Shore Line East

Shore Line East (SLE) is a commuter rail service which operates along the Northeast Corridor through southern Connecticut, US. The rail service is a fully owned subsidiary of the Connecticut Department of Transportation (ConnDOT), and is operated under the CTrail brand. SLE provides service seven days a week along the Northeast Corridor from New London west to New Haven, with limited through service further west to Bridgeport and Stamford. Connecting service west of New Haven to New York City is available via Metro-North Railroad's New Haven Line.

Shore Line East
Shore Line East train at New Haven Union Station in 2018
Overview
TypeCommuter rail
LocaleSouthern Connecticut
TerminiStamford (limited weekday service)
New Haven Union Station
Old Saybrook
New London
Stations15
Daily ridership2,100 (Q2 2018)[1]
Websiteshorelineeast.com
Operation
OpenedMay 29, 1990
OwnerAmtrak (east of Shoreline Junction)
ConnDOT (west of Shoreline Junction)
Operator(s)Amtrak (under contract to ConnDOT)
Rolling stockP40DC and GP40-3H locomotives
Mafersa coaches
Technical
Line length90.0 miles (144.8 km)
Track gauge4 ft 8 12 in (1,435 mm) standard gauge
Electrification25 kV 60 Hz AC (currently unused)
Route map

122.9 mi
197.8 km
New London
Niantic River Bridge
Niantic (proposed)
Connecticut River Bridge
105.1 mi
169.1 km
Old Saybrook
101.2 mi
162.9 km
Westbrook
96.8 mi
155.8 km
Clinton
93.1 mi
149.8 km
Madison
88.8 mi
142.9 km
Guilford
81.4 mi
131 km
Branford
Hartford Line to Springfield
72.7 mi
117 km
New Haven State Street
72.3 mi
116.4 km
New Haven Union Station
69.4 mi
111.7 km
West Haven
63.3 mi
101.9 km
Milford
59.0 mi
95 km
Stratford
55.4 mi
89.2 km
Bridgeport
New Haven intermediate stops
43.1 mi
69.4 km
South Norwalk
New Haven intermediate stops
33.1 mi
53.3 km
Stamford
New Haven (NEC) to Grand Central
Distance shown from Grand Central

The service was introduced in 1990 as a temporary measure to reduce congestion during construction work on I-95. However, it proved more popular than expected, and service was continued after construction ended despite criticisms that the line was too expensive to operate. The service has been continually upgraded since its inception with rebuilt stations and new rolling stock as well as extensions to New London in 1996 and to Stamford in 2001. Around 2,100 riders use the service on weekdays.[1]

Current service

Most weekday SLE trains run local westbound from New London or Old Saybrook to New Haven in the morning, with some nonstop eastbound service. This traffic pattern is reversed in the afternoon and evening rush. A handful operate through New Haven as far as Stamford.[2]

A Shore Line East train at Union Station in New Haven, the focal point of the line, with former Amtrak P40DC No. 841 leading

Most weekend SLE trains also run local westbound in the morning, then express in the afternoon, stopping only at Branford, Guilford, and Westbrook between Old Saybrook and State Street. Eastbound service is reversed.[3] This is because Madison and Clinton only have platforms on the eastbound track, and thus switching is needed to platform a westbound train.[4]

About half of SLE trains operate to and from New London. New London SLE multi-ride pass holders are also allowed to board selected Northeast Regional trains, or Acela Express train #2151. There are plans to increase the service to New London, which is limited by U.S. Coast Guard requirements regarding the bridge crossing the Connecticut River. After years with just one or two trains to New London, additional New London round trips were added in 2010 and 2013, and weekend service began in June 2013.[5][6][7]

All trains that do not operate west of New Haven make a connection to a Metro-North Railroad train at New Haven, for service to and from points in Connecticut, Westchester County, New York, and New York City.[3] These connections are commonly used by extreme commuters who live in suburban Connecticut and work in New York City.[8]

Although SLE service is funded by ConnDOT, it is operated under contract by Amtrak. Amtrak owns and controls the Northeast Corridor east of New Haven. West of New Haven, the New Haven Line is owned by ConnDOT and trains are dispatched by Metro-North.[9][4]

During the OpSail and SailFest tall ship festivals at New London, extra Friday and weekend service is operated from New Haven to New London.[10][11] During OpSail 2000, through service operated from New Haven to Mystic – the only time Shore Line East service has run east of New London.[12]

Service history

Previous service

A Shore Line East train with equipment painted in New York, New Haven and Hartford Railroad colors

The section of the Northeast Corridor that Shore Line East operates on was once the New York-Boston mainline of the New York, New Haven and Hartford Railroad. The section from New Haven to New London was built as the New Haven & New London Railroad. It was charted in 1848, began construction in 1850, and opened for service in July 1852.[13] The line was owned by the New York, Providence and Boston Railroad (the "Stonington Road") from 1858 to 1862, and by the Shore Line Railway from 1864 until it was acquired by the New York, New Haven, and Hartford Railroad (the "New Haven") in 1870. Crossing the Connecticut River required a ferry transfer until a drawbridge was built in 1870.[13]

