Merritt 7 station

Merritt 7
Trackside view of station shelter
Location 1 Glover Avenue
Norwalk, CT, 06850
Coordinates 41°08′48″N 73°25′40″W / 41.1466°N 73.4278°W / 41.1466; -73.4278Coordinates: 41°08′48″N 73°25′40″W / 41.1466°N 73.4278°W / 41.1466; -73.4278
Owned by ConnDOT
Line(s)
Platforms 1 low side platform
Tracks 1
Connections Norwalk Transit District: Route 7 Link
Construction
Parking 88
Other information
Fare zone 41
History
Opened 1985[1]
Station succession
Preceding station   Metro-North Railroad   Following station
Danbury Branch
toward Danbury
  Proposed services  
Danbury Branch
toward New Milford

The Merritt 7 Metro-North Railroad station serves the residents of Norwalk, Connecticut via the Danbury Branch of the New Haven Line. Merritt 7 is named for a nearby business park based at the intersection of the Merritt Parkway and United States Route 7. The station is the only regular stop in the Metro-North system outside of the Waterbury Branch, the Pascack Valley Line, and the Port Jervis Line to have a low-level platform.

The Merritt-7 Office Complex built the station while separating the station from building entrances by a fence to make the complex transit adjacent but not transit-oriented.[2]

Merritt 7 is 45 miles (72 km) from Grand Central Terminal and the average travel time from Grand Central is 74 minutes. The station opened on July 29, 1985 by Metro-North.[1]

The station has 88 parking spaces, all owned by the state.[3]

Station Improvements

The station, as part of Let's Go CT, will have a 510-foot long high-level platform built. It will be able to platform six cars, and it will be canopied the entire way. The new station will have at least 283 parking spaces. The new station would have a pedestrian overpass and it would be ADA-accessible with elevators.[4]

Station responsibilities

Ownership Station[5]

Manager

Platform

Lights

Trash Platform

Snow

Shelter

Glaze

Platform

Canopy

Platform

Structure

Parking
ConnDOT ConnDOT ConnDOT MNR ConnDOT ConnDOT ConnDOT ConnDOT ConnDOT

Platform and track configuration

1  Danbury Branch for South Norwalk or Grand Central
 Danbury Branch for Danbury

This station has one seven-car-long low-level side platform to the west of the track. The Danbury Branch has one track at this location.

References

  1. 1 2 Charles, Eleanor (July 28, 1985). "RAIL STATION FOR CORPORATE PARK". New York Times.
  2. Connecticut Department of Transportation January 2007 Visual Inspection Report
  3. "Task 2: Technical Memorandum parking Inventory and Utilization: Final Report" submitted by Urbitran Associates Inc. to the Connecticut Department of Transportation, "Table 1: New haven Line Parking Capacity and Utilization", page 6, July 2003 Archived 2007-07-12 at the Wayback Machine.
  4. "Let's Go CT Transportation Ramp Up Dashboard". www.letsgoct.com. Connecticut Department of Transportation. Retrieved February 2, 2017.
  5. "NEW HAVEN LINE TRAIN STATION VISUAL INSPECTION" (PDF). ct.gov.

See also

Media related to Merritt 7 (Metro-North station) at Wikimedia Commons


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.