Line 8 (Guangzhou Metro)

Line 8
 8 
Platform of Xiaogang
Overview
Other name(s) M2e ("" shape plan name)
M2e / M3e (5 lines plan name)
M4 / M5 (7 lines plan name)
M8 (2000 plan name)
Pazhou line
(琶洲线)
Type Rapid transit
System Guangzhou Metro
Status Operational
Locale Haizhu District
Guangzhou, Guangdong
Termini Fenghuang Xincun
Wanshengwei
Stations 13
Services 1
Daily ridership 645,700 (2017 daily average)[1]
Operation
Opened 25 September 2010
Owner City of Guangzhou
Operator(s) Guangzhou Metro Corporation
Character Underground
Rolling stock ?? CRRC Zhuzhou Locomotive Metro cars[2]
Technical
Line length 14.8 km (9.20 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Overhead lines, 1,500 V DC
Route map

North extension
(under construction)
future extension
Baiyun Lake
Baiyun Lake Depot
Tinggang
Shijing
Shijing River
Xiaoping
Pingsha
Julong
 12 
Shangbu
Tongdewei
Ezhangtan
Zengbu River
 5  to Jiaokou │ to Wenchong
Xicun
 5 
 11 
Caihongqiao
 11  13 
 13 
Left arrow to Huanggang
to Xiangjingling Right arrow
 11 
 1 
Left arrow to Xilang
to Guangzhou East Railway Station Right arrow
Chen Clan Academy
 1 
Hualin Temple
Cultural Park
 6 
 6 
Left arrow to Xunfenggang
to Changban Right arrow
Tongfuxi
 19 
Haizhu Creek
North extension
(under construction)
Fenghuang Xincun
 Guangfo  to Xincheng Dong
Shayuan
 Guangfo  to Lijiao
Baogang Dadao
 2 
Left arrow to Guangzhou South Railway Station
to Jiahewanggang Right arrow
Changgang
 2 
connection to Line 2
Xiaogang
Sun Yat-sen University
Lujiang
 3 
Left arrow to Panyu Square
to Tianhe Coach Terminal Right arrow
Kecun
 3 
connection to Line 3
Chigang
Chigang Creek
Modiesha
Chisha Depot
Xingang East
Pazhou
 4  to Jinzhou │ to Huangcun
Wanshengwei
 4 
East extension
(planned)
East extension
(planned)
Fengpu Park
Xinzhou
Changzhou
 7 
 7 
Left arrow to Guangzhou South Railway Station
to Dashadong Right arrow
Guangzhou International Commodity
Exhibition & Trade Centre
Hualong
GAC Complex
Line 8
Simplified Chinese 广州地铁8号线
Traditional Chinese 廣州地鐵8號線
Cantonese Yale Gwóngjāu Deihtit Baat Houh Sin

Line 8 of the Guangzhou Metro is a north-west L-shaped line on the system that runs from Fenghuang Xincun to Wanshengwei, spanning a total of 14.8 km (9.2 mi) with 13 stations. It interchanges with Line 2 at Changgang, Line 3 at Kecun and Line 4 at Wanshengwei. All stations on Line 8 are underground.[3] Line 8's color is teal.

Line 8 used to run as part of Line 2 until the extension to both lines opened for trial operation on 25 September 2010, and Changgang to Fenghuang Xincun started operation on 3 November 2010.[4][5]

History

Line 8 drawn to scale.
The former alignment of Line 2 before the creation of Line 8 drawn to scale.
  • 2004 - The Line 2 and 8 realignment project; and Line 8 Cultural Park to Xiaogang extension was announced. Creating Line 8 by splitting off the southeastern portion (Xiaogang to Wanshengwei) from Line 2.
  • June 2007 - Line 2 and 8 realignment; and Line 8 phase 1 (Cultural Park to Xiaogang extension) was approved by the NDRC.
  • 1 August 2007 - Construction of Line 2 and 8 realignment project; and Line 8 phase 1 extension officially commenced.
  • 10 March 2010 - Line 8 phase 2 (northern extension) was announced by extend Line 8 from Liwan to Baiyun.
  • 21 September 2010 - Line 2's services of train bound between Sanyuanli to Wanshengwei ends.
  • 25 September 2010 - Line 2 and 8 realignment project; and Line 8 phase 1 extension first section was completed and enter operation.
  • 3 November 2010 - Line 2 and 8 realignment project; and Line 8 phase 1 extension second section enter operation.
  • 9 July 2014 - Line 8 phase 3 (further north extension) was announced by further extend Line 8 from Baiyun to Huadu.
SegmentCommencementLengthStation(s)Name
Xiaogang — Wanshengwei 25 September 2010 10.8 km (6.71 mi) 9 Line 2 & 8 realignment project (initial section)
Changgang — Xiaogang 25 September 2010 0.6 km (0.37 mi) 1
Fenghuang Xincun — Changgang 3 November 2010 4.4 km (2.73 mi) 3 Line 2 & 8 realignment project (2nd section)

