Kakrapar Atomic Power Station

Kakrapar Atomic Power Station
Country India
Coordinates 21°14′19″N 73°21′00″E / 21.23861°N 73.35000°E / 21.23861; 73.35000Coordinates: 21°14′19″N 73°21′00″E / 21.23861°N 73.35000°E / 21.23861; 73.35000
Status Out of service for 2 years, 7 months[1]
Construction began 1984
Commission date 6 May 1993
Operator(s) Nuclear Power Corporation of India
Nuclear power station
Reactor type PHWR
Power generation
Units operational 2 × 220 MW
Units under const. 2 × 700 MW
Nameplate capacity 440 MW
Capacity factor 96.5%
Annual net output 3.72 TWh

Kakrapar Atomic Power Station is a nuclear power station in India, which lies in the proximity of the city of Vyara in the state of Gujarat. It consists of two 220 MW pressurised water reactor with heavy water as moderator (PHWR). KAPS-1 went critical on 3 September 1992 and began commercial electricity production a few months later on 6 May 1993. KAPS-2 went critical on 8 January 1995 and began commercial production on 1 September 1995. In January 2003, CANDU Owners Group (COG) declared KAPS as the best performing pressurised heavy water reactor.[2]

The construction costs originally were estimated to be ₹ 382.52 crore, the plant was finally finished at a price of ₹ 1,335 crore. Construction of units 3 & 4 started in November 2010.[3]

Incidents

  • 1998 KAPS-1 was switched off because of a leakage in the cooling loop for 66 days.
  • 10 March 2004 the (at the time of) supply for the control rods were irreparably damaged during maintenance work. In response, poisons were added to the system and the reactor was shut off.
  • On 22 August 2006 it was reported by village inhabitants the area around the power station had been penetrated. A search by the police did not result in any findings.
  • On 11 March 2016, KAPS-1 automatically shut down due to a leak of heavy coolant water, leaving both reactors non-operational.[4] [5] The leak was plugged ten days later. As of March 2017 both reactors are still shut down and expected to remain so for at least another year.[6]

Units

UnitTypeGross MWConstruction startOperation startNotes
Phase I
Kakrapar 1PHWR2201 December 19846 May 1993 [7]
Kakrapar 2PHWR2201 April 19851 September 1995 [8]
Phase II
Kakrapar 3PHWR70022 November 20102018[9] [3]
Kakrapar 4PHWR70022 November 20102018[9] [3]

See also

References

  1. "Kakrapar Nuclear Reactors to Get New Coolant Channels". news18.com. 2017-02-01. Retrieved 2017-02-16.
  2. Kurian, Vinson (26 March 2003). "Indian N-reactors set new global benchmark". The Hindu Business Line. Retrieved 16 February 2017.
  3. 1 2 3 "First concrete for Kakrapar 3 and 4". World Nuclear News. World Nuclear Association (WNA). 22 November 2010. Retrieved 2010-11-22.
  4. Harikumar, S. (2016-03-11). "Shutdown of Unit-1 of KAPS Nuclear Power Plant following an incident leakage from Coolant System" (PDF). aerb.gov.in. Retrieved 2017-02-16.
  5. "More than 100 hours later, Kakrapar nuclear leak not fixed". 16 March 2016. Retrieved 18 April 2016 via Rediff.com.
  6. "Ahmedabad: No power from Kakrapar plant for at least a year". timesofindia.indiatimes.com. 2017-03-11. Retrieved 2017-11-02.
  7. "Nuclear Power Reactor Details - KAKRAPAR-1". Power Reactor Information System. International Atomic Energy Agency (IAEA). 23 Nov 2010. Retrieved 2010-11-23.
  8. "Nuclear Power Reactor Details - KAKRAPAR-2". PRIS. (IAEA). 23 Nov 2010. Retrieved 2010-11-23.
  9. 1 2 "India's first 700 MW nuclear reactor at Kakrapar to undergo trial run in 2017". The News Minute. 31 December 2016. Retrieved 18 October 2017.
  • "Nuclear Power in India". Country Briefings. World Nuclear Association (WNA). November 2010. Retrieved 2010-11-23.