Guangzhou–Shenzhen intercity railway

Guangzhou–Shenzhen intercity railway (Chinese: 穗深城际铁路; pinyin: Suì-Shēn Chéngjì Tiělù)[1] is a commuter railway in the Pearl River Delta of Guangdong, China. The construction route traces roughly along the east bank of the Pearl River,[3] connecting Guangzhou, Dongguan and Shenzhen Bao'an International Airport. It will feature a length of 73.996 km[1] from Xintang South to Shenzhen Airport, operating at a top speed of 140 km/h[1][4] using CRH6A trains.

Guangzhou–Shenzhen
intercity railway
Overview
Native name穗深城际轨道交通
穗深线
TypeHigher-speed rail
LocalePeople's Republic of China
TerminiXintang South (Through-service via Guangshen railway to/from Guangzhou East)
Shenzhen Airport
Stations15[1]
Operation
Opened15 December 2019
Operator(s)China Railway Guangzhou Group (current)
Technical
Line length73.996 km (46 mi)[1] (Xintang South–Shenzhen Airport section)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed140 km/h (87 mph)[1]
Guangzhou-Shenzhen ICR route map
Guangzhou-Shenzhen Railway
to Guangzhou railway station
Guangzhou East
Shipai
Tianhe East
Northern extension (Xinbaiguang intercity railway)
to Guangzhou Baiyun Airport and Guangzhou North
Xintang South
Guangzhou-Shenzhen Railway
to Shenzhen
Zhongtang
Dongguan West
Foshan-Dongguang ICR
to Guangzhou South
Wanghong
Dongguan–Huizhou ICR
to Huizhou
Hongmei
Dong River
Dongguan Port
Houjie
Guangzhou-Shenzhen-Hong Kong XRL
to Guangzhou South and West Kowloon Terminus
Humen North
Humen East
Chang'an West
Chang'an
Shajing West
Fuhai West
Shenzhen-Maoming HSR
to Maoming East and Shenzhen North
Shenzhen Airport North (Shenzhen Jichang Bei)
Shenzhen Airport (Shenzhen Jichang)
Planned extension to Xixiang, Bao'an, Qianhai[2]
 

History

Route planning in 2009 within Guangzhou changed several times and then a big change, with Xintang in Guangzhou's Zengcheng District chosen as the originating point, straight into Hongmei, Dongguan. This changed the access to the Guangzhou Metro to Line 13, with future access to the planned Line 16.[5][6] Guangzhou–Dongguan–Shenzhen intercity railway originally planned to through operate into Shenzhen Metro's Line 11 to Futian Station in central Shenzhen.[7] However, in September 2010, it was announced that this railway will no longer enter into the Shenzhen city center and designed as a separate railway service.[8][9]

Chronology

  • 21 December 2008 - Construction started.[10]
  • 25 November 2009 - Dongguan-Changan segment started[11]
  • 6 June 2012 - Deletion of Mayong station from plans.[12]
  • 21 September 2012 - Dongguan-Shenzhen section started.[13]
  • 17 October 2012 - Planning extends to Guangzhou East railway station, with renovating and running alongside the Guangzhou-Shenzhen Railway corridor[14] and the transformation of Jishan and Shipai stations will be upgraded for intercity use.
  • 6 December 2012 - Shenzhen route basically established, with two sites in Shenzhen: Airport East Station and Qianhaiwan Station.[15]
  • 14 May 2013 - Shenzhen section of the railway adjusted again, terminating at Airport Station, cancelling this line running to Airport East and Qianhaiwan stations.[16]

