | rowspan=8| Rajasthan || 1 || PHWR || CANDU/Horiz. Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational[20] || 90 || 100 || 1 August 1965 || 16 December 1973 || |- | 2 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 187 || 200 || 1 April 1968 || 1 April 1981 || |- | 3 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 1 February 1990 || 1 June 2000 || |- | 4 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 1 October 1990 || 23 December 2000 || |- | 5 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 18 September 2002 || 4 February 2010 || |- | 6 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 202 || 220 || 20 January 2003 || 31 March 2010 || |- | 7 || PHWR || Horizontal Pressure Tube || style="background:#FFB;vertical-align:middle;text-align:center; " class="table-partial"|Under construction || 630 || 700 || 18 July 2011 || || |- | 8 || PHWR || Horizontal Pressure Tube || style="background:#FFB;vertical-align:middle;text-align:center; " class="table-partial"|Under construction || 630 || 700 || 30 September 2011 || || |- | rowspan=4| Tarapur || 1 || BWR || BWR-1, Mark 1 || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 150 || 160 || 1 October 1964 || 28 October 1969 || |- | 2 || BWR || BWR-1, Mark 1 || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 150 || 160 || 1 October 1964 || 28 October 1969 || |- | 3 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 490 || 540 || 12 May 2000 || 18 August 2006 || |- | 4 || PHWR || Horizontal Pressure Tube || style="background:#9F9;vertical-align:middle;text-align:center;" class="table-yes"|Operational || 490 || 540 || 8 March 2000 || 12 September 2005 || |}

Indonesia

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Muria1PWRVVER-1200Planned11501200(2022)
2PWRVVER-1200Planned11501200(2022)
3PWRVVER-1200Planned11501200(2022)
4PWRVVER-1200Planned11501200(2022)
Bangka Belitung1PWRVVER-1200Planned11501000(2030)
2PWRVVER-1200Planned11501000(2030)

Iran

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Bushehr1PWRVVER V-446Operational91510001 May 197523 September 2013
2PWRVVER V-528Unfinished; restart planned9151000July 2019 (planned)
3PWRVVER V-528Planned9151000
4PWRVVER V-528Planned9151000
5PWRVVER V-528Planned9151000
Darkhovin1PWRUnfinished; restart planned280300

Italy

Nuclear power stations in Italy (view)
 Closed plants
 Canceled plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Caorso1BWRBWR-4 Mark2Shut down8608821 January 19701 December 19811 July 1990
Enrico Fermi1PWRWE 4-loopsShut down2602701 July 19611 January 19651 July 1990
Garigliano1BWRBWR-1Shut down1501601 November 19591 June 19641 March 1982
Latina1GCRMAGNOXShut down1531601 November 19581 January 19641 December 1987
Alto Lazio1BWRUnfinished98210091 July 19821 January 1988
2BWRUnfinished98210091 July 19821 July 1988

Japan

Nuclear power plants in Japan (view)
 Active plants
 Inactive plants
 Decommissioned plants
 Planned plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Fugen1HWLWRATRShut down14816510 May 197220 March 197929 March 2003
Fukushima Daiichi1BWRBWR-3Inoperable43946025 July 196726 March 197119 May 2011
2BWRBWR-4Inoperable7607849 June 196918 July 197419 May 2011
3BWRBWR-4Inoperable76078428 December 197027 March 197619 May 2011
4BWRBWR-4Shut down/Inoperable76078412 February 197312 October 197819 May 2011
5BWRBWR-4Shut down76078422 May 197218 April 197817 December 2013
6BWRBWR-5Shut down1067110026 October 197324 October 197917 December 2013
Fukushima Daini1BWRBWR-5Operation suspended1067110016 March 197620 April 1982
2BWRBWR-5Operation suspended1067110025 May 19793 February 1984
3BWRBWR-5Operation suspended1067110023 March 198121 June 1985
4BWRBWR-5Operation suspended1067110028 May 198125 August 1987
Genkai1PWRM (2-loop)Shut down52955915 September 197115 October 1975March 2015
2PWRM (2-loop)Operation suspended5295591 February 197730 March 1981
3PWRM (4-loop)Operational112711801 June 198818 March 1994
4PWRM (4-loop)Operational[21]1127118015 July 199225 July 1997
Hamaoka1BWRBWR-4Shut down51554010 June 197117 March 197630 January 2009
2BWRBWR-4Shut down80684014 June 197429 November 197830 January 2009
3BWRBWR-5Operation suspended1056110018 April 198328 August 1987
4BWRBWR-5Operation suspended1092113713 October 19893 September 1993
5BWRABWROperation suspended1325138012 July 200018 January 2005
Higashidōri1BWRBWR-5Operation suspended106711007 November 20008 December 2005
2Planned
3Planned
4Planned
Ikata1PWRM (2-loop)Shut down5385661 September 197330 September 197725 March 2016
2PWRM (2-loop)Shut down5385661 August 197819 March 198227 March 2018
3PWRM (3-loop)Operation suspended
(until Sep 2018)[22]
8468901 October 199015 December 1994
Kashiwazaki-Kariwa1BWRBWR-5Operation suspended106711005 June 198018 September 1985
2BWRBWR-5Operation suspended1067110018 November 198528 September 1990
3BWRBWR-5Operation suspended106711007 March 198911 August 1993
4BWRBWR-5Operation suspended106711005 March 199011 August 1994
5BWRBWR-5Operation suspended1067110020 June 198510 April 1990
6BWRABWROperation suspended
(restart approved)[23]
131513563 November 19927 November 1996
7BWRABWROperation suspended
(restart approved)[23]
131513561 July 19932 July 1997
Mihama1PWRM (2-loop)Shut down3203401 February 196728 November 1970March 2015
2PWRM (2-loop)Shut down47050029 May 196825 July 1972March 2015
3PWRM (3-loop)Operation suspended
(restart approved)[23]
7808267 August 19721 December 1976
Monju1FBR-Shut down24628010 May 198629 August 19958 December 1995
5 December 2017
Ōi1PWRW (4-loop)Shut down1120117526 October 197227 March 1979December 2017
2PWRW (4-loop)Shut down112011758 December 19725 December 1979December 2017
3PWRM (4-loop)Operational112711803 October 198718 December 1991
4PWRM (4-loop)Operational[24]1127118013 June 19882 February 1993
Ōma1BWRABWRUnder construction132513837 May 2010
Onagawa1BWRBWR-4Operation suspended4985248 July 19801 June 1984
2BWRBWR-5Operation suspended79682512 April 199128 July 1995
3BWRBWR-5Operation suspended79682523 January 199830 January 2002
Sendai1PWRM (3-loop)Operational84689015 December 19794 July 1984
2PWRM (3-loop)Operational84689012 October 198128 November 1985
Shika1BWRBWR-5Operation suspended5055301 July 198930 July 1993
2BWRABWROperation suspended1108115020 August 200115 March 2006
Shimane1BWRBWR-3Shut down4394602 July 197029 March 1974March 2015
2BWRBWR-5Operation suspended7898202 February 198510 February 1989
3BWRABWRUnder construction1325137312 October 2007
Takahama1PWRM (3-loop)Operation suspended
(restart approved)[23]
78082625 April 197014 November 1974
2PWRM (3-loop)Operation suspended
(restart approved)[23]
7808269 March 197114 November 1975
3PWRM (3-loop)Operational83087012 December 198017 January 1985
4PWRM (3-loop)Operational83087019 March 19815 June 1985
Tōkai1GCRMAGNOXShut down1371661 March 196125 July 196631 March 1998
2BWRBWR-5Operation suspended106011003 October 197328 November 1978
Tomari1PWRM (2-loop)Operation suspended55057918 April 198522 June 1989
2PWRM (2-loop)Operation suspended55057913 June 198512 April 1991
3PWRM (3-loop)Operation suspended86691218 November 200422 December 2009
Tsuruga1BWRBWR-2Shut down34035724 November 196614 March 1970March 2015
2PWRM (4-loop)Operation suspended110811606 November 198217 February 1987

