MRT Blue Line

The MRT Chaloem Ratchamongkhon line (Thai: รถไฟฟ้ามหานคร สายเฉลิมรัชมงคล) or MRT Blue Line (Thai: รถไฟฟ้ามหานคร สายสีน้ำเงิน) is Bangkok's third rapid transit line, following the Sukhumvit line and Silom line of the BTS Skytrain. It is the first of the MRT system operated by Bangkok Expressway and Metro Public Company Limited (BEM). The MRT Blue Line was opened on 3 July 2004.[1] Current average daily ridership is 400,000.[2]

Blue Line
Train arriving at Si Lom Station
Overview
Native nameสายเฉลิมรัชมงคล
TypeRapid transit - heavy rail
SystemMRT
LocaleBangkok
TerminiTha Phra
Lak Song (via Thailand Cultural Centre)
Stations38
Operation
Opened3 July 2004
OwnerMass Rapid Transit Authority
Operator(s)Bangkok Expressway and Metro Public Company Limited
Depot(s)Phra Ram 9
Phetkasem
Technical
Line length48 km (30 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationThird rail
Operating speed80 km/h (50 mph)
Route map

Tha Phra
 MRT 
Charan 13
Fai Chai
Bang Khun Non
 MRT 
Bang Yi Khan
Sirindhorn
Bang Phlat
Bang O
Bang Pho
Tao Poon
 MRT 
Bang Sue
Bang Sue Central
under construction
 SRT   SRT   ARL 
Kamphaeng Phet
Chatuchak Park
 BTS 
Sukhumvit Line
Phahon Yothin
Lat Phrao
( MRL )
Ratchadaphisek
Sutthisan
Huai Khwang
Thailand Cultural Centre
 MRT 
Rama 9 Depot
Phra Ram 9
Phetchaburi
 SRT   ARL 
Sukhumvit
 BTS 
Sukhumvit Line
Queen Sirikit
National Convention Centre
Khlong Toei
Lumphini
Si Lom
 BTS 
Silom Line
Sam Yan
Hua Lamphong
 SRT 
Wat Mangkon
Sam Yot
 MRT 
Sanam Chai
Chao Phraya River
Itsaraphap
Tha Phra
 MRT 
Bang Phai
Silom Line
Bang Wa
 BTS 
Phetkasem 48
Phetkasem Depot
Phasi Charoen
Bang Khae
Lak Song
Phutthamonthon Sai 2
Thawi Watthana
Phutthamonthon Sai 3
Phutthamonthon Sai 4

The line is 48 km long, being a circle route of the Bangkok rapid transit network. It encircles and connects business, residential and cultural areas of Bangkok.

History

Origin

Officially named Chaloem Ratchamongkhon (Thai สายเฉลิมรัชมงคล) "Celebration of Royal Auspice" or informally but recognised by operator as the "Blue Line", this was the first metro line under the newly formed government agency, the Mass Rapid Transit Authority of Thailand (MRTA). Initially the line started running fully underground from Hua Lamphong to Bang Sue. It was later extended to run from Tha Phra to Lak Song, mostly on elevated tracks.

Most civil infrastructure was provided by this government agency and handed over to a private sector as an operator for a 25-year via concession agreement. The winning bidder was Bangkok Metro Company Limited (BMCL), subsequently renamed Bangkok Expressway and Metro Public Company Limited (BEM). Under this agreement, BMCL/BEM must provide maintenance and engineering equipment, including electrical trains, signalling systems, SCADA, communication, platform screen doors and fully operate the system from Hua Lamphong to Bang Sue.[3][4] BMCL/BEM has subcontracted maintenance of the system for 10 years to Siemens and seven-year maintenance contracts to two local maintenance services.[5]

Construction of the line from Hua Lamphong to Bang Sue began on 19 November 1996. The project suffered multiple delays not only because of the 1997 economic crisis, but also due to challenging civil engineering works of constructing massive underground structures deep in the water-logged soil upon which the city is built.

The Blue Line was opened for a limited public trial period of several weeks starting on 13 April 2004. On 3 July 2004 the line was officially opened at 19:19 local time by HM King Bhumibol and Queen Sirikit,[1] who were accompanied by other members of the royal family. Within 30 minutes of its opening, sightseers filled the system to its maximum capacity, but after the initial rush ridership settled down to around 180,000 riders daily considerably lower than projections of over 400,000, despite fares being slashed in half from 12-38 baht to 10-15 baht per trip.

