Kannur International Airport

Kannur International Airport (IATA: CNN, ICAO: VOKN) is an international airport serving the district of Kannur (at Mattanur), one of the northern districts in the state of Kerala, India. The airport spreads about 2,300 acres (930 ha). It is located 28 km east of Kannur town, and 24 km east of Thalassery town, near the municipality of Mattannur. It is owned and operated by Kannur International Airport Limited (KIAL), a public–private consortium. The airport opened for commercial operations on 9 December 2018.[4]

Kannur International Airport
Summary
Airport typePublic
Owner/OperatorKannur International Airport Limited (KIAL)
ServesKannur
Wayanad
Vadakara
Kasaragod
Kodagu (Karnataka)
Mysore (Karnataka)
Mahé (Puducherry)
LocationMattanur, Kerala, India
Opened9 December 2018 (2018-12-09)
Hub for
  • Go Air
Elevation AMSL76 m / 249 ft
Coordinates11.92°N 75.55°E / 11.92; 75.55
Websitekannurairport.aero
Map
CNN
CNN
Runways
Direction Length Surface
m ft
07/25 3,050 10,007 Asphalt concrete
Statistics (2019-2020)
Passenger movement1,583,600
Aircraft movement15,131
Source AAI[1][2] [3]

The Kannur Airport is expected to serve more than one million passengers annually and authorities estimate the number will increase five-fold by 2025.[5] The first aircraft to land was an IAF (Indian Air Force) aircraft that landed at the airport on 29 February 2016.[6] The first trial passenger flight operation conducted on 20 September 2018 using a Boeing 737-800 aircraft from Air India Express.[7][8] On the inaugural day, 9 December 2018, an Air India Express flight IX 715 (Boeing 737-800) took off to Abu Dhabi at 10:13 (IST), becoming the first commercial passenger aircraft to depart from Kannur International Airport.[9][4][10][11] The Airport was inaugurated by Chief Minister of Kerala, Pinarayi Vijayan in the presence of Minister of Civil Aviation, Suresh Prabhu.

Landscaping at the Airport

History

Kannur had an airstrip used for commercial aviation as early as 1935 when TATA airlines operated weekly flights between Bombay and Trivandrum – stopping at Goa and Cannanore.[12] The operator started service to Kerala on 29 October 1935. The long-standing demand for an airport was only conceptualized in 1997, when C. M. Ibrahim the then union minister of civil aviation, backed the proposal for an airport in the district. The vast extent of land at Moorkhanparamba near Mattannur was identified for the project a few months later following a hectic search for land for developing the proposed airport. The formal commencement of construction activities at the project site on 17 December at a function attended by Civil Aviation Minister Praful Patel and Chief Minister E. K. Nayanar. Though the State government accorded sanction for the Kannur International Airport project in January 1998 and appointed Kerala Industrial Infrastructure Development Corporation (KINFRA) as the nodal agency for its implementation, it had to wait for a decade till it was finally approved by the Central government in January 2008. During the period, a private agency appointed by Kerala Industrial Infrastructure Development Corporation (KINFRA) to study techno-economic feasibility report submitted its report.[13] The earlier site proposed at Madayipara was dropped owing to ecological concerns. Two vast plateaus near Mattannur were identified for the airport, namely Moorkhanparamb and Velliyamparamb, with about 1300 acres and 800 acres of land to be acquired from each respectively.[14][15][16][17]

After a prolonged wait, the airport received in-principle approval from the Ministry of Civil Aviation and Union cabinet in January 2008.[18] Land acquisition began in December 2008 after issuing notifications and fixing compensation.[19] The public company Kannur International Airport Limited (KIAL), under the PPP model, was registered in October 2009.[20] The foundation stone for the airport was laid on 17 December 2010 by then-Chief Minister V. S. Achuthanandan.[21] On 26 November 2013, KIAL and Larsen & Toubro Ltd are scheduled to sign a contract on construction work at the airport. In January 2014, The Kerala State Government Minister for Excise and Ports announced the Kerala State Government and AAI plan to sign an MoU on the equity structure of Kannur International Airport Limited.[22]

Construction work of the airport was inaugurated by Defence Minister and senior Congress leader A. K. Antony on 2 February 2014. On 29 February 2016, The first trial flight was landed and Chief Minister Oommen Chandy Flag off for the inauguration of Runway.[23]