Kazakhstan

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Aktau1SFRBN-350Shut down135196419731999
Kurchatov1FBRVBER-300Planned
2FBRVBER-300Planned

Lithuania

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Ignalina1LWGRRBMK-1500Shut down118513001 May 19771 May 198531 December 2004
2LWGRRBMK-1500Shut down118513001 January 19781 December 198731 December 2009
3LWGRRBMK-1500Unfinished11851300
4LWGRRBMK-1500Never built11851300
Visaginas1BWRABWRPlanned
2BWRABWRPlanned

Mexico

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Laguna Verde1BWRBWR-5Operational6657001 October 197629 July 1990
2BWRBWR-5Operational6657001 June 197710 April 1995

Netherlands

Nuclear power plants in the Netherlands(view)
 Active plants
 Closed plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Borssele1PWRLWR - PWROperational4825151 July 196926 October 1973(26 October 2033)
Dodewaard2BWRBWR-5Shut down55601 May 196526 March 196926 March 1997

North Korea

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Yongbyon1GCRMagnoxUnfinished501994
2LWR[25]Under construction[25]30
Taechon1Unfinished2001994
Kumho1PWRUnfinished1,0002003
2PWRUnfinished1,0002003

Pakistan

Nuclear power plants in Pakistan
 Active plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Chashma1PWRCNP-300Operational3003251 August 199315 September 2000
2PWRCNP-300Operational30032528 December 200518 May 2011
3PWRCNP-300Operational31534028 May 201115 October 2016
4PWRCNP-300Operational31534018 December 20111 July 2017
5PWRHualong-1Planned10801150
Karachi1PHWRCANDU-137 MWOperational901001 August 19667 December 1972
2PWRHualong-1Under construction1080115023 May 2013(2021)
3PWRHualong-1Under construction1080115021 August 2015(2022)

Philippines

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Bataan1PWRWestinghouseFinished; never started62119761986

Poland

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Żarnowiec1PWRVVER-440Unfinished44031 March 19824 September 1990
2PWRVVER-440Unfinished44031 March 19824 September 1990
3PWRVVER-440Never built4404 September 1990
4PWRVVER-440Never built4404 September 1990
Choczewo1??Planned1500
2??Planned1500
Site in the east1??Planned1500
2??Planned1500

Romania

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Cernavodă1PHWRCANDU-6Operational6507061 July 19822 December 1996
2PHWRCANDU-6Operational6507051 July 198331 October 2007
3PHWRCANDU-6Unfinished; restart planned650705
4PHWRCANDU-6Unfinished; restart planned650705
5PHWRCANDU-6Unfinished650705