Extension to Tao Poon

In line with Bangkok's rapid transit master plan the Blue Line has been extended, from Hua Lamphong to Lak Song and from Bang Sue to Tha Phra, forming a circle open-loop route. The contract for the first part of extension was signed on 26 August 2009[6] but was part of MRT Purple Line program. The Bang Sue - Tao Poon extension was opened on 11 August 2017.[7] Adding 1.2 km and 1 elevated station, Tao Poon, to the Blue line.[8][9]

Blue Line extension program and concession amendment

The Blue Line extension program itself was initiated in 2008.[10] It will be a 27 km extension to Tha Phra and Lak Song with 19 stations, four underground and 15 elevated stations. Under this scheme, contract for civil work will be divined into five contracts. Tender was held and win bidder was announced in late 2010.[11][12][13] On 17 February 2011 all five contracts were signed.[14][15]

Contract Notes Length
1 Hua Lamphong to Sanam Chai (2 stations underground, Bt11.65 billion, contractor ITD) 2.8 km
2 Sanam Chai to Tha Phra (2 stations underground, Bt10.82B, contractor CK) 2.6 km
3 Tao Poon to Tha Phra (8 stations elevated, Bt11.40B, contractor SH-Unique Joint venture) 11 km
4 Tha Phra to Lak Song (7 stations elevated, plus a park-and-ride venue and maintenance yard, Bt13.43B, contractor STEC) 10.5 km
5 Rolling stock and systems, Bt5.17 billion, contractor CK.

Construction commenced in mid-2011 for a scheduled 2016 opening but was delayed to 2019-2020. In August, 2017, BEM awarded the automatic fare collection ticket for the extension to Thales which will install its TransCity system.[16] The contract also includes ongoing training and future support. In September 2017, BEM announced that Siemens and ST Electronics Thailand were awarded the contract (Contract 5) to supply, install and maintain the E&S systems systems, install station platform screen doors and fit out the depot. Siemens also will supply 35 sets of rolling stock.[17]

In 2017, the cabinet approved the amendment of the Blue line concession[18] with BEM, and the new agreement was signed on 31 March 2017.[19] Under the new agreement, BEM will extend the service from Hua Lampong to Lak Song and Bang Sue to Tha Phra. The concession period was extended from 2029 to 2050.

The extension was opened in stages. The Hua Lamphong - Lak Song extension was opened on 29 July with full commercial service from 29 September 2019.

Hua Lamphong - Lak Song timeline of opening
Date Notes
18 July 2019 Opening date of Hua Lamphong - Lak Song section was announced. All trip between Hua Lamphong and Lak Song will be free until 29 September 2019.[20]
29 July 2019 Trial service from Hua Lumphong to Tha Phra was commenced. Service on extension only available from 10.00-16.00. Passengers required to change train at Hua Lumphong for a service on extended route.[21]
13 August 2019 Service hours were extended to 07.00-21.00.[22]
24 August 2019 Service was extended to Bang Wa.[23]
7 September 2019 Through service from Tao Poon to Bang Wa.[24]
21 September 2019 Service was extended to Lak Song. Service hours were extended to the line's normal service hours of 06.00-24.00.
29 September 2019 Full commercial service was commenced.

The Tao Poon - Tha Phra extension was opened on 29 November 2019 with full commercial service from 30 March 2020.

Tao Poon - Tha Phra timeline of opening
Date Notes
29 November 2019 Opening date of Tao Poon - Tha Phra section was announced. All trips between Tao Poon and Tha Phra will be free until 30 March 2020.[25]
4 December 2019 Trial service from Tao Poon to Sirindhorn was commenced. Service on extension only available from 10.00-16.00. Passengers required to change train at Tao Poon for a service on extended route.[26]
23 December 2019 Service was extended to Tha Phra.[27]
15 February 2020 Service hours were extended to the line's normal service hours of 06.00-24.00.[28]
1 March 2020 Through service from Tha Phra to Lak Song via Bang Sue[29]
30 March 2020 Full commercial service was commenced.[30]

Route

The MRT Blue Line starts at the upper platform of Tha Phra station. It runs on an elevated viaduct northward along Charan Sanitwong Road to Bang O station. Then turit turnsning eastwards crossing Chao Phraya River, entering Bang Pho station and Tao Poon Station in Bang Sue District. The line then descends to an underground section. It follows the Kamphaeng Phet, Phahon Yothin and Lat Phrao Roads, then turns south following Ratchadaphisek Road to QNSCC station. It then turns west following Rama IV Road. It passes Hua Lamphong station in Pathum Wan District, through Chinatown, then under the Chao Praya river before ascending onto an elevated viaduct to the lower platform of Tha Phra station. The line continues west along Phetkasem road to Lak Song station in Bang Khae, situated near Kanchanaphisek Road or Western Outer Ring road. It forms a circle loop around Bangkok.