Kannur International Airport commenced operations on 9 December 2018.[24] The first commercial aircraft to operate out of the airport was Air India Express IX 715 (Boeing 737-800) to Abu Dhabi, which took off at 10:13 (IST) on the same day.[25][11] The flight was jointly flagged off by the Chief Minister of Kerala, Pinarayi Vijayan and Union Minister for Civil Aviation, Suresh Prabhu.[25]

Construction

By August 2010 acquisition of about 1200 acres of land was completed in two phases, and acquisition of another 780 acres was in progress for the third phase.[26][27]

In July 2011, the Oommen Chandy government decided to make Airports Authority of India a consultant tasked with preparing a revised techno-economic feasibility report and a new master plan and design.[28] As the Airports Authority of India failed to submit the report in time, the consultancy was canceled and Cochin International Airport (CIAL) was entrusted to prepare the detailed project report, but the floating of tenders for construction was further delayed as experts found several technical flaws in the design prepared by CIAL.[29][30]

Land acquired by the government under KINFRA was transferred to KIAL earlier in February 2012.[31] In August 2012, Mumbai based company STUP Consultants Pvt Ltd. was made consultant to review the revised report by CIAL and to assist KIAL in other aspects of the project, but the agreement was canceled within two weeks as it was found that the company had been blacklisted in other states.[32][33] Fresh bids were solicited and Hong Kong-based AECOM Asia was awarded the consultancy.[34][35] The project office was inaugurated at Mattannur in December 2012.[36]

EPC-I & EPC-II

It was decided to build the airport in two stages of engineering, procurement, and construction (EPC). The first stage, EPC-I included complete earthwork, runway, taxiway, apron, ground lighting and associated infrastructure such as perimeter and operational walls.

The second stage, EPC-II, involved the integrated terminal building, air traffic control tower, administrative and technical blocks, and facilities in the buildings such as aerobridges, escalators, elevators and counters.[37] Infrastructure and engineering conglomerate Larsen & Toubro (L&T) was awarded work for EPC-I on 27 November 2013, after inviting bids.[38] Airport work was flagged off by the then Defense Minister A.K. Antony at a public function in Mattannur on 2 February 2014.[39] L&T also won the tender for EPC-II works including the construction of the passenger terminal building (PTB) on 25 June 2014.[40] A huge amount of earthwork was carried out at the site including the cutting and filling of a total 2,340,000 cubic metres (3,060,000 cu yd) of land at a maximum rate of 70,000 cubic metres (92,000 cu yd) per day.[41] About 50% of the land works and foundation and piling work for constructing the PTB and air traffic control tower were completed by March 2015.[42] By August 2015 about 60% of the runway was completed. Steps were initiated to procure lifts, a baggage handling system, passenger boarding bridges, and the four Airfield Crash Fire Tenders.[43] About 70% of the work on the runway, apron and associated work, and 52% of the PTB and allied work was completed by December 2015.[44] Works for a 28,000 square metres (33,000 sq yd) fuel farm also began the same month.[45] The then Kerala Airports Minister K. Babu ruled out the popular demand to extend the runway to 4,000 metres (4,400 yd).[46] Meanwhile, the third phase of land acquisition involving about 785 acres on Velliyamparmb, which began in 2011, had been progressing at a very slow pace and only 612 acres were acquired in five years.[47] The late decision to acquire more land for a runway extension from 3,050 metres (3,340 yd) to 3,400 metres (3,700 yd) on the western side, in the finishing stages of the project, triggered protests from residents.[48] A trial landing was conducted on a completed 2,400 metres (2,600 yd) runway by a 14-seater code B aircraft on 29 February 2016. The air traffic control tower was not involved as it was still under construction. Technical assistance of the Aviation Control of the Calicut airport was sought for the landing. No runway calibration, or testing of flight parameters, was done during the landing. The trial landing was organized as a major event by the authorities and involved extensive public participation. The Oommen Chandy government faced fierce criticism for organizing such an event when the whole airport project was not complete. The opposition termed it an "election stunt" as Kerala was going to the polls in the coming months. Around 30 lakh (US$42,000) were spent on the event.[49][50][51][52][53]