The line was referred to by the New Haven Railroad as the Shore Line, to distinguish it from the railroad's Main Line from New Haven to Springfield, Massachusetts. In recognition of the large role played by the New Haven in the history and heritage of the state of Connecticut, ConnDOT paints SLE's diesel-powered locomotives in the New Haven's orange and black style. New Haven Railroad colors and emblems have also been placed at several stations, particularly New Haven Union Station.[14]

Clamdigger service as run by Amtrak in 1971

The New Haven Railroad operated local service on the Shore Line up until its merger with Penn Central on January 1, 1969, when most commuter service east of New Haven was abandoned. Intercity service continued, but generally only stopped at New Haven, Old Saybrook, and New London.[15] Penn Central continued to operate the Clamdigger, a single daily New London-New Haven round trip with local stops, as well as a New London-Boston round trip. Amtrak took over the Clamdigger along with most intercity passenger service, in May 1971.[16] In January 1972, Amtrak discontinued the Clamdigger and Penn Central cut the New London-Boston trip.[17]

In 1976 and 1977, Amtrak operated the Clamdigger as a Providence-New Haven round trip with limited local stops; for three months in 1978, it was revived with additional commuter-based stops. It was replaced in April 1978 by the Beacon Hill, which stopped at New Haven, Branford, Madison, Old Saybrook, Niantic, New London, and Mystic en route to Providence and Boston. The Beacon Hill (which served the Providence and Boston commuting markets rather than New Haven) was discontinued in 1981 due to funding cuts, ending commuter rail service in Connecticut east of New Haven.[18]

Initial service

The PATrain at Pittsburgh in 1985. After that service ended in 1989, ConnDOT purchased the equipment for use on Shore Line East.

In 1981 and 1986, legislation was proposed to restore commuter service between New Haven and New London, as well as between New Haven and Hartford. A 1986 ConnDOT study analyzed congestion on Interstate 95, which runs parallel to the line. The study showed that Old Saybrook was a better terminus for initial service, with an expected ridership of 420 riders in each direction daily.[19]

Based on the study, Governor William O'Neill ordered ConnDOT in October 1986 to initiate rail service on the corridor. It was established as a temporary service to newly reopened local stations between Union Station in New Haven and Old Saybrook, to alleviate traffic congestion that arose from scheduled construction work on I-95. O'Neill introduced a $50 million transportation program that included $900,000 (later reduced to $500,000) for basic stations and $4 million to refurbish 12 Budd Rail Diesel Cars for rolling stock. The RDCs were found to be insufficient and two diesel trainsets were purchased from the defunct PATrain service in 1989 instead.[19] Testing of the equipment on the Northeast Corridor began on December 2, 1989.[20]

A second study in 1989 indicated higher potential ridership of 700 to 1350 daily riders. The state bought Amtrak's New Haven maintenance facility in May 1989 and signed a service contract with Amtrak in November. (Metro-North Railroad was not considered for several reasons, largely because Amtrak already owned the rail line east of New Haven). Construction of 5 intermediate stations was completed in April 1990.[19]

Shore Line East service began on May 29, 1990, with four trains each direction during the morning and evening. The service carried the Clamdigger name during planning; "Shore Line East" did not appear until shortly before service began. Shore Line East was threatened to be cut in 1991 by newly elected Governor Lowell Weicker, but it proved more popular than expected, and was effectively made permanent. A 1996 study found that Shore Line East captured 8% of regional commuter trips and attracted a loyal ridership base.[19]

In 1995 and 1997, then Gov. John Rowland proposed to replace Shore Line East and the Waterbury Branch with bus service, citing a high subsidy of $18.70 per rider per trip, in order to decrease the unpopular gas tax.[21] Lawmakers from the region called the proposals political and defended the line's ability to reduce congestion and pollution, while opponents of the line called it an example of government waste.[22] The Shore Line East Rider's Association and other groups lobbied to save both services each time, and after public hearings a small fare increase was enacted in late 1997 instead.[23]

Early expansions and criticisms

Shore Line East was extended to New London Union Station in 1996.

In July 1995, Governor Rowland signed a bill ordering various studies, including one that analyzed extending service to New London as had been originally planned.[24] Before the study was completed, ConnDOT unilaterally decided to implement New London service, which the report commended.[19] On February 1, 1996, two round trips per weekday were extended to New London.[25] At that point, ridership was up 18% over 1991 numbers.[26]

A rush-hour Shore Line East train at Stamford in 2007.