Stations


Code
Station name
English
Station name
Thai
Connections
Location
BL01-U Tha Phra ท่าพระ  MRT  (South section) Bangkok Yai
BL02 Charan 13 จรัญฯ 13
BL03 Fai Chai ไฟฉาย Bangkok Noi
BL04 Bang Khun Non บางขุนนนท์ Commuter trains (Transfer at Charansanitwong Halt)
BL05 Bang Yi Khan บางยี่ขัน Bang Phlat
BL06 Sirindhorn สิรินธร
BL07 Bang Phlat บางพลัด
BL08 Bang O บางอ้อ
BL09 Bang Pho บางโพ Chao Phraya Express Boat Bang Sue
BL10 Tao Poon เตาปูน  MRT 
BL11 Bang Sue บางซื่อ Intercity trains, commuter trains (Transfer at Bang Sue Junction railway station) Chatuchak
BL12 Kamphaeng Phet กำแพงเพชร
BL13 Chatuchak Park สวนจตุจักร  BTS  (Transfer at Mo Chit station)
BL14 Phahon Yothin พหลโยธิน  BTS  (Transfer at Ha Yaek Lat Phrao station)
BL15 Lat Phrao ลาดพร้าว
BL16 Ratchadaphisek รัชดาภิเษก Din Daeng/Huai Khwang
BL17 Sutthisan สุทธิสาร
BL18 Huai Khwang ห้วยขวาง
BL19 Thailand Cultural Centre ศูนย์วัฒนธรรมแห่งประเทศไทย
BL20 Phra Ram 9 พระราม 9
BL21 Phetchaburi เพชรบุรี  ARL  (Transfer at Makkasan Station), Eastern Lines Ratchathewi
BL22 Sukhumvit สุขุมวิท  BTS  Watthana
BL23 Queen Sirikit National Convention Centre ศูนย์การประชุมแห่งชาติสิริกิติ์ Khlong Toei
BL24 Khlong Toei คลองเตย
BL25 Lumphini ลุมพินี Sathon
BL26 Si Lom สีลม  BTS  (Transfer at Sala Daeng station) Bang Rak
BL27 Sam Yan สามย่าน Pathum Wan
BL28 Hua Lamphong หัวลำโพง Intercity trains, commuter trains (Transfer at Bangkok Railway station)
BL29 Wat Mangkon วัดมังกร Samphanthawong
BL30 Sam Yot สามยอด Phra Nakhon
BL31 Sanam Chai สนามไชย Chao Phraya Express Boat
BL32 Itsaraphap อิสรภาพ Bangkok Yai
BL01-L Tha Phra ท่าพระ  MRT  (North section)
BL33 Bang Phai บางไผ่ Phasi Charoen
BL34 Bang Wa บางหว้า  BTS 
BL35 Phetkasem 48 เพชรเกษม 48
BL36 Phasi Charoen ภาษีเจริญ
BL37 Bang Khae บางแค Bang Khae
BL38 Lak Song หลักสอง

Rolling stock

Line is service by 54 three-car trains. Of which, 19 are first generation train and 35 are second generation. All trains are provided by Siemens. Trains are powered by 750v DC via third rail system, are air-conditioned and capable of traveling at up to 80 km/h.[31]

First Generation

19 three-car Siemens Modular Metro were ordered for the initial part of the line. Trains entering service on 3 July 2004.[32] In 2017, BEM starts removing some seats from the train to increase interior space to cope with rising number of passenger. In 2019, BEM stated that it is interesting in refurbish first generation train. Including CCTV camera and new dynamic route map replacing traditional ones.[33]

Second Generation

In 2017, BEM ordered 35 three-car Siemens Inspiro as part of the line extension program.[34][35] Under the contract, Siemens were to supply 35 trains and provide maintenance for ten years with a price tag of 20 billion baht. The fleet will be built in the Siemens plant in Vienna. First train arrived in 2019 with all trains expected to be delivered by early 2020.[36]