Stations

Station
no.
Station name Connections Distance
km
Location
English Chinese
8 16 Fenghuang Xincun 凤凰新村 0.00 0.00 Haizhu
8 17 Shayuan 沙园  Guangfo  0.90 0.90
8 18 Baogang Dadao 宝岗大道 1.20 2.10
8 19 Changgang 昌岗  2  0.94 3.04
8 20 Xiaogang 晓港 0.61 3.65
8 21 Sun Yat-sen University 中大 1.00 4.65
8 22 Lujiang 鹭江 1.89 6.54
8 23 Kecun 客村  3  1.26 7.80
8 24 Chigang 赤岗 1.46 9.26
8 25 Modiesha 磨碟沙 0.70 9.96
8 26 Xingangdong 新港东 1.61 11.57
8 27 Pazhou 琶洲 1.05 12.62
8 28 Wanshengwei 万胜围  4  Guangzhou Trams  THZ1  1.95 14.57

Northern extension

A northern extension to Baiyun Lake is currently under construction with opening scheduled in 2019.[6]

Station
no.
Station name Connections Distance
km
Location
English Chinese
8 01 Jiaoxin 滘心 0.00 0.00 Baiyun
8 02 Tinggang 亭岗 1.68 1.68
8 03 Shijing 石井 1.77 3.45
8 04 Xiaoping 小坪 1.91 5.36
8 05 Shitan 石潭 1.44 6.80
8 06 Julong 聚龙 0.88 7.68
8 07 Shangbu 上步 1.11 8.79
8 08 Tongde 同德 0.84 9.63
8 09 E'zhangtan 鹅掌坦 0.72 10.35
8 10 Xicun 西村  5  1.91 12.26 Liwan
8 11 Caihongqiao 彩虹桥  11  0.87 13.13
8 12 Chen Clan Academy 陈家祠  1  0.88 14.01
8 13 Hualin Temple 华林寺 1.05 15.06
8 14 Cultural Park 文化公园  6  0.90 15.96
8 15 Tongfuxi 同福西 0.97 16.93 Haizhu

Further North Extension

Approved and under preparation for construction with an implementation period of 2019 to 2023.[7] In the future, the further north extension phase will be divided into two lines at Jiangfu Station. With the northern section of Line 8 between Jiangfu Station and Guangzhou North Railway Station will be split off to form a new line.[8]

Station name Connections Location
English Chinese
Guangzhou North Railway Station 广州北站  9  Huadu
Yayao 雅瑶
Jinghu Dadao 镜湖大道
Shenshan 神山 Baiyun
Shuili 水沥
Jiangfu 江府
Jiangcun 江村
Jianggao 江高
Fengxiang Lu 凤翔路

References

  1. http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf
  2. https://rail.kychung.com/en/2d-en/guangzhou-metro-line-8-stock/
  3. "Guangzhou Metro". Railway-Technology.com. Retrieved 14 March 2017.
  4. 404 Not Found Archived 2010-09-21 at the Wayback Machine.
  5. 广州地铁. Gzmtr.com. 16 September 2010. Archived from the original on 28 February 2012. Retrieved 12 July 2013.
  6. 一棵树 一幢屋“拖”住八号线北延 - 南方都市报 - 汉丰网. www.kaixian.tv. Retrieved 2018-01-27.
  7. "今明两年共7条地铁新线动工 快看看有没有经过你家!". cj.sina.com.cn. Retrieved 2018-01-27.
  8. "广州8号线北延段拟分为两条线 江府站以南为8号线_房产广州站_腾讯网". gz.house.qq.com (in Chinese). Retrieved 2018-01-27.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.