Russia

Nuclear power plants in Russia (view)
 Active plants
 Closed plants
 Unfinished plants
 Under construction plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Akademik Lomonosov1PWRKLT-40SUnder construction323515 April 2007(2018)
2PWRKLT-40SUnder construction323515 April 2007(2018)
Balakovo1PWRVVER V-320Operational95010001 December 198023 May 1986
2PWRVVER V-320Operational95010001 August 198118 January 1988
3PWRVVER V-320Operational95010001 November 19828 April 1989
4PWRVVER V-320Operational95010001 April 198422 December 1993
5PWRVVER V-320Unfinished950100028 December 1992
6PWRVVER V-320Unfinished950100028 December 1992
Bashkir1PWRVVER-1000Unfinished100019801991
2PWRVVER-1000Unfinished100019801991
3PWRVVER-1000Unfinished100019801991
4PWRVVER-1000Unfinished100019801991
Beloyarsk1LWGRAMB-100Shut down1021081 June 195826 April 19641 January 1983
2LWGRAMB-200Shut down1461601 January 19621 December 19691 January 1990
3SFRBN-600Operational5606001 January 19691 November 1981
4SFRBN-800Operational78986418 July 200610 December 2015
5SFRBN-1200Planned11001220
6SFRBN-1600Planned15001600
Bilibino1LWGREGP-6Operational11121 January 19701 April 1974
2LWGREGP-6Operational11121 January 19701 February 1975
3LWGREGP-6Operational11121 January 19701 February 1976
4LWGREGP-6Operational11121 January 19701 January 1977
Dimitrovgrad1FBRSVBR-100Planned90100
Gorky1PWRAST-500Unfinished50019821993
2PWRAST-500Unfinished50019821993
Kalinin1PWRVVER V-338Operational95010001 February 197712 June 1985
2PWRVVER V-338Operational95010001 February 19823 March 1987
3PWRVVER V-320Operational95010001 October 19858 November 2005
4PWRVVER V-320Operational95010001 August 198625 December 2012
Kaliningrad1PWRVVER V-491Under construction
(suspended)[26]
1109119422 February 2012
2PWRVVER V-491Planned11091194
Kola1PWRVVER V-230Operational4414401 May 197028 December 1973
2PWRVVER V-230Operational4414401 May 197021 February 1975
3PWRVVER V-213Operational4414401 April 19773 December 1982
4PWRVVER V-213Operational4414401 August 19766 December 1984
Kola II[26]1PWRAES-2006Planned13001350
2PWRAES-2006Planned13001350
Kostroma[26]1PWRAES-2006Unfinished; restart planned1300135019791990
2PWRAES-2006Unfinished; restart planned1300135019791990
3PWRAES-2006Unfinished; restart planned1300135019791990
4PWRAES-2006Unfinished; restart planned1300135019791990
Kursk1LWGRRBMK-1000Operational92510001 June 197212 October 1977
2LWGRRBMK-1000Operational92510001 January 197317 August 1979
3LWGRRBMK-1000Operational92510001 April 197830 March 1984
4LWGRRBMK-1000Operational92510001 May 19815 February 1986
5LWGRRBMK-1000Unfinished92510001 December 1985
6LWGRRBMK-1000Unfinished92510001 August 1986
Kursk II1PWRVVER V-510Under Construction1115125529 April 2018
2PWRVVER V-510Planned11151255
3PWRVVER V-510Planned11151255
4PWRVVER V-510Planned11151255
Leningrad1LWGRRBMK-1000Operational92510001 March 19701 November 1974
2LWGRRBMK-1000Operational92510001 June 197011 February 1976
3LWGRRBMK-1000Operational92510001 December 197329 June 1980
4LWGRRBMK-1000Operational92510001 February 197529 August 1981
Leningrad II1PWRVVER V-491Under construction1085119925 October 2008
2PWRVVER V-491Under construction1085119915 April 2010(2019)
3PWRVVER V-491Planned10851170
4PWRVVER V-491Planned10851170
Nizhny Novgorod1PWRAES-2006Planned13001350
2PWRAES-2006Planned13001350
3PWRAES-2006Planned13001350
4PWRAES-2006Planned13001350
Novovoronezh1PWRVVER V-120Shut down1972101 July 195731 December 196416 February 1988
2PWRVVER V-120Shut down3363651 June 196414 April 197029 August 1990
3PWRVVER V-179Shut down3854171 July 196729 June 197225 December 2016
4PWRVVER V-179Operational3854171 July 196724 March 1973
5PWRVVER V-187Operational95010001 March 197420 February 1981
Novovoronezh II1PWRVVER V-392MOperational1114118024 June 200827 February 2017
2PWRVVER V-392MUnder construction1114119512 July 2009(2019)
3PWRVVER V-510Planned11751255
4PWRVVER V-510Planned11751255
Obninsk1LWGRAM-1Shut down561 January 19511 December 195429 April 2002
Rostov1PWRVVER V-320Operational95010001 September 198125 December 2001
2PWRVVER V-320Operational95010001 May 198310 December 2010
3PWRVVER V-320Operational1011110015 September 200927 December 2014
4PWRVVER V-320Operational1011110016 June 201028 September 2018
Sakha1PWRRITM-200MPlanned4550
2PWRRITM-200MPlanned4550
Seversk1FBRBREST-300Planned280300
South Urals1FBRBN-1200Unfinished; restart planned1100122019821993
2FBRBN-1200Unfinished; restart planned1100122019821993
3FBRBN-1200Unfinished; restart planned1100122019821993
Smolensk1LWGRRBMK-1000Operational92510001 October 197530 September 1983
2LWGRRBMK-1000Operational92510001 June 19762 July 1985
3LWGRRBMK-1000Operational92510001 May 198412 October 1990
4LWGRRBMK-1000Unfinished9251000
5LWGRRBMK-1000Unfinished9251000
6LWGRRBMK-1000Unfinished9251000
Smolensk II1PWRAES-2006Planned13001350
2PWRAES-2006Planned13001350
3PWRAES-2006Planned13001350
4PWRAES-2006Planned13001350
Tatar1PWRAES-2006Unfinished; restart planned1300135019801990
2PWRAES-2006Unfinished; restart planned1300135019801990
3PWRUnfinished19801990
4PWRUnfinished19801990
Voronezh1PWRAST-500Unfinished5009 January 19835 July 1990
2PWRAST-500Unfinished5009 January 19835 July 1990