Station List

Station Name Chinese Distance
km
Pearl River Delta intercity railway
transfers/connections & Airports
Metro
transfers/connections
Location
Guangzhou North (Guangzhoubei) 广州北 0.00 0.00  GFC   GQ   9 
Tiangui Lu 天贵路  GFC   GQ 
Huashan 花山  GFC   GQ 
Baiyun Airport Terminal 2 白云机场T2 20.85  GFC   GQ 
CAN
 3 
Baiyun Airport Terminal 1 白云机场T1 0.96  GFC   GQ 
CAN
 3 
Baiyun Airport Terminal 3 白云机场T3 3.36  GFC 
CAN
Zhuliao 竹料  GFC   14 
Health Industry Park 健康产业城
Matouzhuang 马头庄  14  via Xinnan
Folangcun 佛塱村
Pinggang 平岗
Zhenlong 镇龙  14   21 
Lihucheng 荔湖城
Zengcheng Development Zone 增城开发区
↑Xinbaiguang intercity railway (新白广城际铁路)↑
↓Suishen (Guangzhou-Shenzhen) intercity railway (穗深城际铁路)↓
Guangzhou East (Guangzhoudong) 广州东  1   3 
Shipai 石牌
Tianhe East (Tianhedong) 天河东  4   21  via Huangcun
(Xintang Junction)
Through-service via Guangshen railway to/from Guangzhou East
Xintang South (Xintangnan) 新塘南  13  via Xintang
Zhongtang 中堂 5.54
Wangniudun 望牛墩 5.37
Dongguan West (Dongguanxi) 东莞西 3.49  GH   FG 
Hongmei 洪梅 3.25
Dongguan Port (Dongguangang) 东莞港 8.59
Houjie 厚街 5.15
Humen North (Humenbei) 虎门北 5.34  GSH   2 
Humen East (Humendong) 虎门东 4.08
Chang'an West (Chang'anxi) 长安西 6.75
Chang'an 长安 3.75
Shajing West (Shajingxi) 沙井西 8.28
Fuhai West (Fuhaixi) 福海西 4.93
Shenzhen Airport North (Shenzhenjichangbei) 深圳机场北 4.43 11
Shenzhen Airport (Shenzhenjichang) 深圳机场 3.82 SZX 11
Xixiang[2] 西乡[2] 1 15
Bao'an[2] 宝安[2]
Qianhai[2] 前海[2]  SH   SZ  1 5 11

Future development

Northern extension (Xinbaiguang intercity railway)

It is planned in the future to extend this railway further north eventually extending to Guangzhou Baiyun Airport and Guangzhou North railway station. The extension from Xintang South to Guangzhou North is also known as Xinbaiguang intercity railway[17] (新白广城际铁路).

Southern extension

There is also a planned extension from Shenzhen Airport to Xixiang, Bao'an and Qianhai.[2]

Others

There are also possible links with the proposed Hong Kong–Shenzhen Western Express Railway, allowing for cross-border services and an eventual rail link between Hong Kong Airport with Shenzhen Airport and Guangzhou Airport.

Notes

    References

    1. "穗深城际铁路即将开通!从广州市区到深圳宝安机场最快仅需53分钟". 2019-12-13.
    2. "穗莞深城际轨道深圳机场至前海段工程项目社会稳定风险分析——公众参与公告". 2019-11-27. Retrieved 2019-11-30.
    3. 附件F,香港立法會 交通事務委員會鐵路事宜小組委員會,二零零七年一月五日. "北環線和廣深港高速鐵路香港段資料文件]" (PDF). 珠三角城際快速軌道RTS(廣州至深圳段)最高時速 Max. Speed 140 km/h
    4. "穗莞深城轨东莞境内设10站". June 7, 2012.
    5. "增城区新塘镇被改成穗莞深城轨地铁的起点". Archived from the original on July 15, 2009.
    6. "新塘将交汇三轨道线穗莞深城轨全程一个钟". May 7, 2009.
    7. "远期轨道交通线网方案". 深圳市規劃局. Archived from the original on May 28, 2010.
    8. "穗莞深城轨2015年建成 共设15车站深圳占4个". June 7, 2012.
    9. "穗莞深城际2015年建成 全线设立15个站点". June 7, 2012. Archived from the original on January 9, 2015. Retrieved January 9, 2015.
    10. "穗莞深城际轨道干线在深圳开工". December 22, 2008. Archived from the original on March 4, 2016. Retrieved January 9, 2015.
    11. "穗莞深城際軌道長安段動工 8社區設3個站". November 25, 2009. Archived from the original on January 9, 2015. Retrieved January 9, 2015.
    12. "穗莞深城际轨道减了一个站". June 6, 2012.
    13. "穗莞深城轨莞深段已动工 广州到深圳只需20元". September 21, 2012. Archived from the original on January 9, 2015.
    14. "穗莞深将连通到广州东站". October 17, 2012.
    15. "福田至九龙乘高铁仅14分钟". December 6, 2012. Archived from the original on December 30, 2017. Retrieved January 9, 2015.
    16. "穗莞深城轨莞深段再调:站点少两个投资多16.29亿元". 南方都市报. April 18, 2013. Archived from the original on June 30, 2013. Retrieved May 14, 2013.
    17. "新白广城际铁路开始铺轨". 2019-09-02.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.