In January 2001, because of changes in Amtrak rules, passengers were no longer allowed to cross tracks to access trains. New platforms were opened on the south side of the tracks at Branford and Westbrook at approximately the same locations.[27]

In December 2001, a single morning rush-hour round trip branded SLExpress was extended to Stamford, with a stop at Bridgeport plus eastbound-only stops at Stratford and Milford. An evening eastbound trip was also extended to Stamford with only the Bridgeport intermediate stop.[28] This trip was intended to allow commuters to reach employment centers in Bridgeport and Stamford without having to make a transfer at New Haven. On June 24, 2002, additional Stamford trains were added, for a total of two westbound and three eastbound trains.[29] When West Haven opened on August 18, 2013, it was added to these trips as well.[2]

In 2003, in order to add four additional Amtrak trips along the corridor, four of the then six round trips to New London were cut back to Old Saybrook. An agreement with the Connecticut Department of Environmental Protection limits service over the Old Saybrook-Old Lyme bridge in order to avoid inconveniencing recreational boaters. ConnDOT's agreement with Amtrak allowed commuters with monthly passes to ride certain Amtrak trains instead.[30] After criticism over the service cuts, in April 2008 ConnDOT began allowing commuters with multi-ride passes to board the selected Amtrak trains as well.[31]

Improved and increased service

State Street Station in New Haven opened in 2002 near the city's downtown district.

When started in 1990, Shore Line East was intended to be a temporary service. Except at Old Saybrook and New Haven, which were already served by Amtrak, the state constructed new stations – consisting of little more than bare wooden decks – for minimal cost. Since the service was started two months before the Americans with Disabilities Act was signed, the platforms were not built to be handicapped accessible. After a decade of service, with Shore Line East established as part of Connecticut's transportation system, the state began to upgrade the service. The basic stations have been rebuilt with high-level platforms to provide handicapped access and level boarding, parking lots have been expanded, and more trains have been added to the schedule.

A completely new station was also added to the line for traffic mitigation as part of the reconstruction of the Pearl Harbor Memorial Bridge. On June 7, 2002, State Street station was opened in New Haven to provide better access to the downtown area than Union Station, which is half a mile away from the business district.[32]

The first station to be rebuilt was Old Saybrook, the busy eastern terminus of the line. The new high-level island platform and pedestrian bridge opened on November 1, 2002.[33] Old Saybrook had previous had only a single side platform serving a relatively small number of Amtrak trains; the rebuilt has two platforms serving three tracks, to allow Amtrak trains in both directions to stop or pass even while a SLE train is at the station.

Guilford station was rebuilt in 2004–05 with new high-level platforms connected by an overhead walkway. The westbound platform was extended in 2015.

Beginning on May 24, 2004, construction of new platforms began at Clinton, Guilford, and Branford.[34] The rebuilt Clinton station opened on July 25, 2005, and the rebuilt Branford station opened on August 8, 2005; both consist of a single high-level platform on the south side of the tracks.[35] The new Guilford station, which has platforms on both sides of the tracks (connected by a pedestrian bridge) to allow for greater operational flexibility, opened on November 28, 2005.[36] Construction at Madison started on September 24, 2007, and finished with the opening of the rebuilt station platform on July 28, 2008.[37]

On October 8, 2007, reverse-peak and more midday service were introduced, which officials hailed as the beginning of Shore Line East as a true bidirectional system. Several existing express trains also began to stop at Guilford.[38] Since at least 2006, advocates had been calling for the establishment of weekend Shore Line East service.[39] A pilot of weekend service was run from November 17, 2007, to December 30, 2007, with six "Shopper's Special" round trips from Old Saybrook to New Haven. The trains were scheduled to connect with similar Metro-North specials at New Haven.[40] Year-round weekend service began on July 4, 2008, with 9 daily Old Saybrook – New Haven round trips on weekends. No weekend service was run to New London, but weekday service was increased as cross-honoring of multiple-ride and monthly tickets was added on two Amtrak trains.[41]

A weekend Shore Line East train arrives at New London in June 2013
Conflicts over closings of the Old Saybrook – Old Lyme bridge are the primary obstacle to full service to New London and further eastward expansion.

The major obstacle preventing full New London service is the bridge over the Connecticut River between Old Saybrook and Old Lyme. The drawbridge section is closed for a certain period of time to allow trains to pass, which prevents large boats from passing under. The Marine Trades Association opposes additional service, which would mandate more bridge closings. The 2003 agreement with Amtrak limited weekday traffic over the bridge to 2 SLE and 39 Amtrak trains until 2018, although it was revised in 2010 and 2013.[4] Since 2003, New London had been served by cross-honored Amtrak trains plus one or two dedicated SLE roundtrips.