By May 2016, the 3,050 metres (3,340 yd) runway was completed with work on the 150 metres (160 yd) grading side strip on both ends progressing. 68% of the PTB, 75% of the ATC tower and much of the work for the fuel farm was completed. Work on the ancillary buildings – fire rescue station, power house, the area for the India Meteorological Department (IMD), sewage treatment plant, service block, and the airfield ground lighting substation were progressing.[54] The newly-elected Pinaryi government decided to begin land acquisition to extend the runway to 4,000 metres (4,400 yd) in August 2016.[55] 82% of the construction of the PTB, and 90% of the work on air side was completed by February 2017. By September 90% of the work on the PTB and the city side works including flyover, PTB roofing etc. was completed. Time-consuming interior work on the PTB was in progress, runway end safety area works were to resume after the rains. The PTB is scheduled to be fully completed by September 2018.

Phase I & Phase II

The Phase I expansion period is from 2016–17 to 2025–26. It includes a 4,000 metres (4,400 yd) runway extension, a full-length taxiway, commissioning of a fuel farm, an aviation academy etc. and developing city side facilities. Works for the Phase-I expansion are already progressing. A cargo terminal and cargo complex which was initially in Phase-II has been shifted to Phase I and is under construction. The Phase II expansion will happen from 2026–27 to 2045–46. It includes another runway and a dedicated domestic terminal at Veliamparamba, and a long flyover to link it with Moorkhanparamba.[47][56][57][58][59]

Management

Kannur International Airport is the second greenfield airport to be built on a public private partnership (PPP) platform in Kerala. The airport is managed by Kannur International Airport Ltd.(KIAL), a public company.[60] Former Air India chief V. Thulasidas IAS is the current Managing Director of KIAL.[61] Pinarayi Vijayan, chief minister of Kerala, holds the post of chairman. The principle investor in KIAL, the Government of Kerala, owns 32.86% of the company's shares. Other shareholders are: 22.54% by State and Central Public Sector Undertakings, 9.39% by Airports Authority of India, 35.21% by others, including QIBs, Individuals, Companies, Cooperative, Banks/Societies,   and other legal entities as approved by the Board of Directors from time to time.[62]

Facilities

Terminals

Handloom model at the departure area

The airport will have an integrated passenger terminal for both international and domestic travellers with a floor area of 97,000 m2 (1,040,000 sq ft) for arrival and departure separately. It will be able to handle up to 2,000 passengers during peak hours with its unique swing facility. It features six aerobridges with 48 check-in counters, 32 emigration counters, 16 customs counters, four conveyor belts and access control inside the terminal. The passenger terminal will use the swing facility. The international gates will be used for domestic operations when there are no international flights. The passenger terminal building has a double skin aluminium roofing system and efficient LED lighting adopting the green building concept.[63][40][64][56]

Cargo

A cargo terminal complex having an 8-floor space of 32,000 m2 (340,000 sq ft) will also be constructed.[65][66]

Airlines and destinations

A GoAir A320NEO taxiing to the gate
AirlinesDestinationsRefs.
Air India Delhi, Kozhikode [67]
Air India Express Abu Dhabi, Bahrain, Doha, Kuwait, Muscat, Riyadh, Sharjah [68][69][70][71]
GoAir Abu Dhabi, Dammam, Dubai–International, Mumbai, Muscat [72][73][74][75]
IndiGo Thiruvananthapuram, Bangalore, Chennai, Doha, Goa, Hubli, Hyderabad, Kochi [76][77][78][79]

Operational infrastructure

Kannur Airport has one runway, 07/25 which is 3,050 by 45 metres (10,007 by 148 feet).[80] Runway 07/25 orientation permits an obstacle-free approach. Runway 25's end will have Category I approach lighting and the 07 end will have simple approach lighting. The runway will be extended to 4,000 metres (13,000 ft) after the airport is commissioned. Land acquisition of about 260 acres is underway for this purpose. The runway will have a full-length parallel taxiway and its apron will allow 20 wide-bodied aircraft to park simultaneously.[81][57][82][83][56]