Slovakia

Nuclear power stations in Slovakia (view)
 Active plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
BohuniceA-1[27]HWGCRKS 150Shut down931431 August 195825 December 197222 February 1977
1[28]PWRVVER V-230Shut down40844024 April 19721 April 198031 December 2006
2PWRVVER V-230Shut down40844024 April 19721 January 198131 December 2008
3PWRVVER V-213Operational4725051 December 197614 February 1985
4PWRVVER V-213Operational4715051 December 197618 December 1985
CPWRVVERPlanned1200
Kecerovce1??Planned1200
Mochovce1PWRVVER V-213Operational43647013 October 198329 October 1998
2PWRVVER V-213Operational43647013 October 198311 April 2000
3PWRVVER V-213+Under construction44047127 January 1987, restarted in 2009
4PWRVVER V-213+Under construction44047127 January 1987, restarted in 2009

Slovenia

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Krško1PWRWestinghouse 212Operational68872730 March 19751 January 1983
2??Planned1000

South Africa

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Koeberg1PWRCP-1Operational9309701 July 197621 July 1984
2PWRCP-1Operational9309701 July 19769 November 1985
Thyspunt
or
Duynefontein
1PWRAES 2006 or CAP1400Planned13001350
2PWRAES 2006 or CAP1400Planned13001350
3PWRAES 2006 or CAP1400Planned13001350
4PWRAES 2006 or CAP1400Planned13001350
5PWRAES 2006 or CAP1400Planned13001350
6PWRAES 2006 or CAP1400Planned13001350
7PWRAES 2006 or CAP1400Planned13001350
8PWRAES 2006 or CAP1400Planned13001350

South Korea

Nuclear plants in South Korea (view)
  •  Active plants
  •  Plants under construction
  •  Planned plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Hanbit1PWRWH FOperational9609964 June 198125 August 1986
2PWRWH FOperational95899310 December 198110 June 1987
3PWROPR-1000Operational997105023 December 198931 March 1995
4PWROPR-1000Operational997104926 May 19901 January 1996
5PWROPR-1000Operational997105329 June 199721 May 2002
6PWROPR-1000Operational995105220 November 199724 December 2002
Hanul1PWRFrance CPIOperational960100326 January 198310 September 1988
2PWRFrance CPIOperational96210085 July 198330 September 1989
3PWROPR-1000Operational994105021 July 199311 August 1998
4PWROPR-1000Operational99810531 November 199331 December 1999
5PWROPR-1000Operational99610511 October 199929 July 2004
6PWROPR-1000Operational996105129 September 200022 April 2005
Shin-Hanul1PWRAPR-1400Under construction1340140010 July 2012
2PWRAPR-1400Under construction1340140019 July 2012
Kori1PWRWH 60Shut down57660827 April 197229 April 197818 June 2017
2PWRWH FOperational6396764 December 197725 July 1983
3PWRWH FOperational101110421 October 197930 September 1985
4PWRWH FOperational101010411 April 198029 April 1986
Shin-Kori1PWROPR-1000Operational1000104816 June 200628 February 2011
2PWROPR-1000Operational100010455 June 200720 July 2012
3PWRAPR-1400Operational1416145516 October 200815 January 2016
4PWRAPR-1400Under construction1340140019 August 2009(September 2018)[29]
5PWRAPR-1400Under construction134014001 April 2017
6PWRAPR-1400Planned13401400
Wolsong1PHWRCANDU-6Operational65768730 October 197722 April 1983
2PHWRCANDU-6Operational65567822 June 19921 July 1997
3PHWRCANDU-6Operational68469817 March 19941 July 1998
4PHWRCANDU-6Operational68870322 July 19941 October 1999
Shin-Wolsong1PWROPR-1000Operational991104320 November 200731 July 2012
2PWROPR-1000Operational960100023 September 200826 February 2015

Spain

Nuclear power plants in Spain (view)
 Active plants
 Closed plants
 Unfinished plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Almaraz1PWRWE-3 loopsOperational101110493 July 19731 September 1983(2021)
2PWRWE-3 loopsOperational100610443 July 19731 July 1984(2023)
Ascó1PWRWE 3-loopsOperational995103316 May 197410 December 1984(2023)
2PWRWE-3 loopsOperational99710357 March 197531 March 1986(2025)
Cofrentes1BWRBWR-6Operational106411029 September 197511 March 1985(2024)
José Cabrera1PWRWE-1 loopShut down14115024 June 196413 August 196930 April 2006
Lemoniz1PWRUnfinished100019721984
2PWRUnfinished100019721984
Santa María de Garoña1BWRBWR-3Shut down44646611 May 197115 February 19756 July 2013
Trillo1PWRKWU-3 loopsOperational1003106617 August 19796 August 1988(2028)
Valdecaballeros1BWRUnfinished97519751984
2BWRUnfinished97519751984
Vandellòs1GCRShut down48050019672 August 197231 July 1990
2PWRWE-3 loopsOperational1045108729 December 19808 March 1988(2027)

Sweden

Nuclear power plants in Sweden (view)
 Active plants
 Closed plants
 Unfinished plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Ågesta1PHWRR3Shut down10121 December 19571 May 19642 June 1974
Barsebäck1BWRABB-IIShut down6006151 February 19711 July 197530 November 1999
2BWRABB-IIShut down6006151 January 19731 July 197731 May 2005
Forsmark1BWRABB-III, BWR-2500Operational98610221 June 197310 December 1980
2BWRABB-III, BWR-2500Operational111611561 January 19757 July 1981
3BWRABB-IV, BWR-3000Operational116712031 January 197918 August 1985
Oskarshamn1BWRABB-IShut down4734921 August 19666 February 197219 June 2017
2BWRABB-IIShut down6386611 September 19691 January 197522 December 2016
3BWRABB-III, BWR-3000Operational140014501 May 198015 August 1985
R41Unfinished130
Ringhals1BWRABB-IOperational8819101 February 19691 January 1976(2020)
2PWRWE 3-loopsOperational9049631 October 19701 May 1975(2019)
3PWRWE 3-loopsOperational106211171 September 19729 September 1981
4PWRWE 3-loopsOperational110411711 November 197321 November 1983