On February 16, 2010, an additional round trip was extended to New London.[6] Three more were extended on May 10, 2010.[7] However, advocates for full service to New London said that Governor Rell failed to deliver on promises to New London, with one newspaper columnist writing that "she seems incapable of standing up to the marine trades lobby" regarding the bridge openings.[42]

In July 2012, Governor Malloy announced that 5 weekend round trips would be extended to New London beginning in April 2013. However, the extension was dependent on ongoing negotiations with the marine industry over mandated closings of the Old Saybrook – Old Lyme bridge.[43] Two weekday midday trips were added in May 2013, while weekend service began on June 1, 2013, after the application for additional bridge closings was approved by the state Department of Energy and Environmental Protection.[44] By July, New London represented 26% of weekend ridership.[45] In December 2013, the state announced that ridership was up 35% for the year as a result of the increased service.[46] From 2009 to 2014, monthly New London ridership increased from less than 1,000 monthly passengers to approximately 5,000, accounting for a significant fraction of ridership increases on Shore Line East during that period.[47]

Four of the five intermediate stations between Old Saybrook and New Haven were rebuilt with accessible platforms between 2004 and 2008, but rebuilding at Westbrook was delayed due to environmental and cost issues.[48] No site was available until Westbrook and ConnDOT traded the new station site on Norris Avenue for a highway garage site off Route 145. The controversial land swap was begun in 2004 but was not finalized until 2006, and town operations were not moved to the Route 145 site until September 2011.[49] Site clearing began in November 2011, and ground was broken for the $14.4 million station in January 2012.[48][49] A new station with a larger 210-space lot and platforms on both tracks opened on March 25, 2014, with full bidirectional service to the station beginning on May 11.[50][51]

In 2018, two separate issues caused numerous delays and cancellations with many trains replaced by buses. An Amtrak track maintenance project required single-tracking of sections of the line, and ConnDOT lacked sufficient functional locomotives as the aging fleet was sent out for refurbishment.[52] Three weekday round trips were reverted from bus to train in January 2019 when one locomotive returned from refurbishment, though additional issues were expected during a second summer of track work in 2019.[53] Full service was restored on August 5, 2019. By that time, ridership had fallen by 25%, averaging 1,340 weekday riders and 767 weekend riders.[54]

Future

A second platform (left) was completed at Branford station in late 2016.
M8 railcars (shown here) are planned to be used in Shore Line East service.

In a 2007 report, ConnDOT outlined plans to turn SLE into a full-service bidirectional regional rail line, with full-day service and all trains extended to New London.[4] This involves incremental improvements, similar to those that have already been put into place. One of the first priorities is to add a second platform at all stations, which is mandated by the 2003 agreement with Amtrak.[4] New London, Old Saybrook, Guilford, Westbrook, Branford, and stops from New Haven Union Station west all have multiple platforms, while State Street has an island platform serving two tracks and a side platform.

Branford is the first previously rebuilt station to be further renovated with a second platform. A $60 million bond in February 2011 included $16.5 million for a second platform and pedestrian bridge at Branford, $7.3 million for platform extensions at Guilford, and $11 million to add catenary wires to currently unwired sidings along the line. Construction on the new platform at Branford began in September 2013, and the Guilford work is under way as well.[55][56] After delays, the enlarged Branford station opened on September 30, 2016, although the north platform was not immediately served by trains.[57] Bidding on a second platform and three-level parking garage at Madison, planned since 2009, was scheduled to begin in 2013 but did not occur.[37][58] Per the agreement with Amtrak, a second platform is planned to be added to Clinton station. The project was originally planned to start in early 2012, but has since been indefinitely delayed.[59][60] In October 2017, ConnDOT announced plans to expand the current Clinton station. Construction was set to begin in March 2018 and be completed by December 2019.[61] It has once again been postponed along with the Madison Station until new funding is identified.[62]

Expansion of the original parking facilities is also necessary to meet demand at many stations, since many started with small lots suitable for just a few dozen cars. The rebuilt stations at Branford, Guilford, Madison, Clinton, and Westbrook have larger lots than the 1990 stations, and a second lot with 272 spaces opened at Branford in June 2011.[63] A 585-space, three-level parking garage is eventually planned for Madison station.[37]

Although the route east of New Haven is electrified under Amtrak's 60 Hz traction power system, Shore Line East currently operates entirely with diesel locomotives. Once the full order of M8 railcars are in service, and Amtrak tests and approves the M8s for usage east of New Haven, ConnDOT plans to use 24 to 32 cars for electric SLE service to reduce diesel emissions. The diesel trainsets will be moved to service on the Danbury or Waterbury branches, or to the Hartford Line from New Haven to Springfield.[4][64]

Westerly station is a possible future eastbound terminus of Shore Line East service.

