Nanning Metro
Nanning Metro or Nanning Nanning Rail Transit (NNRT) is a rapid transit system in Nanning, the capital of Guangxi Zhuang Autonomous Region. Line 1 officially started construction on December 29, 2011.[3] The first 11.2 km section, from Nanhu to Nanning East railway station, began operation June 28, 2016.[4] The line opened fully on December 28, 2016. It is 32.1 km long, with 25 stations.[3][5] Line 2 started construction in 2012 and was completed on December 28, 2017.[6][7] Currently, Lines 3, 4, 5 and an extension of Line 2 are under construction. It is planned that by 2021 there will be four vertical and four horizontal lines totaling 252 km of subway. The system is projected to carry over 5 million passengers per day.[3][8]
Overview | |
---|---|
Locale | Nanning, Guangxi, China |
Transit type | Rapid Transit |
Number of lines | 3 |
Number of stations | 65 |
Daily ridership | 0.5852 million (2018 daily avg.)[1] 1.1657 million (30 September 2019 record)[2] |
Annual ridership | 0.214 billion (2018) |
Website | http://www.nngdjt.com/ |
Operation | |
Began operation | June 28, 2016 |
Operator(s) | Nanning Rail Transport Limited |
Number of vehicles | 66 (2019) |
Technical | |
System length | 81.0 km (50.3 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Nanning Rail Transit | |||||||
---|---|---|---|---|---|---|---|
Chinese name | |||||||
Simplified Chinese | 南宁轨道交通 | ||||||
Traditional Chinese | 南寧軌道交通 | ||||||
| |||||||
Alternative Chinese name | |||||||
Simplified Chinese | 南宁地铁 | ||||||
Traditional Chinese | 南寧地鐵 | ||||||
| |||||||
Zhuang name | |||||||
Zhuang | Nanzningz Didez |
Lines in operation
Line | Terminals (District) |
Commencement | Newest Extension |
Length km |
Stations | |
---|---|---|---|---|---|---|
1 | Shibu (Xixiangtang) |
Nanning East railway station (Qingxiu) |
2016 | 2016 | 32.1 | 25 |
2 | Xijin (Xixiangtang) |
Yudong (Liangqing) |
2017 | — | 21.0 | 18 |
3 | Keyuan Dadao (Xixiangtang) |
Pingliang Overpass (Liangqing) |
2019 | — | 27.9 | 22[lower-alpha 1] |
Total | 81.0 | 65 |
- Donggouling station is not in operation.
Future Expansion
Planned opening date | Route | Name | Terminals | Length (km) | Stations | Status | |
---|---|---|---|---|---|---|---|
2020 | 4 | Phase I | Hongyun Lu | Longgang | 24.6 km | 19 | [9] |
2021 | 2 | East Extension | Yudong | Tanze | 6.3 km | 5 | [10][11] |
5 | Phase I | Guokai Dadao | Jinqiao Coach Station | 20.38 km | 17 | [12] |
See also
- Nanning Railway Bureau
- Nanning railway station
- List of metro systems
References
- http://3g.nnwb.com/html/2019-08/25/content_370171.htm
- http://baijiahao.baidu.com/s?id=1646820805805390200&wfr=spider&for=pc
- 罗宁 (2011-12-29). "南宁轨道交通一号线工程全线开工". 南宁新闻网 (in Chinese). 人民网. Retrieved 2012-01-01.
- http://www.urbanrail.net/as/cn/nanning/nanning.htm
- "南宁轨道交通1号线全线开通试运营-广西新闻网". www.gxnews.com.cn. Retrieved 2016-12-28.
- http://gx.people.com.cn/n/2013/0118/c179430-18043536.html
- chinanews. "南宁地铁2号线开通试运营 轨道交通建成"十字网"-中新网". www.chinanews.com. Retrieved 2017-12-29.
- L_103847. "2021年南宁将开通5条地铁线路 轨道交通连线成网--广西频道--人民网". gx.people.com.cn. Retrieved 2017-12-29.
- "地铁4号线一期开建 全线串起五象各组团-南宁轨道交通集团有限责任公司". www.nngdjt.com. Retrieved 2019-01-13.
- "南宁地铁2号线东延工程开工建设-南宁轨道交通集团有限责任公司". www.nngdjt.com. Retrieved 2019-01-13.
- "南宁地铁2号线东延工程开建 设5站全长约6.3公里". www.gxnews.com.cn. Archived from the original on 2017-05-30. Retrieved 2019-01-13.
- "Wayback Machine" (PDF). web.archive.org. 2016-10-12. Retrieved 2019-01-13.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.