Line 8 (Shenzhen Metro)

Line 8 of the Shenzhen Metro (also known as the Yantian line) is currently under construction. Line 8 has a length of 12.367 km (7.7 mi) and a total of 7 stations.[2] It connects Liantang station in Luohu District with Yantian Road station in Yantian District. Line 8 is the first line to serve Yantian District.

Line 8
8
Overview
TypeRapid transit
SystemShenzhen Metro
StatusUnder Construction
LocaleShenzhen, China
TerminiLiantang
Yantian Road
Stations7
Operation
Planned openingOctober 2020[1]
Operator(s)SZMC (Shenzhen Metro Group)
CharacterUnderground
Rolling stockTrains service in Line 2
Technical
Line length12.367 km (7.7 mi)[2]
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
Route map

connection to Line 2
Liantang
connection to Line 2
Wutong Hill South
Shatoujiao
Haishan
Yantian Port West
Wangji Lake Stabling Yard
Shenwai Senior High School
Yantian Road
Phase II
(Under Construction)

Construction of Phase 1 started in December 2015, with the line scheduled to open in October 2020.[3][4] Line 8 is planned to connect with Line 2, with trains on Line 2 terminating at Liantang station.

Stations

Phase 1

  • Under construction, opening in October 2020
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Liantang 莲塘  2  (through service) Luohu
Wutong Mountain South 梧桐山南
Shatoujiao 沙头角 Yantian
Haishan 海山
Yantian Port West 盐田港西
Yantian Foreign Languages School 深外高中
Yantian Road 盐田路

Phase 2

  • Under construction, opening in 2024[5]
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Beishan Street 北山道 Yantian
Yantian Food Street 盐田食街
Dameisha 大梅沙
Xiaomeisha 小梅沙

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.