In April 2012, state officials released a report detailing possible sites for an infill station in East Lyme. Four sites were analyzed – two near downtown Niantic and two at Rocky Neck State Park.[65] Niantic had previously been a stop on the Clamdigger. As part of a bonding proposal made by Governor Malloy, $750,000 would be allocated for a new station at Niantic.[66] A study will be undertaken to analyze the corridor capacity impacts that the station would bring.[67]

The possibility of extending service eastward has also been considered. Several special trains operated to Mystic during the 2000 OpSail festival, the only such service to date.[10] In a 2001 report examining commuter rail for Rhode Island, the Rhode Island Department of Transportation (RIDOT) considered an extension of Shore Line East to Providence via Westerly (effectively restoring the Clamdigger service).[68] Ultimately, MBTA Commuter Rail service, which already ran to Providence as part of the Providence/Stoughton Line, was extended southward instead (although only to Wickford Junction). However, both RIDOT and SLE have long-term plans to extend their services to meet at Westerly. Extending SLE service would require negotiations with the US Coast Guard, the Marine Trades Association, and other stakeholders for increased use of the Thames River Bridge and the Mystic River Bridge.[4] As part of Governor Malloy's thirty year transit plan, Shore Line East would be extended to Westerly at a cost of $200 million.[66] On February 1, 2016, the Connecticut Public Transportation Commission issued a report recommending extension of Shore Line East rail service to Mystic and Westerly as soon as possible.[69][70]

Rolling stock

A typical Shore Line East train with a P40DC and three Mafersa coaches at Old Saybrook

In contrast to the electric multiple units used on Metro-North's New Haven Line, which are also purchased in part by the state of Connecticut, all SLE trains are diesel push-pull trains.[71]

SLE runs diesel service because Amtrak had not yet electrified the Northeast Corridor between New Haven and Boston at the time service began. The original SLE service operated with 2 F-7s and 10 Pullman-Standard coaches purchased from Pittsburgh's PATrain for $1.7 million.[72][19]

In 1991, ConnDOT purchased 10 Bombardier Shoreliner III coaches, similar to ones already used on the Danbury Branch and Waterbury Branch, and leased three additional diesel locomotives: two EMD GP38s and one EMD GP9.[73] In 1994 Amtrak rebuilt 11 of ConnDOT's surplus SPV-2000 diesel railcars into coaches, dubbed "Constitution Liners."[74]:89[25] In 1996, SLE took delivery of six remanufactured GP40-2H diesels to replace the entire motive power fleet.[75][25] These were supplemented in 2005 with 8 GE P40DC Genesis diesels leased from Amtrak.[76] ConnDOT purchased the P40DCs in 2008.[74]:55 To augment capacity ConnDOT acquired 33 Mafersa coaches from the Virginia Railway Express in 2004. These began entering service in 2006, displacing the Shoreliners and Constitution Liners.[77].

ConnDOT acquired an additional four GE P40DC locomotives from New Jersey Transit in 2015. Originally built for Amtrak, NJ Transit employed the locomotives on the short-lived Atlantic City Express Service.[76] In January 2018, ConnDOT awarded a contract to Amtrak to overhaul all 12 P40DC locomotives at the Beech Grove Shops.[78] The GP40-2H locomotives were sent to NRE for rebuilding in 2017 and 2018, followed by use on the new Hartford Line service.[79]

ConnDOT plans call for the Kawasaki M8 to replace most or all of the locomotives and coaches currently in service on Shore Line East in 2018. ConnDOT has proposed to use up to 32 M8's in SLE service as far as Old Saybrook; the step-fitted diesel equipment will then be used on the Hartford Line and for New London / Mystic / Westerly service.[4] Limited direct service from Grand Central Terminal to Old Saybrook may be added once the M8s are in service.[80] Testing of M8 cars on the Shore Line East route began in February 2017.[81]

Roster

Builder Model Photo Active Road numbers Year built Year acquired Notes
Locomotives
GE P40DC 12 833–834, 836, 838, 840–843, 4800–4803 1993 2005, 2015 All are ex-Amtrak units. Units 833–843 were acquired directly in 2005; 4800–4803 were owned by NJT prior to ConnDOT.
EMD GP40-3H 6 6694-6699 1971[82] 1996[82] Rebuilt in 2018. Normally used for Hartford Line service, but occasionally used for Shore Line East service as well.
Coaches
Mafersa Coaches 33 1701–1774 1991–1992 2004 Ex-Virginia Railway Express.

Stations

All stations are accessible. Limited service is available west of New Haven and east of Old Saybrook.

