Line 1 (Fuzhou Metro)

Line 1 of Fuzhou Metro (simplified Chinese: 福州地铁1号线; traditional Chinese: 福州地鐵1號線; pinyin: Fúzhōu Dìtiě Yī Hào Xiàn) is a north-south line of the Fuzhou Metro network in Fuzhou, Fujian Province, China. This line is the first operating metro line in the Fuzhou Metro system, inaugurated on May 18, 2016.[1] By June 2016, the south section, running from Sanchajie to Fuzhou South Railway Station, is in operation.[2] The north section opened on 6 January 2017. This line is colored red on system maps.

Line 1
 1 
A train entering Dongjiekou
Overview
TypeRapid transit
StatusIn Operation
Under Construction (Phase 2)
LocaleFuzhou, Fujian, China
TerminiXiangfeng
Fuzhou South Railway Station (Phase 1)
Sanjiangkou (Phase 2)
Stations21 (Phase 1)
4 (Phase 2)
Websitehttp://www.fzmtr.com
Operation
OpenedMay 18, 2016 (2016-05-18)
Operator(s)Fuzhou Metro Co., Ltd.
CharacterUnderground
Technical
Line length24.89 km (15.5 mi) (Phase 1)
4.31 km (2.7 mi) (Phase 2)
Track gauge1,435 mm (4 ft 8 12 in)
Electrification1,500 V DC overhead wires
Operating speed80 km/h (50 mph)
Route map


Car 01151 with jasmine decorations

The construction of Line 1 is divided into two phases. The first phase runs from Xiangfeng to Fuzhou South Railway Station. This part of Line 1 is 24.89 km in length and has 21 stations. The second phase runs from Fuzhou South Railway Station to Sanjiangkou with 4 stations. This part is 4.31 km long.[3]

Service Schedule

SegmentCommencementLengthStation(s)Name
Sanchajie — Fuzhou South 18 May 2016 9.76 km (6.06 mi) 9 Phase 1 (southern section)
Xiangfeng — Sanchajie 6 January 2017 15.13 km (9.40 mi) 12 Phase 1 (northern section)

Routes

Fuzhou Metro Line 1 is a metro rail line running in North-South direction in Fuzhou metropolitan area. It operates between Xiangfeng Station and Fuzhou South railway station, running through Fuzhou Railway Station, Dongjiekou Station, Nanmendou Station, Sanchajie Station, and Chengmen Station, all of which are cities' major transportation junctions and proposed transfer stations with other subway lines. Currently, the south extension of Line 1 (as known as Phase 2) is under construction and 4 stations are expected to open in 2021.

Stations

Station name Connections Distance
km
Jurisdiction
English Chinese
Xiangfeng 象峰 0.00 0.00 Jin'an
Xiushan 秀山 1.51 1.51
Luohanshan 罗汉山 0.97 2.48
Fuzhou Railway Station 福州火车站 FZS  3   F1  1.65 4.13
Doumen 斗门 1.20 5.33
Shudou 树兜 0.80 6.13 Gulou
Pingshan 屏山 1.32 7.45
Dongjiekou 东街口  4  1.15 8.60
Nanmendou 南门兜  2  1.00 9.60
Chating 茶亭 0.95 10.55 Gulou/Taijiang
Dadao 达道 1.50 12.05 Taijiang
Shangteng 上藤 1.73 13.78 Cangshan
Sanchajie 三叉街  F1  1.05 14.83
Baihuting 白湖亭 1.43 16.26
Huluzhen 葫芦阵 1.30 17.56
Huangshan 黄山 0.97 18.53
Paixia 排下 1.05 19.58
Chengmen 城门  4  1.00 20.58
Sanjiaocheng 三角埕 1.00 21.58
Lulei 胪雷 1.47 23.05
Fuzhou South Railway Station 福州火车南站 FYS  5  1.00 24.05

Phase 2 (Under Construction)

Station name Connections Location
English Chinese
Anping 安平 Cangshan
Liangcuo 梁厝  6 
Xiayang 下洋  6 
Sanjiangkou 三江口

Operating hours

During the first few months of operation, only the south section of Line 1 was in operation. The hours of operation during that time were from 7:00 to 20:20.

After the north section of the line opened, the hours of operation were extended. Nowadays, Line 1 begins operations at 6:30 and ends operations at 23:00.

Rolling stock

TypeTime of manufacturingSeriesSetsAssemblyNotes
Type B2014 - 2015Fulong B228Tc+Mp+M+M+Mp+TcDesigned by Tangshan Railway Vehicle, Manufactured by CNR Quanzhou.

See also

References

KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.