Operation

Inside a Blue Line train, Siemens Modular Metro
Fare gates in a Blue Line station
The platform of Phetchaburi MRT Station
The exit level of Kamphaeng Phet MRT Station
Vending machines at Wat Mangkon MRT station.
The concourse level of Sanam Chai MRT station

Blue line runs from Tha Phra to Lak Song via Bang Sue, Phra Ram 9 and Hua Lamphong, serving 38 stations. Line operated everyday from 6am to midnight with headway of under 7 minutes during rush hour and under 7 minutes during non-rush hour.[37]

All stations on the line are equipped with platform screen doors. Stations are build to accommodate six-car trains, but only three-car trains were used. Uniformed security personnel and security cameras are present at every platform. Passenger announcements on this line are made by journalist and news broadcaster Sarocha Pornudomsak.

The metro have 2 depots one in Huai Khwang district,[38] which is located between Phra Ram 9 and Thailand Cultural Centre station. And another in Chom Thong district, near Phetkasem 48 station.[39]

Ridership

After opening in 2004, initial ridership was 180,000 per day considerably lower than the projections of over 400,000. By 2016, the average daily ridership was 273,637.[40] By September 2017, BEM stated that average daily ridership had increased to 360,000 after the opening of the extension to Tao Poon.[41]

After the opening of the extension to Lak Song on 29 September 2019, average daily ridership increased to 400,000.[2][42]

Major accident record

On 17 January 2005, just after 09:15, an empty train returning to the depot collided with a peak-hour train filled with passengers at the Thailand Cultural Centre station. Around 100-262 people, depending on the news source, were injured.[43][44][45] Most of whom sustained only minor injuries, and the entire Metro network was shut down for two weeks. On 31 January 2005 then prime minister Thaksin Shinawatra ride the metro to increase public confident in the system.

After initial investigations, it was found that the empty train had run into problems shortly before the accident, grinding to a halt on a curve leading to the depot. The driver applied its brake and was waiting to be towed to the depot close to Thailand Cultural Centre station.

A rescue train was attempting to connect to the stalled train when the driver was told to release the brake while coupling had not yet been successful. It was then that the empty train began to roll backwards at a speed of ten meters per second, before smashing into the other train, which was carrying passengers. Therefore, it was believed that the incident was caused by negligence due to insufficient training of operation staff.[46] This accident also resulted in two damaged trains with heavily damaged areas limited to the two leading cars. The colliding speed was suspected to be about 60 km/h due to the appearance of damaged areas. However, one train, which was rebuilt from the repair of the minor-damaged cars, was already fitted for operation at the end of 2006 and the remaining one was still under heavy repair until mid of 2007; it was released into service in October 2007. The cost resulting from the accident might be a much higher figure than BMCL quoted, and it was expected to be at least 400 million baht, which was totally insured by a local insurance company.[43]

The Metro resumed full operations on 1 February 2005, and passenger numbers soon rose back to pre-crash levels, partly due to a temporary promotional fare scheme which allowed passengers to travel any distance on the MRT for only ten baht.

Future

Phutthamonthon Sai 4 Extension

Since 2011, there were requests from residents to extend the line further from Lak Song west to the Phutthamonthon area. The MRTA has indicated a willingness to undertake this extension. In July 2014, the MRTA submitted a request for 84 million baht to complete a route survey for a 7.8 km extension from Lak Song to Phutthamonthon Sai 4.[47] In late March 2017, the Transport Ministry stated that this 7.8 km extension would be submitted to Cabinet for approval in April 2017. The expected timeframe was for construction to commence in the 4th quarter of 2017.[48] However, the tender was delayed until late 2019. In late 2019, the project was put on hold indefinitely due to cost and low ridership expected.[49]

Lak Song-Phutthamonthon Sai 4 Extension
Code
Station name
English
Station name
Thai
Connections
Location
BL39 Phutthamonthon Sai 2 พุทธมณฑลสาย 2 Bang Khae/Nong Khaem
BL40 Thawi Watthana ทวีวัฒนา
BL41 Phutthamonthon Sai 3 พุทธมณฑลสาย 3
BL42 Phutthamonthon Sai 4 พุทธมณฑลสาย 4