Old Saybrook, which was renovated in 2002, is the eastbound terminus for most SLE trains.
The new Madison station opened in 2008.
Location Station Miles (km)
from GCT
Service began Connections / notes
Stamford Stamford Transportation Center 33.1 (53.3) December 17, 2001[28] Amtrak: Northeast Regional, Acela Express, Vermonter
Metro-North Railroad: New Haven Line, New Canaan Branch
Two round trips per weekday
Norwalk South Norwalk 43.1 (69.4) June 24, 2002[29] Metro-North Railroad: New Haven Line
1 eastbound train per weekday
Bridgeport Bridgeport 55.4 (89.2) December 17, 2001[28] Amtrak: Northeast Regional, Vermonter
Metro-North Railroad: New Haven Line, Waterbury Branch
Two round trips per weekday
Stratford Stratford 59.0 (95.0) December 17, 2001[28] Metro-North Railroad: New Haven Line
2 eastbound trains per weekday
Milford Milford 63.3 (101.9) December 17, 2001[28] Metro-North Railroad: New Haven Line
2 eastbound trains per weekday
West Haven West Haven 69.4 (111.7) August 18, 2013[83] Metro-North Railroad: New Haven Line
2 eastbound trains per weekday
New Haven Union Station 72.3 (116.4) May 29, 1990 Amtrak: Northeast Regional, Acela Express, Vermonter, Hartford Line
Metro-North Railroad: New Haven Line
CTrail: Hartford Line
Terminus for most trains
State Street 72.7 (117.0) June 7, 2002[32] Amtrak: Northeast Regional, Hartford Line
Metro-North Railroad: New Haven Line
CTrail: Hartford Line
Branford Branford 81.4 (131.0) May 29, 1990 Rebuilt station opened on August 8, 2005
Guilford Guilford 88.8 (142.9) May 29, 1990 Rebuilt station opened on November 28, 2005
Madison Madison 93.1 (149.8) May 29, 1990 Rebuilt station opened on July 28, 2008
Clinton Clinton 96.8 (155.8) May 29, 1990 Rebuilt station opened on July 25, 2005
Westbrook Westbrook 101.2 (162.9) May 29, 1990 Rebuilt station opened on March 25, 2014
Old Saybrook Old Saybrook 105.1 (169.1) May 29, 1990 Amtrak: Northeast Regional
Eastern terminus for most trains
New London New London 122.9 (197.8) February 1, 1996[26] Amtrak: Northeast Regional, Acela Express
Limited service