The airport's air navigation services and air traffic control will be handled by the Airports Authority of India (AAI). The ATC tower will be equipped with Doppler variable omni range and distance measuring equipment, air traffic system automation, instrument landing system, voice recorder, and a GPS clock system. It will have VHF communication facilities and equipment for obtaining radar signals from the Cochin International Airport. The tower is 30 metres (98 ft) high and has a floor area of 1,923 square metres (20,700 sq ft).[84][42][85]

Various weather monitoring, weather forecasting and alert systems are being installed at the airport by the India Meteorological Department (IMD). The Automated Weather Observing System (AWOS) for weather observations, is supplemented by climatological data, weather forecasting and aerodrome warning from IMD. The IMD will send minute-by-minute weather updates in the form of audio messages directly to pilots, instead of passing the information manually to the ATC and through them to the pilot. The information could include wind speed, gusts and direction, temperature and dew point, visibility, density, altitude, thunderstorm, lightning etc. ensuring smooth aircraft operation.[86]

The airport will have a 300 metres (330 yd)-long, 90 metres (98 yd)-wide runway end safety area (RESA) on both ends of the runway. This reduces the risk of casualties and damage to aircraft in the event of an undershoot, overshoot or excursion from the runway. The RESA is protected with a reinforced earth wall. The airport will have an isolation bay towards the 07 side. An isolation bay, with a diameter of 125 metres (137 yd) is a special parking space created for an aircraft facing an exigency like hijack or bomb threat.[87][88][89][56]

Various ground support equipment (GSE) will be available to service the aircraft between flights. These include dollies, chocks, aircraft service stairs, aircraft refuelers, transporters, catering vehicles, and belt loaders. Ground handling in the airport will be managed by Air India Air Transport Services Ltd. (AI-ATSL).

Aviation fuel farm

The airport has a 28,000 square metres (33,000 sq yd) fuel farm constructed and operated as a joint venture company floated by KIAL and Bharat Petroleum Corporation Ltd. (BPCL) — the BPCL-KIAL Fuel Farm Private Ltd. The Rs. 17-crore fuel farm has underground tanks for aviation fuel storage and will provide fuel for aircraft operating from the airport. BPCL has a Rs. 170-crore stake in KIAL.[90]

MRO

Kannur Airport will have an aircraft maintenance, repair and overhaul unit- MRO facility. A large maintenance terminal is dedicated for this. The facility is expected to cater to both narrow and wide-bodied aircraft. The MRO will undertake maintenance work on aircraft and their components, such as jet engines, landing gear, air frames and components and will involve line maintenance and hangars.[91][56]

Enclaves

The airport will have an Indian Navy air enclave on convert ten acres of land. The location is a priority for the Navy since the Ezhimala Naval Academy, the only naval academy in India, and the largest in Asia, is just 60 kilometres (37 mi) away from the airport. Ezhimala is also a strategic defense location. The original demands for transfer of the ten acres of airport land to the Navy included having a representative from Southern Naval Command on KIAL's board of directors, to set up the enclave. This was dropped by the Navy. The land was transferred to the Navy on a long-term lease against token rent for establishing the enclave.[92][93][94]

The Indian Air Force will have a presence at the airport with a separate enclave set up on ten acres of land. Defense officials had approved the enclave in view of the airport's strategic location. Kannur Cantonment, the only Army Cantonment in Kerala is 30 kilometres (19 mi) away from the airport. The land provided on a long-term lease, against a token rent, is located beside the operational apron of the airport. Work on the enclave's hangars and administrative buildings is underway.[93]

An enclave will be set up by Indian Coast Guard (ICG) at the Kannur airport to augment air surveillance along the coast. India's first Coast Guard Academy is located at Azhikkal, 36 kilometres (22 mi) from the airport. Considering this, the strategic location and the proximity to the coast of the airport the ICG had sought 20 acres of airport land. The KIAL board authorized the airport's managing director to provide 10 acres on a long-term lease against token rent to establish the enclave.[93][95][96]

Aviation academy

An aviation academy will be set up in the airport by the Rajiv Gandhi Aviation Academy and Technology on two acres of land allotted for it. The institute will offer students courses in aeronautics and provide flight training.[97]

HAL helicopter manufacturing base

Hindustan Aeronautics Limited (HAL) had sought airport land from KIAL to have a manufacturing base for helicopters. 80 acres of land had been allotted by the board to HAL in 2014. The HAL complex will include helicopter manufacturing for exporting, helicopter maintenance and repair, and a helicopter pilot training centre.[91]

Connectivity

Pre-paid taxi service is available at the airport round the clock. KSRTC provides service to various destinations in Kannur, Kozhikode and Malappuram districts from the airport. The nearest town is at Mattannur situated 5 km away from the airport which has bus connectivity to various parts of Kannur district, Kodagu district and Mysore. Autorickshaw service is available at the airport to Mattannur. The closest railway stations are at Thalassery (25 Km) and Kannur (27Km) from the airport.