Switzerland

Switzerland Nuclear power plants (view)
 Active plants
 Closed plants

As of 8 December 2014, the Swiss parliament has voted to limit the operational life-time of Beznau I & II to no more than 60 years, and to enshrine a ban of constructing new reactors in the Constitution. However, this decision still has to pass the Council of States and it is likely that a referendum will be taken against such amendment. In addition, an Initiative of limiting the life-span of all nuclear reactors to 45 years will have to be voted upon the Swiss, irrespective of whether the legislature will actually enforce the constitutional amendment or not.[30]

Name Unit
No.
Reactor Status Capacity in MW Construction
Start Date
Commercial
Operation Date
Decommissioning[31]
TypeModelNetGross
Beznau1PWRWH 2-loopsOperational3653801 September 19651 September 19692029
2PWRWH 2-loopsOperational3653801 January 19681 December 19712031
Gösgen1PWRPWR 3-loopsOperational98510351 December 19731 November 1979not defined
Leibstadt1BWRBWR-6Operational122012751 January 197415 December 1984not defined
Mühleberg1BWRBWR-4Operational3733901 March 19676 November 1972(2019)[32]

Taiwan

Nuclear power plants in Taiwan (view)
 Active plants
 Halted
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Jinshan1BWRBWR-4Shut down6046362 June 197210 December 19783 October 2018
2BWRBWR-4Shut down6046367 December 197315 July 19793 October 2018
Kuosheng1BWRBWR-6Operational9851,02019 November 197528 December 1981
2BWRBWR-6Operational9851,02015 March 197616 March 1983
Lungmen1BWRABWRUnfinished[33]1,3001,35031 March 1999
2BWRABWRUnfinished1,3001,35030 August 1999
Maanshan1PWRWE 312 3-loopsOperational92695121 August 197827 July 1984
2PWRWE 312 3-loopsOperational92895121 February 197918 May 1985

Turkey

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Akkuyu1PWRVVER V-509Under construction111412003 April 2018(2022)
2PWRVVER V-509Planned11141200
3PWRVVER V-509Planned11141200
4PWRVVER V-509Planned11141200
Sinop1PWRATMEA-1Planned11001150
2PWRATMEA-1Planned11001150
3PWRATMEA-1Planned11001150
4PWRATMEA-1Planned11001150

Ukraine

Nuclear power plants in Ukraine (view)
 Active plants
 Closed plants
 Unfinished plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Chernobyl1LWGRRBMKShut down7406361 March 197027 May 197830 November 1996
2LWGRRBMKShut down92510001 February 197328 May 197911 October 1991
3LWGRRBMKShut down92510001 March 19768 June 198215 December 2000
4LWGRRBMKDestroyed92510001 April 197926 March 198426 April 1986
5LWGRRBMKUnfinished9251000
6LWGRRBMKUnfinished9251000
Chyhyryn1PWRVVER-1000Unfinished1000197719 May 1989
2PWRVVER-1000Unfinished1000197719 May 1989
3PWRVVER-1000Unfinished1000197719 May 1989
4PWRVVER-1000Unfinished1000197719 May 1989
Crimean1PWRVVER-1000Unfinished100026 January 19841987
2PWRVVER-1000Unfinished100026 January 19841987
3PWRVVER-1000Never built1000
4PWRVVER-1000Never built1000
Kharkiv1PWRVVER-1000Unfinished90094019881990
2PWRVVER-1000Unfinished90094019881990
3PWRVVER-1000Never built900940
4PWRVVER-1000Never built900940
Khmelnytskyi1PWRVVER V-320Operational95010001 November 198113 August 1988
2PWRVVER V-320Operational95010001 February 198515 December 2005
3PWRVVER V-392BUnder construction95010001 March 1986(2018)
4PWRVVER V-392BUnder construction95010001 February 1987(2020)
Odessa1PWRVVER-1000Unfinished9009401989
2PWRVVER-1000Unfinished9009401989
Rivne1PWRVVER V-213Operational3814201 August 197322 September 1981
2PWRVVER V-213Operational3764151 October 197329 July 1982
3PWRVVER V-320Operational95010001 February 198016 May 1987
4PWRVVER V-320Operational95010001 August 19866 April 2006
South Ukraine1PWRVVER V-302Operational95010001 August 19762 December 1983
2PWRVVER V-338Operational95010001 July 19816 April 1985
3PWRVVER V-320Operational95010001 November 198429 December 1989
4PWRVVER V-320Unfinished9501000
Zaporizhia1PWRVVER V-320Operational95010001 April 198025 December 1985
2PWRVVER V-320Operational95010001 January 198115 February 1986
3PWRVVER V-320Operational95010001 April 19825 March 1987
4PWRVVER V-320Operational95010001 April 198314 April 1988
5PWRVVER V-320Operational95010001 November 198527 October 1989
6PWRVVER V-320Operational95010001 June 198617 September 1996

United Arab Emirates

Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Barakah1PWRAPR-1400Under construction1345140018 July 2012(2018)
2PWRAPR-1400Under construction1345140028 May 2013(2019)
3PWRAPR-1400Under construction1345140024 September 2014(2020)
4PWRAPR-1400Under construction134514002 September 2015(2021)