See also

  • New Haven Line
  • Hartford Line
  • Connecticut Rail Commuter Council

References

  1. "Transit Ridership Report: Second Quarter 2018" (PDF). American Public Transportation Association. August 24, 2018.
  2. "Strong Ridership Growth for Expanded Shore Line East New London Train Service" (Press release). Connecticut Department of Transportation. September 4, 2013.
  3. "Schedules". Connecticut Department of Transportation. Retrieved July 13, 2016.
  4. "Expanding Rail Service" (PDF). Connecticut Department of Transportation. January 1, 2007. Retrieved August 8, 2012.
  5. Cox, Jeremiah. "New London". The Subway Nut. Retrieved March 3, 2016.
  6. "Rell: NL to get second daily commuter train". The Day. February 4, 2010. Retrieved February 12, 2010.
  7. "ALL aboard the Shore Line East!". The Day. February 4, 2010. Retrieved May 9, 2010.
  8. Miller, Bryan (July 21, 2017). "Extreme Commuting". New York Times.
  9. The NEC Master Plan Working Group (May 2010). "The Northeast Corridor Infrastructure Master Plan" (PDF). Amtrak. p. 5.
  10. "OpSail 2012 Schedule" (PDF). Connecticut Department of Transportation. Archived from the original (PDF) on July 10, 2012. Retrieved June 22, 2012.
  11. "TAKE THE RAILS TO THE SAILS!". Connecticut Department of Transportation. Retrieved July 2, 2016.
  12. McKay, Molly (July 30, 2000). "OpSail proved that if you run trains, people will use them". The Day. p. D4.
  13. Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 94–96. ISBN 0942147022.
  14. Kadden, Jack (December 7, 2003). "COMMUTER'S JOURNAL; A Bit of New Haven Line Is Resurrected". New York Times.
  15. "New Haven Sold to Penn Central – $145.6 Million Paid In Action Forced by Government". New York Times. January 1, 1969. Retrieved January 31, 2016.
  16. National Railroad Passenger Corporation (Amtrak) (May 1, 1971). "Nationwide Schedules of Intercity Passenger Service". The Museum of Railway Timetables. p. 6. Retrieved October 11, 2012.
  17. Baer, Christopher T. (June 2005). "PRR CHRONOLOGY: 1972" (PDF). Pennsylvania Technical and Historical Society. Archived from the original (PDF) on August 25, 2012.
  18. "AMTRAK ALTERS ROUTES, CUTS SERVICE TO MEET BUDGET". New York Times. August 27, 1981. Retrieved January 31, 2016.
  19. "Final Report of the Task Force on Rail Service". Connecticut General Assembly Office of Legislative Research. February 1996. Retrieved June 18, 2013.
  20. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1980-1989" (PDF). Pennsylvania Railroad Technical & Historical Society.
  21. Nixon, Amy Ash (March 31, 1997). "End Of The Line?". Hartford Courant. Retrieved August 5, 2012.
  22. Daly, Matthew (March 11, 1995). "Shoreline Lawmakers Question Railroad Cut". Hartford Courant. Retrieved August 5, 2012.
  23. Dee, Jane E. (November 11, 1997). "Train Riders Facing Fare Hike". Hartford Courtant. Retrieved August 5, 2012.
  24. Public Safety Committee (July 6, 1995). "AN ACT CONCERNING LEGISLATIVE TASK FORCES AND STATE AGENCY STUDIES". Connecticut General Assembly. Retrieved June 19, 2013.
  25. "Shore Line East". Trains. July 5, 2006. Retrieved May 26, 2014.
  26. "Rail Line Extended to New London". Hartford Courant. February 2, 1996. Retrieved August 5, 2012.
  27. "Station Info". Rideworks Review. January 8, 2001. Archived from the original on March 3, 2001. Retrieved August 5, 2012.
  28. "What's New". Rideworks Review. December 17, 2001. Archived from the original on December 31, 2001. Retrieved August 5, 2012.
  29. "What's New". Connecticut Department of Transportation. October 28, 2002. Archived from the original on November 20, 2002. Retrieved August 5, 2012.
  30. "Where Commuters Come Last". New York Times. December 30, 2007. Retrieved August 5, 2012.
  31. "ATTENTION OLD SAYBROOK AND NEW LONDON CUSTOMERS: Select Amtrak Trains Cross-Honor Shore Line East Multi-Ride Tickets" (Press release). Connecticut Department of Transportation. April 14, 2008. Archived from the original on April 16, 2008.
  32. "New State Street Railroad Station Opens In Downtown New Haven". Rideworks Review. Summer 2002. Archived from the original on March 26, 2004. Retrieved August 5, 2012.
  33. Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. p. 81. ISBN 9780942147087.
  34. "Work on several Shore Line East stations scheduled to begin May 24th" (PDF). Rideworks Review. May 17, 2004. Archived from the original (PDF) on February 27, 2005. Retrieved August 5, 2012.
  35. "What's New". Connecticut Department of Transportation. August 8, 2005. Archived from the original on August 17, 2005.
  36. "Guilford Train Station Opens November 28th to Shore Line East Commuters". Connecticut Department of Transportation. Retrieved August 5, 2012.
  37. "Record of Decision: Madison Shore Line East Railroad Station" (PDF). Connecticut Department of Transportation. March 2009. Retrieved August 5, 2012.
  38. Libow, Gary (October 3, 2007). "Shore Line East Adds Midday Trains, Times". Hartford Courant. Retrieved August 8, 2012.
  39. "Why Not Weekend Trains?". Hartford Courant. September 3, 2006. Retrieved August 8, 2012.
  40. "New Holiday Weekend Rail Service to Start on Shore Line East". Connecticut Department of Transportation. November 8, 2007. Retrieved August 8, 2012.
  41. "Governor Rell Announces Weekend Shore Line East Rail Service Starting on 4th of July". Connecticut Department of Transportation. June 27, 2008. Retrieved August 8, 2012.
  42. Collins, David (February 17, 2010). "Shore Line East expansion slips off the rails". The New London Day. Retrieved August 8, 2012.
  43. "Shore Line East Steaming Into New London". Hartford Courant. July 6, 2012. Retrieved August 8, 2012.
  44. Smith, Greg (May 17, 2013). "Shore Line East expands train service". The Day. Retrieved May 20, 2013.