See also

References

  1. "Traffic News for the month of March 2020: Annexure-III" (PDF). Airports Authority of India. 22 May 2020. p. 3. Retrieved 22 May 2020.
  2. "Traffic News for the month of March 2020: Annexure-II" (PDF). Airports Authority of India. 22 May 2020. p. 3. Retrieved 22 May 2020.
  3. "Traffic News for the month of March 2020: Annexure-IV" (PDF). Airports Authority of India. 22 May 2020. p. 3. Retrieved 22 May 2020. url-status=live}}
  4. "Kannur airport inauguration". OnManorama. Retrieved 9 December 2018.
  5. "Come..let's fly from Kannur': Kerala's fourth international airport to open on Dec 9".
  6. "KIAL".
  7. "First trial passenger flight lands at new Kannur International Airport".
  8. "Trial landing at Kannur airport".
  9. "Kannur International Airport inauguration LIVE: First flight flagged off, operations commenced". The Indian Express. 9 December 2018. Retrieved 9 December 2018.
  10. "First flight from Kannur airport flagged off". Mathrubhumi. Retrieved 9 December 2018.
  11. "IX715 - Air India Express IX 715 Flight Tracker". FlightStats. Retrieved 9 December 2018.
  12. Sudhakaran, P. "Kannur flew, way before its first airport - Times of India". Timesofindia.indiatimes.com. Archived from the original on 18 May 2017. Retrieved 24 December 2017.
  13. "Kannur airport set to be a dream come true".
  14. "Kannur airport set to be a dream come true". The Hindu. 21 November 2010. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  15. "Kannur airport: land acquisition process on - KERALA". The Hindu. 22 August 2010. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  16. "Land for airport: new rates sought - KERALA". The Hindu. 6 December 2011. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  17. "airport land map". The Hindu. 26 November 2012. ISSN 0971-751X. Archived from the original on 7 January 2018. Retrieved 8 December 2017.
  18. KERALA. "Cabinet clearance for Kannur airport - KERALA". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  19. KERALA. "Land acquisition for Kannur airport from December - KERALA". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  20. KERALA. "Land for airport by January - KERALA". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  21. "VS lays foundation stone for Kannur international airport". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  22. "CAPA-Kannur International Airport".
  23. "1st Trial Flight Lands in North Kerala".
  24. "Kannur International Airport inauguration LIVE: First flight flagged off, operations commenced". The Indian Express. Retrieved 9 December 2018.
  25. "First flight from Kannur airport flagged off". Mathrubhumi English. Retrieved 9 December 2018.
  26. "Land acquisition process reviewed - KERALA". The Hindu. 17 August 2010. Retrieved 24 December 2017.
  27. "Kannur airport set to take wings - Today's Paper". The Hindu. 21 November 2010. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  28. "Kannur airport's first stage by 2014 - KERALA". The Hindu. 15 July 2011. Retrieved 24 December 2017.
  29. "CIAL to prepare project report for Kannur airport". The Hindu. 12 December 2011. Retrieved 24 December 2017.
  30. "Kannur airport project to be delayed - NATIONAL". The Hindu. 26 June 2012. Archived from the original on 17 January 2014. Retrieved 24 December 2017.
  31. "Archived copy". Archived from the original on 7 January 2018. Retrieved 7 January 2018.CS1 maint: archived copy as title (link)>
  32. "KIAL signs pact with STUP for consultancy services - KERALA". The Hindu. 22 August 2012. Retrieved 24 December 2017.
  33. "Kannur airport: consultancy pact with STUP cancelled - NATIONAL". The Hindu. 7 September 2012. Retrieved 24 December 2017.
  34. "KIAL to invite fresh bids - KERALA". The Hindu. 13 September 2012. Archived from the original on 13 December 2017. Retrieved 24 December 2017.