United Kingdom

Nuclear power plants in United Kingdom (view)
 Active plants
 Closed plants
Name Unit
No.
Reactor Status Capacity in MW Construction start Commercial operation Closure
TypeModelNetGross
Berkeley1GCRMAGNOXShut Down1381661 January 195712 June 196231 March 1989
2GCRMAGNOXShut down1381661 January 195720 October 196226 October 1988
Bradwell1GCRMAGNOXShut down1231461 January 19571 July 196231 March 2002
2GCRMAGNOXShut down1231461 January 195712 November 196230 March 2002
Calder Hall1GCRMAGNOXShut down49601 August 19531 October 195631 March 2003
2GCRMAGNOXShut down49601 August 19531 February 195731 March 2003
3GCRMAGNOXShut down49601 August 195501 May, 195831 March 2003
4GCRMAGNOXShut down49601 August 19551 April 195931 March 2003
Chapelcross1GCRMAGNOXShut down48601 October 19551 March 195929 June 2004
2GCRMAGNOXShut down48601 October 19551 August 195929 June 2004
3GCRMAGNOXShut down48601 October 19551 December 199929 June 2004
4GCRMAGNOXShut down48601 October 19551 March 196029 June 2004
DungenessA-1GCRMAGNOXShut down2252301 July 196028 October 196531 December 2006
A-2GCRMAGNOXShut down2252301 July 196030 December 196531 December 2006
B-1GCRAGROperational5206151 October 19651 April 1985(2028)
B-2GCRAGROperational5206151 October 19651 April 1989(2028)
Hartlepool1GCRAGROperational5956551 October 19681 April 1989(2024)
2GCRAGROperational5856551 October 19681 April 1989(2024)
HeyshamA-1GCRAGROperational5856251 December 19701 April 1989(2019)
A-2GCRAGROperational5756251 December 19701 April 1989(2019)
B-7GCRAGROperational6106801 August 19801 April 1989(2023)
B-8GCRAGROperational6106801 August 19801 April 1989(2023)
Hinkley Point A1GCRMAGNOXShut down2352671 November 195730 March 196523 May 2000
2GCRMAGNOXShut down2352671 November 195705 May, 196523 May 2000
Hinkley Point B1GCRAGROperational4356551 September 19672 October 1978(2023)
2GCRAGROperational4356551 September 196727 September 1976(2023)
Hinkley Point C1PWREPRPlanned16001630
2PWREPRPlanned16001630
Hunterston A1GCRMAGNOXShut down1501731 October 19575 February 196430 March 1990
Hunterston A2GCRMAGNOXShut down1501731 October 19571 July 196431 December 1989
Hunterston B1GCRAGROperational4606441 November 19676 February 1976(2023)
Hunterston B2GCRAGROperational4606441 November 196731 March 1977(2023)
Moorside[34]1PWRAP1000Planned10001135
2PWRAP1000Planned10001135
3PWRAP1000Planned10001135
Oldbury1GCRMAGNOXShut down21723001 May, 196231 December 196729 February 2012
Oldbury2GCRMAGNOXShut down21723001 May, 196230 September 196830 June 2011
Oldbury B1BWRABWRPlanned13001380
2BWRABWRPlanned13001380
Sizewell A1GCRMAGNOXShut down2102451 April 196125 March 196631 December 2006
Sizewell A2GCRMAGNOXShut down2102451 April 196115 September 196631 December 2006
Sizewell B1PWRSNUPPSOperational1191125018 July 198822 September 1995(2035)
Sizewell C1PWREPRPlanned16001630
2PWREPRPlanned16001630
Torness1GCRAGROperational5956821 August 198025 May 1988(2023)
2GCRAGROperational5956821 August 19803 February 1989(2023)
Trawsfynydd1GCRMAGNOXShut down1952351 July 195924 March 19656 February 1991
2GCRMAGNOXShut down1952351 July 195924 March 19654 February 1991
Wylfa1GCRMAGNOXShut down4905301 September 19631 November 197130 December 2015
2GCRMAGNOXShut down4905401 September 19633 January 197225 April 2012
Wylfa Newydd1BWRABWRPlanned13001380
2BWRABWRPlanned13001380