See also

References

  1. "Archived copy" ทอดพระเนตรศูนย์ควมคุมการปฏิบัติการรถไฟฟ้ามหานคร ซึ่งตั้งอยู่บริเวณเขตหัวยขวาง - Ourking. Ourking (in Thai). 3 July 2004. Archived from the original on 15 April 2017. Retrieved 14 April 2017.CS1 maint: archived copy as title (link)
  2. https://www.khaosod.co.th/economics/news_2933591. Khaosod, 30 September 2019
  3. "BEM Investor presentation" (PDF).
  4. "M.R.T. Chaloem Ratchamongkhon Line". MRTA Website. Retrieved 24 April 2020.
  5. "Mass Rapid Transit Authority of Thailand". mrta.co.th. Retrieved 14 April 2017.
  6. "ลงนามสัญญาที่1 รถไฟสีม่วง ช.การช่างได้เฮ". thairath.co.th (in Thai). 26 August 2009. Retrieved 24 April 2020.
  7. Limited, Bangkok Post Public Company. "Purple Line to connect with MRT on Aug 11". https://www.bangkokpost.com. Retrieved 24 April 2020. External link in |website= (help)
  8. "Blue Line Tao Poon extension opening date (Thai)".
  9. "เปิดวิ่งเชื่อมต่อสถานีเตาปูน-บางซื่อ 12.00 วันนี้". https://www.bangkokbiznews.com/. Retrieved 27 April 2020. External link in |website= (help)
  10. mgronline.com https://mgronline.com/uptodate/detail/9510000061859. Retrieved 24 April 2020. Missing or empty |title= (help)
  11. "ช.การช่างคว้าประมูลรถไฟฟ้าสีน้ำเงินหัวลำโพง-ท่าพระ". https://www.posttoday.com. Retrieved 24 April 2020. External link in |website= (help)
  12. "ยูนิค-ชิโนไทย ชนะประมูลสร้างรถไฟฟ้าสีน้ำเงิน 2 สัญญา". thairath.co.th (in Thai). 2 June 2010. Retrieved 24 April 2020.
  13. "ช.เข้าวินวางรางสีน้ำเงิน รฟม.ยัน 5 สัญญาเซ็นได้ ต.ค.นี้". thairath.co.th (in Thai). 25 August 2010. Retrieved 24 April 2020.
  14. "Published | การรถไฟฟ้าขนส่งมวลชนแห่งประเทศไทย". mrta.co.th. Retrieved 24 April 2020.
  15. Railway Gazette https://www.railwaygazette.com/bangkok-to-complete-blue-line-loop/35788.article. Retrieved 16 November 2019. Missing or empty |title= (help)
  16. "Thales wins Bangkok metro fare collection contract". International Railway Journal. 23 August 2017.
  17. "Siemens consortium wins Bangkok Blue Line extension contract". International Railway Journal. 19 September 2017.
  18. mgronline.com https://mgronline.com/business/detail/9600000031726. Retrieved 24 April 2020. Missing or empty |title= (help)
  19. "BEM significant event in 2017" (PDF).
  20. "29 กรกฎาคมนี้ รฟม. และ BEM พร้อมเปิดให้ประชาชนทดลองใช้บริการรถไฟฟ้าสายสีน้ำเงินส่วนต่อขยาย ฟรี". metro.bemplc.co.th (in Thai). Retrieved 24 April 2020.
  21. "รัฐมนตรีว่าการกระทรวงคมนาคม กดปุ่มเปิดการทดลองให้บริการโครงการรถไฟฟ้าสายสีน้ำเงิน ส่วนต่อขยาย ช่วงหัวลำโพง – บางแค". metro.bemplc.co.th (in Thai). Retrieved 24 April 2020.
  22. "13 สิงหาคมนี้ รฟม. และ BEM ขยายเวลาเปิดให้ประชาชนทดลองใช้บริการรถไฟฟ้า". metro.bemplc.co.th (in Thai). Retrieved 24 April 2020.
  23. "24 สิงหาคมนี้ รฟม. และ BEM เปิดให้ประชาชนทดลองใช้บริการรถไฟฟ้า เพิ่มอีก 2 สถานี (สถานีวัดมังกร – สถานีบางหว้า)". metro.bemplc.co.th (in Thai). Retrieved 24 April 2020.
  24. "7 กันยายนนี้ รฟม. และ BEM เปิดให้ประชาชนทดลองใช้บริการรถไฟฟ้า สายสีน้ำเงินส่วนต่อขยาย เดินทางได้ต่อเนื่องจากสถานีเตาปูน – สถานีบางหว้า". metro.bemplc.co.th (in Thai). Retrieved 24 April 2020.