  35. "Work on Kannur airport to begin soon - KERALA". The Hindu. 17 November 2012. Retrieved 24 December 2017.
  36. "Kannur airport in 3 years: Chandy - KERALA". The Hindu. 8 December 2012. Archived from the original on 31 August 2014. Retrieved 24 December 2017.
  37. "Kannur airport: work on EPC II in full swing - NATIONAL". The Hindu. 19 August 2013. Archived from the original on 30 August 2014. Retrieved 24 December 2017.
  38. "KIAL, L&T ink Rs. 694-crore pact - KERALA". The Hindu. 27 November 2013. Archived from the original on 30 August 2014. Retrieved 24 December 2017.
  39. "Antony flags off Kannur airport works". The Hindu. Archived from the original on 20 February 2014. Retrieved 24 December 2017.
  40. "Tender approved for Kannur airport - KERALA". The Hindu. 26 June 2014. Retrieved 24 December 2017.
  41. "Kannur airport runway work on course". The Hindu. 16 June 2014. Archived from the original on 13 December 2017. Retrieved 24 December 2017.
  42. "Hectic pace to Kannur airport work - KERALA". The Hindu. 26 March 2015. Retrieved 24 December 2017.
  43. "Kannur airport in take-off mode - NATIONAL". The Hindu. Retrieved 24 December 2017.
  44. "First test flight to Kannur airport deferred - KERALA". The Hindu. Retrieved 24 December 2017.
  45. "Fuel farm work begins at Kannur airport site". The Hindu. Retrieved 24 December 2017.
  46. "Minister rules out Kannur airport runway extension". The Hindu. Retrieved 24 December 2017.
  47. "First flight to Kannur on 29 Feb". The Hindu. 17 February 2016. Archived from the original on 13 December 2017. Retrieved 24 December 2017.
  48. "All-party meet on KIAL land survey - KERALA". The Hindu. Retrieved 24 December 2017.
  49. "Kannur trial landing a success". The Hindu. 1 March 2016. Retrieved 24 December 2017.
  50. "First flight to land in Kannur today - KERALA". The Hindu. 29 February 2016. Retrieved 24 December 2017.
  51. "Political turmoil over Kannur airport project". The Hindu. 12 October 2015. Retrieved 24 December 2017.
  52. "Archived copy" (PDF). Archived from the original (PDF) on 1 July 2017. Retrieved 24 December 2017.CS1 maint: archived copy as title (link)
  53. "Archived copy" (PDF). Archived from the original (PDF) on 6 June 2017. Retrieved 24 December 2017.CS1 maint: archived copy as title (link)
  54. "3,050-m runway ready in Kannur". The Hindu. 1 May 2016. Retrieved 24 December 2017.
  55. "Land acquisition for runway work soon: CM - KERALA". The Hindu. 8 August 2016. Retrieved 24 December 2017.
  56. "Archived copy". Archived from the original on 3 April 2016. Retrieved 9 June 2016.CS1 maint: archived copy as title (link)
  57. "With mega runway, Kannur airport in top four - NATIONAL". The Hindu. Retrieved 24 December 2017.
  58. "Kannur airport: Runway ready, final touch-up in progress | politics | Kannur Airport". English.keralakaumudi.com. 10 April 2017. Retrieved 24 December 2017.
  59. "Airport consultant reviewing report". The Hindu. 26 November 2012. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  60. "Airport Project". Kannurairport.in. Archived from the original on 8 June 2017. Retrieved 24 December 2017.
  61. "Home-Kannur Airport". Archived from the original on 2 August 2018. Retrieved 25 May 2014.
  62. "Kannur Airport-About us".
  63. "Kannur airport to have 'swing' facility". The Hindu. Archived from the original on 8 July 2014. Retrieved 24 December 2017.
  64. "Archived copy" (PDF). Archived from the original (PDF) on 6 June 2017. Retrieved 23 November 2017.CS1 maint: archived copy as title (link)
  65. "Kannur airport gearing up for September launch - KERALA". The Hindu. 8 February 2017. Retrieved 24 December 2017.
  66. "Kannur airport by Sept next". The Hindu. Archived from the original on 20 September 2017. Retrieved 24 December 2017.
  67. "Kannur-Delhi flight service 5 days a week". mathrubhumi.com. Retrieved 8 March 2019.
