Bangkok BRT

The Bangkok BRT is a bus rapid transit system in Bangkok, Thailand. Of five routes that were originally planned, only one line has been operating since 2010, with the other routes cancelled. Bangkok Metropolitan Administration (BMA) announced the whole system might be cancelled at the end of April 2017[1] due to low ridership and financial losses, however a subsequent opinion survey carried out by the BMA found there was a demand for the service to be retained.[2] In March 2017 the Bangkok Governor announced the service would continue, with increased ticket prices[3] and changed operator to Bangkok Mass Transit System Public Company Limited.

Bangkok BRT

 BRT 
A bus at the Sathon terminus
Overview
OwnerBangkok Metropolitan Administration
LocaleBangkok
Transit typeBus rapid transit
Number of lines1
Number of stations12
Daily ridership25,000/day
Operation
Began operation29 May 2010
Operator(s)Bangkok Mass Transit System Public Company Limited
Number of vehicles25
Technical
System length16.5 km (10.25 mi)
Average speed30 km/h
Top speed60 km/h

The 16 kilometres (9.9 mi) route has twelve stations in the centre of the road that give at grade access to the right hand side of the buses. Both termini connect to the Silom Line of the BTS Skytrain; at Chong Nonsi (S3) and at the newly opened Talat Phlu (S10). The buses used are all Sunlong SLK6125CNG buses. The flat fare is 5 baht, and will be increased to 15 baht.

Bangkok Mass Transit map, Yellow line is BRT route

Background

It is owned by Krungthep Thanakom PCL, the holdings enterprise of the Bangkok Metropolitan Administration (BMA), and operated by Bangkok Mass Transit System PCL (BTSC), the operator of the BTS Skytrain.

Plans for a bus rapid transit system in Bangkok were made in 2004 by the BMA and the Ministry of Transport's Office of Transport and Traffic Policy and Planning. In 2005, the BMA settled on a master plan consisting of fourteen BRT routes. Construction on the first route, SathonRatchaphruek, began in 2007. The route opened for trial runs on 29 May 2010, and officially opened on 14 February 2011.[4][5]

The system's island platforms are accessed by elevated enclosed station facilities, and it shares the ticketing system of the BTS Skytrain. The buses run on dedicated bus lanes blocked to the main traffic, which is why even after three years since its inception, the system is still being criticised by motorists as they feel that losing one lane to the BRT has worsened the traffic in the area.[6]

Originally, five BRT routes were planned to be open by 2013. The additional four routes were: Mo Chit – Government Complex – Nonthaburi, Sathon – Suk Sawat, Don Mueang – Min Buri–Suvarnabhumi, and Min Buri – Srinagarindra – Samrong. However, it was announced in September 2010 that The Mo Chit – Government Complex route was cancelled, and the other planned routes were expected to be abandoned as well.[7]

Sathon–Ratchaphruek route

BRT Sathorn Station

The first route from Sathon to Ratchaphruek via Narathiwat Ratchanakharin and Rama III roads, opened to the public on 29 May 2010. This was later than 12 August 2008 as originally planned. The service ran as a free trial until the end of August 2010, followed by a flat fare of THB10 from September 2010. That flat fare was decreased to THB5 on January 2011.[8]

Part of the route is physically separated from the remaining carriageway by way of surface-mounted dividers, while other parts of the route are high-occupancy vehicle lanes with a minimum occupancy level of three occupants (T3). At some intersections, the bus has to share space with other vehicles, disrupting an efficient exploitation. The vehicles have a guide system, which is only used at the stations to ensure a minimum gap between the station and the bus. The stations are all located in the centre of the road, which means that the BRT lanes are located against the road median, and the doors are on the right hand side of the buses (Thailand drives on the left). Access from the stations to the vehicles is leveled, but are in some way accessible by ramps for physically handicapped.

Stations

Station Code Station Name (English) Station Name (Thai)
B1 Sathon สาทร
B2 Akhan Songkhro อาคารสงเคราะห์
B3 Technic Krungthep เทคนิคกรุงเทพ
B4 Thanon Chan ถนนจันทน์
B5 Nararam III นราราม 3
B6 Wat Dan วัดด่าน
B7 Wat Pariwat วัดปริวาส
B8 Wat Dokmai วัดดอกไม้
B9 Rama IX Bridge สะพานพระรามเก้า
B10 Charoenrat เจริญราษฎร์
B11 Rama III Bridge สะพานพระรามสาม
B12 Ratchapruek ราชพฤกษ์

See also

References

  1. "Bye Bye BRT: Bus service to stop at end of April". Coconuts Bangkok. 2017-02-07. Retrieved 2017-02-08.
  2. "Improve BRT, don't scrap it". Bangkok Post. Retrieved 2017-03-02.
  3. Reporter, Asaree Thaitrakulpanich, Staff (2017-03-27). "It's Official: Bangkok BRT Won't be Shut Down". Khaosod English. Archived from the original on 2017-03-27. Retrieved 2017-03-28.
  4. BRT สาทร - ราชพฤกษ์ รถโดยสารด่วนพิเศษสายแรกของประเทศไทย (BRT commemorative booklet) (PDF). Bangkok Metropolitan Administration.
  5. "First rapid bus line opens for free trial". Bangkok Post. 30 May 2010.
  6. Bangkok Post. Available from http://www.bangkokpost.com/print/355200/
  7. "BRT project stalls, private firm at helm". Bangkok Post. 10 September 2010. Retrieved 16 January 2012.
  8. Bangkok BRT official Facebook page
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.