Solar power in Saudi Arabia

Solar power in Saudi Arabia has become more important to the country as oil prices have risen. In 2011, over 50% of electricity was produced by burning oil.[1] The Saudi agency in charge of developing the nations renewable energy sector, Ka-care, announced in May 2012 that the nation would install 41 gigawatts (GW) of solar capacity by 2032. It is projected to be composed of 25 GW of solar thermal, and 16 GW of photovoltaics. At the time of this announcement, Saudi Arabia had only 0.003 gigawatts of installed solar energy capacity.[2] A total of 24 GW of renewable energy was expected by 2020, and 54 GW by 2032.[3] 1,100 megawatts (MW) of photovoltaics and 900 megawatts of concentrated solar thermal (CSP) was expected to be completed by early 2013.[4] Also in 2013, solar power in Saudi Arabia had achieved grid parity and was able to produce electricity at costs comparable to conventional sources.[5]

Solar potential

In March 2018 Saudi Arabia announced that together with Softbank they plan to install 200 Gigawatt of solar power until the year 2030.[6] This project was cancelled in September 2018.[7] This compares to a global solar power installation of 100 Gigawatt in 2017. In the year 2016 Saudi Arabias electricity generation capacity stood at 77 Gigawatts.

Peer-reviewed analyses have demonstrated that higher fuel prices are needed to facilitate PV and CSP deployment[8].

Year Photovoltaics CSP
MWp GWh MWp GWh
20113

History

In 2011, The United States and Saudi Arabia jointly set up a solar-research station in Al-Uyaynah village. The village, located about 30 miles northwest of Riyadh, had no electric supply at the time. The station is operated by the King Abdulaziz City for Science and Technology. The agency established an experimental assembly line at the site to manufacture solar panels. The equipment on the assembly line was imported from Europe, and the solar cells are imported from Taiwan. The line's capacity was quadrupled within a year.[9]

Saudi Arabia's first solar power plant was commissioned on October 2, 2011, on Farasan Island. It is a 500 kW fixed tilt photovoltaic plant.

Given that the cost of solar projects decreased by roughly 90 percent in the 2010s, petrostates in the Middle East have raised their ambitions. Saudi Arabia had about 500 megawatts of renewable electricity capacity in 2020, but targets 60 gigawatts, most of which would come from solar photovoltaics and concentrated solar power, by 2030. [10] This has incentivized announcements for private sector solar projects which have a highly comptetitive bid price in terms of levelized cost of electricity. [11]

See also

References

  1. Saudi Arabia poised to become solar powerhouse
  2. Wael Mahdi and Marc Roca. "Saudi Arabia Plans $109 Billion Boost for Solar Power." Bloomberg News. May 11, 2012 9:23 AM CT
  3. Solar power export to Europe planned by KSA
  4. Saudi Arabia Plan $109 Billion Solar Energy Project to Reduce Oil Consumption
  5. Michael Deaves (February 27, 2013). "Solar Achieves Grid Parity in Saudi Arabia – Significant Developments Expected". ClearSky Advisors. Retrieved 2018-05-08.
  6. Saudis, SoftBank Plan World's Largest Solar Project Bloomberg, 2018-03-28
  7. Jones, Rory; Said, Summer (2018-09-30). "Saudi Arabia Shelves Work on SoftBank's $200 Billion Solar Project". Wall Street Journal. ISSN 0099-9660. Retrieved 2018-10-05.
  8. "KAPSARC Energy Model". Retrieved February 27, 2019.
  9. Ball, Jeffrey. "Why the Saudis Are Going Solar". The Atlantic. Retrieved 2017-03-24.
  10. "Mideast Petro-States look past oil rout to chase solar power". Gulf Business. Retrieved 2020-05-12.
  11. "Firms prepare final Saudi solar offers". Power Technology. Retrieved 2020-05-12.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.