United States

NameUnitReactorStatusCapacity in MWConstruction startCommercial operationClosure
TypeModelNetGross
Beaver Valley1PWRWH 3-loop (DRYSUB)Operational9702 July 1976
2PWRWH 3-loop (DRYSUB)Operational92014 August 1987
Calvert Cliffs1PWRCE 2-loop (DRYAMB)Operational8731975
2PWRCE 2-loop (DRYAMB)Operational8631977
Connecticut Yankee1PWRShut down58219682004
Ginna1PWRWH 2-loopOperational6101 June 1970
Hope Creek1Operational1,05920 December 1986
Indian Point1Shut down31 October 1974
2Operational1,0201 August 1974
3Operational1,02530 August 1976
James A. FitzPatrick1Operational838July 1975
Limerick1Operational1,1341 February 1986
2Operational1,1348 January 1990
Maine Yankee1Shut down86028 December 1972[35]1 August 1997[35]
Millstone1Shut down28 December 197021 July 1998
2Operational88226 December 1975
3Operational1,15523 April 1986
Nine Mile Point1Operational62126 December 1974
2Operational1,1402 July 1987
Oyster Creek1Shut down63623 December 196917 September 2018
Peach Bottom1GCRPrototypeShut down19661974
2BWRBWR-4 Mk 1Operational1,3825 July 1974
3BWRBWR-4 Mk 1Operational1,38223 December 1974
Pilgrim1Operational6859 December 1972
Salem1Operational1,17430 June 1977
2Operational1,13031 October 1981
Saxton1Shut downNovember 1961May 1972
Seabrook Station1Operational1,19415 March 1990
Shippingport1Shut down6026 May 1958December 1989
Shoreham1Shut down8201 August 19861 May 1989
Susquehanna1Operational1,35012 November 1982
2Operational1,35027 June 1984
Three Mile Island1Operational8522 September 1974
2Shut down90630 December 19781979
Vermont Yankee1Shut down514[36]30 November 197229 December 2014[37]
Yankee Rowe1Shut down185196026 February 1992
Alvin W. Vogtle1Operational1,2151 June 1987
2Operational1,21520 May 1989
3AP1000Under construction1,250(2021)[38]
4AP1000Under construction1,250(2022)[38]
Bellefonte1Unfinished1,100
2Unfinished1,100
Browns Ferry1BWR Operational1,06520 December 1973
2Operational1,1132 August 1974
3Operational1,11318 August 1976
Brunswick1Operational93818 March 1977[39]
2Operational9203 November 1975[40]
Parr1PHWRCVTRShut down1718 December 196310 January 1967
Catawba1Operational1,12929 June 1985
2Operational1,12919 August 1986
Crystal River 31Shut down86013 March 19775 February 2013
Edwin I. Hatch1Operational92431 December 1975
2Operational9245 September 1979
H. B. Robinson1Operational7357 March 1971
Joseph M. Farley1Operational9001 December 1977
2Operational92030 July 1981
McGuire1Operational1,1001 December 1981
2Operational1,1001 March 1984
North Anna1Operational9036 June 1978
2Operational97214 December 1980
Oconee1Operational84615 July 1973
2Operational8469 September 1974
3Operational84616 December 1974
Sequoyah1Operational1,1481 July 1981
2Operational1,1261 June 1982
Shearon Harris1Operational9002 May 1987
St. Lucie1Operational1,0021 March 1976
2Operational1,00210 June 1983
Surry1Operational79922 December 1972
2Operational7991 May 1973
Turkey Point3Operational69314 December 1972
4Operational6937 September 1973
3PWRAP1000Planned10001135
4PWRAP1000Planned10001135
Virgil C. Summer1Operational1,0001 January 1984
Watts Bar1Operational1,12127 May 1996
2Operational1,1654 June 2016
Big Rock Point[41]1BWRShut down671 May 196029 March 196329 August 1997
Byron1Operational1,16816 September 1985
2Operational1,1682 August 1987
Braidwood1[42]PWRWH 4LP (DRYAMB)Operational1,1941,2701 August 197529 July 1988
2[43]Operational1,12117 October 1988
Clinton1Operational1,04324 April 1987
Davis-Besse1Operational96531 July 1978
Donald C. Cook1Operational1,02027 August 1975
2Operational1,0901 July 1978
Dresden1Shut down21019601978
2Operational8679 June 1970
3Operational86716 November 1971
Duane Arnold1Operational58120 February 1975
Elk River1Shut down221 July 19641 February 1968
Enrico Fermi1FBRPrototypeShut down69195722 September 1972
2BWRBWR-4 (Mark 1)Operational1,09823 January 1988
Kewaunee1Shut down55616 June 19747 May 2013
La Crosse1Shut down507 November 196930 April 1987
LaSalle County1Operational1,2001 January 1984
2Operational1,20019 October 1984
Marble Hill1Unfinished
Monticello1Operational61030 June 1971
Palisades1Operational80031 December 1971
Perry1Operational1,23118 November 1987
Piqua1Shut down12.519631966
Point Beach1Operational51021 December 1970
2Operational5161 October 1972
Prairie Island1Operational54816 December 1973
2Operational54821 December 1974
Quad Cities1Operational91218 February 1973
2Operational91210 March 1973
Zion1Shut down1,040June 197313 February 1998
2Shut down1,040December 197313 February 1998
Arkansas Nuclear One1Operational84621 May 1974
2Operational9301 September 1978
Callaway1Operational1,30019 December 1984
Columbia1Operational1,17013 December 1984
Comanche Peak1Operational1,08417 April 1990
2Operational1,1246 April 1993
Cooper1Operational7701 July 1974
Diablo Canyon1Operational1,1227 May 1985
2Operational1,11813 March 1986
Fort Calhoun1Shut down4769 August 197324 October 2016
Fort St. Vrain1Shut down3301 July 197929 August 1989
Grand Gulf1Operational1,5001 July 1985
Hallam1Shut down7519631969
N-Reactor1Shut down1964December 1986
Humboldt Bay1Shut down63August 1963July 1976
Palo Verde1Operational1,4471986
2Operational1,4471986
3Operational1,4471988
Pathfinder1Shut down59July 1966October 1967
Rancho Seco1Shut down91317 April 197523 October 2009
River Bend1Operational97816 June 1986
San Onofre1Shut down4364561 January 196830 November 1992
2Shut down1,1728 August 19837 June 2013
3Shut down1,1781 April 19847 June 2013
Sodium Reactor Experiment1Shut down6.512 July 195715 February 1964
South Texas1Operational1,25025 August 1988
2Operational1,25019 June 1989
Trojan1Shut down1,13020 May 19761992
UAMPS1PWRNuScalePlanned4550
2PWRNuScalePlanned4550
3PWRNuScalePlanned4550
4PWRNuScalePlanned4550
5PWRNuScalePlanned4550
6PWRNuScalePlanned4550
7PWRNuScalePlanned4550
8PWRNuScalePlanned4550
9PWRNuScalePlanned4550
10PWRNuScalePlanned4550
11PWRNuScalePlanned4550
12PWRNuScalePlanned4550
Vallecitos1Shut downOctober 1957December 1963
Waterford1Operational1,21824 September 1985
Wolf Creek1Operational1,2503 September 1985