  25. "4 ธันวาคมนี้ รฟม. และ BEM พร้อมเปิดให้ประชาชนทดลองใช้บริการรถไฟฟ้าสายสีน้ำเงิน ส่วนต่อขยาย จากสถานีบางโพ – สถานีสิรินธร ฟรี". metro.bemplc.co.th (in Thai). Retrieved 24 April 2020.
  26. "Free travel between new BTS, MRT train stations". Bangkok Post. Retrieved 22 June 2020.
  27. "วันที่ 23 ธันวาคม 2562 รฟม. และ BEM เปิดให้ประชาชนทดลองใช้บริการรถไฟฟ้าสายสีน้ำเงินส่วนต่อขยาย ช่วงเตาปูน - ท่าพระ". metro.bemplc.co.th (in Thai). Retrieved 24 April 2020.
  28. "15 กุมภาพันธ์นี้ รฟม. และ BEM ขยายเวลาเปิดให้ประชาชนทดลองใช้บริการรถไฟฟ้า สายสีน้ำเงินส่วนต่อขยาย เตาปูน - ท่าพระ". metro.bemplc.co.th (in Thai). Retrieved 24 April 2020.
  29. "1 มีนาคมนี้ รฟม. และ BEM ให้บริการรถไฟฟ้าสายสีน้ำเงินส่วนต่อขยายเดินทางต่อเนื่อง โดยไม่ต้องเปลี่ยนขบวนรถที่สถานีเตาปูน". metro.bemplc.co.th (in Thai). Retrieved 24 April 2020.
  30. "30 มีนาคมนี้ รฟม. และ BEM พร้อมเปิดให้บริการรถไฟฟ้าสายเฉลิมรัชมงคลช่วงเตาปูน – ท่าพระ (สายสีน้ำเงินส่วนต่อขยาย) อย่างเป็นทางการ". metro.bemplc.co.th (in Thai). Retrieved 24 April 2020.
  31. "BEM บริษัททางด่วนและรถไฟฟ้ากรุงเทพจำกัด (มหาชน)". metro.bemplc.co.th (in Thai). Retrieved 26 April 2020.
  32. "Bangkok Metro". Railway Technology. Retrieved 26 April 2020.
  33. mgronline.com https://mgronline.com/business/detail/9620000110394. Retrieved 26 April 2020. Missing or empty |title= (help)
  34. Limited, Bangkok Post Public Company. "BEM to buy 35 more Blue Line trains". https://www.bangkokpost.com. Retrieved 26 April 2020. External link in |website= (help)
  35. "Siemens wins contract for Bangkok Blue line extension". Railway PRO. 19 September 2017. Retrieved 26 April 2020.
  36. "MRTA BEM Announce that the First New Train for the MRT Blue Line Extension Has Arrived". ryt9.com (in Thai). Retrieved 26 April 2020.
  37. "แผนที่เส้นทาง". metro.bemplc.co.th (in Thai). Retrieved 28 April 2020.
  38. mgronline.com https://mgronline.com/business/detail/9620000091636. Retrieved 28 April 2020. Missing or empty |title= (help)
  39. "Brochure issued by MRTA, detailing Blue line extension program" (PDF).
  40. "Financial Summary of the Consolidated Financial Statements of Bangkok Expressway and Metro Public Company Limited and its Subsidiaries" (PDF). 2017.
  41. "BEM to buy 35 more Blue Line trains". Bangkok Post. Bangkok. 15 September 2017.
  42. "Operator website. Reporting a line usage".
  43. "3 นาทีคดีดัง : ชนสนั่น! วันโกลาหล รถไฟฟ้าใต้ดิน (คลิป)". thairath.co.th (in Thai). 14 April 2019. Retrieved 27 April 2020.
  44. mgronline.com https://mgronline.com/crime/detail/9480000007248. Retrieved 27 April 2020. Missing or empty |title= (help)
  45. "Article with photos of an event".
  46. "Thai subway shut for safety probe". BBC News. 17 January 2005. Retrieved 13 May 2010.
  47. ลุ้นคลังไฟเขียวงบรถไฟ-รฟม [Win No Green Light Railway Company - MRTA]. Than Online (in Thai). 15 July 2014.
  48. "Blue Line extension, freeway pends Cabinet approval". The Bangkok Post. Bangkok. 26 March 2017. Retrieved 28 March 2017.
  49. "ชะลอทำรถไฟฟ้า3สายหวั่นผู้โดยสารน้อย/ไม่คุ้มทุน". ryt9.com (in Thai). Retrieved 24 April 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.