  45. "Strong Ridership Growth for Expanded Shore Line East New London Train Service" (Press release). Connecticut Department of Transportation. September 4, 2013. Retrieved November 24, 2013.
  46. Howard, Lee (December 13, 2013). "Shore Line East ridership up 35 percent this year". The New London Day. Retrieved December 16, 2013.
  47. Stacom, Don (November 17, 2014). "Shore Line East Trains Are Attracting More Riders". Hartford Courant. Retrieved November 18, 2014.
  48. Sipe, Corey (January 26, 2012). "Westbrook Train Station Breaks Ground After Lengthy Delays". Montville Patch. Retrieved August 8, 2012.
  49. Coffey, Becky (June 25, 2012). "New Westbrook Train Station Is Rolling Along". The New London Day. Retrieved August 8, 2012.
  50. "Ribbon Cut for Westbrook Train Station" (Press release). Connecticut Department of Transportation. March 25, 2014. Retrieved March 29, 2014.
  51. "Shore Line East Train Schedules" (PDF). Connecticut Department of Transportation. May 11, 2014. Archived from the original (PDF) on May 14, 2014. Retrieved May 14, 2014.
  52. Stannard, Ed (November 18, 2018). "Shore Line East rail riders growing weary of taking the bus". New Haven Register.
  53. Stannard, Ed (January 16, 2019). "6 Shore Line East trips returning to trains from buses next week". New Haven Register.
  54. Werth, Julia (July 31, 2019). "Shore Line East Resumes Regular Service, with 25% Fewer Riders". Connecticut Examiner.
  55. Mazzacane, Stephen M. (September 9, 2013). "Work Begins on Branford Train Station Improvements". Branford Seven. Retrieved September 18, 2013.
  56. "Minutes of February 6, 2014" (PDF). Connecticut Public Transportation Commission. February 6, 2014. Retrieved May 15, 2014.
  57. Bahner, Sally E. (September 30, 2016). "Soft Opening Today for Two-Way Branford Train Station". New Haven Independent. Retrieved September 30, 2016.
  58. Mazzacane, Steven (July 31, 2012). "New Ethics Complaint Filed Against Meyer; Meyer Fires Back". The Branford Seven. Retrieved August 9, 2012.
  59. "Public Information Meeting Regarding Improvements to the Clinton Shore Line East Railroad Station". Connecticut Department of Transportation. March 8, 2011. Retrieved October 8, 2012.
  60. Garrety, Karina (April 9, 2014). "Clinton Train Station on Hold". Harbor News. Retrieved May 14, 2014.
  61. O'Connell, Eric (October 17, 2017). "Upgrades to Clinton Train Station to Start in March". Zip06.com. Retrieved November 25, 2017.
  62. "Gov. Malloy, CTDOT Indefinitely Postpone Hundreds of Transportation Projects Across Connecticut". CT.gov. January 10, 2018. Retrieved January 20, 2018.
  63. Mazzacane, Steven (July 31, 2012). "New North Side Platform and Overpass for Branford Train Station". The Branford Seven. Retrieved August 8, 2012.
  64. "Project Description: M-8 Rail Cars" (PDF). Connecticut General Assembly. January 12, 2009. Retrieved August 9, 2009.
  65. Reindl, JC (April 6, 2012). "Niantic could be stop for railroad". The New London Day. Retrieved October 9, 2012.
  66. "$750,000 would go toward Niantic train station plan". The Day. Retrieved January 31, 2016.
  67. "Let's Go CT Transportation Ramp Up Dashboard". www.letsgoct.com. Connecticut Department of Transportation. Retrieved February 2, 2017.
  68. Edwards and Kelcey, Inc (July 2001). "South County Commuter Rail Service Plan" (PDF). Rhode Island Department of Transportation. Archived from the original (PDF) on April 16, 2009. Retrieved July 1, 2016.
  69. Howard, Lee (February 1, 2016). "Rail service to Westerly endorsed by state panel". The Day. Retrieved February 3, 2016.
  70. Stacom, Don (February 1, 2016). "Panel Recommends Shore Line East's Next Stop: Rhode Island". Hartford Courant. Retrieved February 3, 2016.
  71. "South County Commuter Rail Service Operations Plans" (PDF). Rhode Island Department of Transportation. July 2001. p. 37.
  72. Bowen, Douglas John (November 1, 1990). "Commuter rail lines build and rebuild to meet rising demand". Railway Age   via HighBeam Research (subscription required) . Archived from the original on July 14, 2014. Retrieved December 10, 2012.
  73. Middleton, William D. (1994). North American commuter rail 1994. Pasadena, CA: Pentrex. p. 30. OCLC 32665882.
  74. Simon, Elbert; Warner, David C. (2011). Amtrak by the numbers: a comprehensive passenger car and motive power roster, 1971-2011. Kansas City, Missouri: White River Productions. ISBN 978-1-932804-12-6.
  75. "Connecticut State Rail Plan 2012–2016" (PDF). Connecticut Department of Transportation. 2012. p. 220. Retrieved June 26, 2016.
  76. Hartley, Scott A. (March 17, 2016). "Connecticut DOT taking on used P40DCs". Trains. Retrieved March 26, 2016.
  77. "Gov. Rell Tours Yonkers Rail Repair Plant To Review Virginia Railway Express Work". US Fed News Service, Including US State News. May 16, 2006. Archived from the original on September 11, 2016. Retrieved June 26, 2016 via HighBeam Research.
  78. "Notice of Contract Award" (PDF). Connecticut Department of Transportation. April 25, 2018.
  79. "NRE to overhaul Connecticut DOT commuter rail locomotives". Trains News Wire. March 20, 2017.
  80. Stacom, Don (January 7, 2016). "Shore Line East Will Send Trains To Hartford Line, Get New Fleet". Hartford Courant. Archived from the original on January 8, 2016.
  81. Carlson, Lee (March 1, 2017). "The Very First Electric MU Train". Flickr. Retrieved April 5, 2017.
  82. March 20; 2017. "NRE to overhaul Connecticut DOT commuter rail locomotives | Trains Magazine". TrainsMag.com. Retrieved November 12, 2019.CS1 maint: numeric names: authors list (link)
  83. Walmsley, Ebony (August 19, 2013). "New West Haven train station open for business". New Haven Register on-line. Retrieved August 19, 2013.

Further reading

KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.