  68. "Kannur Airport: Ticket booking to start on Monday". mathrubhumi.com. Retrieved 11 November 2018.
  69. "AI Express to launch Doha flights from Kannur next". gulf-times.com. Retrieved 12 November 2018.
  70. "Air India Express to commence Kannur-Sharjah service on 10 December 2018". centreforaviation.com. Retrieved 14 November 2018.
  71. "Weekly flights to Sharjah, Muscat to be introduced from Kannur Airport".
  72. "Kannur Launch GoAir". GoAir. Retrieved 7 December 2018.
  73. "GoAir to start KannurMuscat flights from 28 Feb". economictimes.indiatimes.com. 18 January 2019. Retrieved 18 January 2019.
  74. https://www.routesonline.com/news/38/airlineroute/282748/goair-adds-kannur-abu-dhabi-service-from-march-2019/
  75. "GoAir expands International network in July/August 2019". routesonline.com. 16 July 2019.
  76. "Archived copy". Archived from the original on 30 March 2019. Retrieved 21 January 2019.CS1 maint: archived copy as title (link)
  77. "IndiGo new flights". goindigo.com. Retrieved 17 December 2018.
  78. "IndiGo to begin daily flights from Doha to the newest airport in India". The Peninsula Qatar. Retrieved 19 January 2019.
  79. https://timesofindia.indiatimes.com/business/india-business/indigo-to-operate-daily-flights-from-chennai-hyderabad-and-hubli-to-kannur/articleshow/67145738.cms. Missing or empty |title= (help)
  80. "About Us". Kannurairport.in. Archived from the original on 8 June 2017. Retrieved 24 December 2017.
  81. "Kannur International Airport New Airport Profile | CAPA". Centreforaviation.com. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
  82. "95 pc work completed in Kannur Airport, test flight in Feb | new airport in Kerala at Kannur". English.keralakaumudi.com. 17 December 2017. Retrieved 24 December 2017.
  83. "Kannur airport take-off to be delayed - KERALA". The Hindu. 3 July 2017. Retrieved 24 December 2017.
  84. "Agreements signed for airport - KERALA". The Hindu. 21 November 2014. Retrieved 24 December 2017.
  85. "Kannur airport nearing take-off stage". The Hindu. Retrieved 24 December 2017.
  86. "Weather alert system for Kannur airport - KERALA". The Hindu. 20 September 2014. Retrieved 24 December 2017.
  87. "Flights to take off from Kannur in 2016 - KERALA". The Hindu. 7 December 2013. Archived from the original on 30 August 2014. Retrieved 24 December 2017.
  88. "Photo gallery - Construction of Reinforced Earth Wall at Resa 07 side in progress as on 20.02.2017". Kannurairport.in. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
  89. "Licensing procedure for Kannur airport begins - KERALA". The Hindu. 5 September 2014. Archived from the original on 6 September 2014. Retrieved 24 December 2017.
  90. "Fuel farm work begins at Kannur airport site - KERALA". The Hindu. Retrieved 24 December 2017.
  91. "Kannur International Airport - Malabar, Ready for Take Off?". Thedollarbusiness.com. Archived from the original on 15 December 2017. Retrieved 24 December 2017.
  92. "Norms relaxed for Naval Air Enclave - KERALA". The Hindu. 23 November 2012. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
  93. "Defence enclaves for Kannur airport - KERALA". The Hindu. Archived from the original on 26 June 2014. Retrieved 24 December 2017.
  94. "Campus". INA. Archived from the original on 24 October 2017. Retrieved 24 December 2017.
  95. "Coast Guard Academy to be ready in over 3 years: Director General - KERALA". The Hindu. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
  96. "First Coast Guard academy to come up at Azheekkal". The Hindu. 27 February 2011. Retrieved 24 December 2017.
  97. "KIAL firm on December date for trial landing - KERALA". The Hindu. 13 October 2015. Retrieved 24 December 2017.

[1]

Media related to Kannur International Airport at Wikimedia Commons

  1. Kannur Airport A Boon For Gulf Flyers From Mysuru And Kodagu? "Star of Mysore" 12/08/2018
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.