Putrajaya Monorail

The Putrajaya Monorail currently is an incomplete monorail system in Putrajaya, Malaysia. Putrajaya was originally planned to include a light rail system, but plans were changed, and a monorail plan selected instead, after the construction of tunnels for aforementioned system began. It called for two sublines; Line 1, which is a 12 km (7.5 mi) monorail route with 17 stations and Line 2, which is a 6 km (3.7 mi) monorail route with 6 stations.[3][4] In 2019, the government proposed a new light rapid transit (LRT) system may be built to revive the incomplete monorail project.[5] but currently, the government decided to resume this project.

Putrajaya Monorail Line
14
Overview
Native nameLaluan Monorel Putrajaya
TypeLight rail transit (LRT)
StatusUnder feasibility study.[1]
Shelved in 2004 (2004) due to federal budget constraints.
TerminiPutrajaya Sentral
Kajang & Cyberjaya
Stations25 stations
ServicesPresint 11 - Presint 3 - Presint 1 - Presint 14 - Presint 17 - Presint 6
Line number14
Operation
Planned opening2021 (2021)[2]
Depot(s)Presint 11 Depot
Technical
Line length18 km (11 mi)
Line 1: 13.2 km (8.2 mi)
Line 2: 6.8 km (4.2 mi)
Route map
Putrajaya Monorail
S16D
Kajang
1 9
S16C
Reko Sentral
S16B
Bandar Baru Bangi
possibile extension
to HSR and MRT
S16A
Kampung Dato' Abu
Abu Bakar Baginda
 HSR 
S16
Presint Diplomatik
S15
Alamanda Putrajaya
S14
Lebuh Perdana Timur
S13
Taman Putra Perdana
S12
Laman Perdana
S11
Dataran Putra
Depot
S01
S10
Dataran Wawasan
Presint 11
S02
S09
Lebuh Bestari
Presint 9
S03
S08
Dtrn Putrajaya
Putrajaya Sentral
S04
Line 2 Stabling
 ECR  7 12
S21
Presint 17
Presint 7
S05
Presint 8
S06
S20
Presint 18
Dataran Rakyat
S07
S19
Dataran Gemilang
S18
PICC
S17
Presint 6

Project Status

Construction was halted in 2004 (2004), and will probably resume as the city becomes more populated.[6] The monorail will include the Monorail Suspension Bridge, currently incomplete,[7] and the Putra Bridge.[8] The monorail line would allow transfers to KLIA Transit, connecting to Kuala Lumpur and Kuala Lumpur International Airport, at Putrajaya/Cyberjaya ERL station. The project originally cost RM400 million.[9]

Putrajaya Monorail Project Revival

MMC Corporation Berhad (MMC) has submitted a proposal to the Economic Council (EC) to revive the stalled monorail project since 2004 due to budget constraints. Hence, Land Public Transport Commission (SPAD) will now be conducting a feasibility study for monorail and tram services for both Putrajaya and Cyberjaya.[10]

Putrajaya Tram Proposal

However, the Federal Territories Ministry, its minister Datuk Seri Tengku Adnan Tengku Mansor hopes to build and get tram infrastructure going within the next three years. Now under the jurisdiction of the Economic Council, the minister sees the development of the tram system as an alternative solution to abandoned monorail projects and recommends due to it cheaper to build. [11][12][13]

SPAD will open up tenders for the tram system between Putrajaya and Bangi on June or August 2018 after getting the green light from EC. This move was announced by SPAD during their annual review of public transportation for 2017. The tram system was selected due to its relatively cheaper price of construction and operation compared to conventional rail systems.

The tram system is expected to be integrated with the existing and future rail lines between Putrajaya and Bangi and will also cover the distance between Cyberjaya and Kajang. The new MRT Sungai Buloh - Kajang Line only reaches Kajang but MRT Sungai Buloh - Serdang - Putrajaya Line will reach Putrajaya Sentral when it is completed in the future. The future HSR station located at Kampung Abu Bakar Baginda will be one of the expected stops along the planned tram route.

The stretch between Putrajaya and Bangi has been selected as the first phase to be constructed due to their wide roads, allowing the tram system to share the traffic.[14]

Putrajaya Tram proposal route
Kajang
 ETS  1 9
Kajang 2
Bandar Baru Bangi
Kampung Dato' Abu Bakar Baginda
 HSR 
Alamanda Putrajaya
Putrajaya Sentral
7 12
Cyberjaya City Centre
12
Bandar Cyberjaya

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.