See also

Notes and references

  1. 1 2 "World Nuclear Power Reactors | Uranium Requirements | Future Nuclear Power - World Nuclear Association". www.world-nuclear.org. Retrieved 8 May 2018.
  2. "Archived copy". Archived from the original on 4 March 2016. Retrieved 2016-02-08.
  3. "Atucha I". Archived from the original on 20 October 2007. Retrieved 20 August 2015.
  4. "Nuclear Power in Argentina". Archived from the original on 29 August 2007. Retrieved 20 August 2015.
  5. IAEA Chief Lauds Argentine Nuclear Power Plant Start Archived 14 July 2014 at the Wayback Machine.
  6. "Atucha 3 contract signed". Retrieved 20 August 2015.
  7. "Macri acordó en China que la construcción de Atucha III comenzará en enero". Télam. Retrieved 30 May 2017.
  8. Yulia Kosarenko. "NASA fact sheet". Archived from the original on 8 July 2007. Retrieved 20 August 2015.
  9. La Nación - Córdoba: la central nuclear de Embalse paró por dos años para prolongar su vida útil
  10. "Nuclear Power in Bangladesh - World Nuclear Association". world-nuclear.org. Retrieved 17 July 2018.
  11. "China Nuclear Power | Chinese Nuclear Energy - World Nuclear Association". www.world-nuclear.org. Retrieved 16 July 2018.
  12. 1 2 3 "China Nuclear Power | Chinese Nuclear Energy - World Nuclear Association". www.world-nuclear.org. Retrieved 15 June 2018.
  13. "Fast nuclear reactor to start construction in Fujian in 2017". 16 August 2015. Archived from the original on 17 August 2015. Retrieved 16 August 2015.
  14. "Yangjiang 5 enters commercial operation". www.world-nuclear-news.org. Retrieved 16 July 2018.
  15. "Egypt says to start building nuclear plant in next two years". 2018-07-01. Retrieved 2018-07-08.
  16. "German reactor permanently shut down". www.world-nuclear-news.org. Retrieved 10 May 2018.
  17. "Bundesregierung | Kernkraftwerke kommen auf den Prüfstand" (in German). Bundesregierung.de. Archived from the original on 4 May 2011. Retrieved 8 August 2012.
  18. 13. Gesetz zur Änderung des Atomgesetzes
  19. Indian Nuclear Power Program Archived 1 July 2012 at the Wayback Machine.
  20. "PRIS - Reactor Details". www.iaea.org. Retrieved 21 May 2018.
  21. "Genkai unit 4 supplying power again". www.world-nuclear-news.org. Retrieved 22 June 2018.
  22. "Japanese court orders Ikata 3 to close". Nuclear Engineering International. 15 December 2017. Retrieved 18 December 2017.
  23. 1 2 3 4 5 "Nuclear Power Plants in Japan - The Federation of Electric Power Companies of Japan(FEPC)". www.fepc.or.jp. Retrieved 8 May 2018.
  24. "Ohi No.4 reactor restarted- News - NHK WORLD - English". NHK WORLD. Retrieved 10 May 2018.
  25. 1 2 "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor". 38 North. U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies. 14 January 2016. Archived from the original on 9 April 2016. Retrieved 4 April 2016.
  26. 1 2 3 "Nuclear Power in Russia | Russian Nuclear Energy - World Nuclear Association". www.world-nuclear.org. Retrieved 14 May 2018.
  27. Shut down after a 1977 refuelling incident; decommission in progress since 1979
  28. Tlačová agentúra Slovenskej republiky Archived 20 January 2009 at the Wayback Machine.
  29. "Commissioning of second Korean APR1400 postponed". www.world-nuclear-news.org. Retrieved 17 July 2018.
  30. "Archived copy". Archived from the original on 24 October 2012. Retrieved 2012-10-25. , Neue Zürcher Zeitung, ["Archived copy". Archived from the original on 24 October 2012. Retrieved 2012-10-25. schweiz/nationalrat-will-beznau-nach-60-jahren-vom-netz-nehmen-1.18440712 Nationalrat will Beznau nach 60 Jahren vom Netz nehmen (in German)], 8 December 2014
  31. admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy Archived 20 June 2013 at the Wayback Machine., 25 May 2011
  32. bkw.ch, BKW ldt Mühleberg Nuclear Power Plant – Decommissioning in 2019 Archived 3 December 2013 at the Wayback Machine., 30 October 2013
  33. http://voiceofrussia.com/news/2014_04_27/Construction-halted-at-Taiwan-nuclear-plant-after-protests-6641/
  34. "Nuclear Power in the United Kingdom |UK Nuclear Energy - World Nuclear Association". www.world-nuclear.org. Retrieved 14 May 2018.
  35. 1 2 "MAINE YANKEE". IAEA. Retrieved 14 April 2013.
  36. "VERMONT YANKEE". IAEA. 13 April 2013. Retrieved 14 April 2013.
  37. StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity Archived 29 December 2014 at the Wayback Machine., 29 December 2014
  38. 1 2 Walton, Rod (August 9, 2018). "Vogtle Cost Upgrade Causes Rethinking of $25B Nuclear Plant's Future". Power Engineering.
  39. "BRUNSWICK-1". IAEA. Retrieved 14 April 2013.
  40. "BRUNSWICK-2". IAEA. Retrieved 14 April 2013.
  41. "PRIS - Reactor Details". www.iaea.org. Retrieved 11 May 2018.
  42. "PRIS - Reactor Details". www.iaea.org. Retrieved 11 May 2018.
  43. "PRIS - Reactor Details". www.iaea.org. Retrieved 11 May 2018.
Reactor lists
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.