Wenhu line

Wenhu line
Overview
Other name(s) Brown line, Wenshan–Neihu line
Type Light metro/Rapid transit
Status In service
Locale Metropolitan Taipei
Termini Taipei Nangang Exhibition Center
Taipei Zoo
Stations 24
Services Muzha Line, Neihu Line
Operation
Opened 28 March 1996
Operator(s) Taipei Rapid Transit System (TRTC)
Character Elevated and underground
Depot(s) Muzha Depot, Neihu Depot
Rolling stock Matra VAL 256,[1] Bombardier Innovia APM 256[2]
Technical
Line length 25.1 km (15.6 mi)
Track gauge 1,880 mm (6 ft 2 in)[3]
Electrification Third rail (750 volts DC)
Operating speed 80 km/h
Route map
Nangang Exhibition Centre
Nangang Software Park
Keelung River
Sun Yat-Sen Fwy.
Minsheng–Xizhi line to Xizhi or Neigou
Donghu
Minsheng Xizhi line to Dadaocheng
Huzhou
Dahu Park
Neihu
Wende
Gangqian
Xihu
Yellow line
Jiannan Road
Dazhi
Keelung River
Sun Yat-sen Freeway
Songshan Airport
Zhongshan Jr. High School
Songshan-Xindian line to Songshan
Nanjing Fuxing
Songshan-Xindian line to Xindian
Zhongxiao Fuxing
Bannan line to Dingpu
Tamsui-Xinyi line to Xiangshan
Daan
Tamsui-Xinyi line to Tamsui
Technology Building
Liuzhangli
Linguang
Xinhai Rd.
Xinhai
Wanfang Hospital
Wanfang Community
Muzha
Taipei Zoo
Maokong Gondola to Maokong
Wenhu line
Traditional Chinese 文湖線
Simplified Chinese 文湖线
Alternative Chinese name
Traditional Chinese 文山內湖線
Simplified Chinese 文山内湖线
Second alternative Chinese name
Traditional Chinese 棕線
Simplified Chinese 棕线

The Wenhu or Brown line (code BR) is a medium-capacity rapid transit line of Taipei Metro named after the districts it connects: Wenshan and Neihu. It is an automated rubber-tyred metro line and is 25.1 kilometres (15.6 mi) long, serving a total of 24 stations located in 7 districts in Taipei, of which 22 are elevated and 2 underground. As of September 2011, the line transports an average of 180,000 passengers daily.[4][5]

The Wenshan Section began revenue service on 28 March 1996, as the Muzha line. The Neihu Section began revenue service on 4 July 2009. The Wenhu line was formerly named the Muzha–Neihu line, colloquially shortened as the Zhahu line before 8 October 2009.

History

Construction of the Wenshan line began in December 1988 at a cost of NT$42.6 billion.[6] It was plagued by controversy, cost overruns and technical problems from its development up to a few years after its opening.[7] Originally slated to commence passenger service in December 1991, its revenue operation was repeatedly delayed up to 28 March 1996 owing to numerous accidents. Public confidence was shakened as incidents of lightning strikes, computer failures, two instances of rolling stock derailment and catching fire each were reported during the testing phase.[8][6] In 1999, cracks were found on the elevated pillars forcing the line to shut down temporarily.[7]

One of the largest suppliers for the system, Matra, which supplied the VAL 256 rolling stock and electrical systems for the line sued the Department of Rapid Transit Systems of the Taipei City Government for costs overruns claiming to have resulted from the latter failing to provide the necessary infrastructure to build the line.[6][9] Subsequently, the company pulled out of the operation of the line in 1994.[6] Chen Shui Bian, then Mayor of Taipei declared that progress and operation of the line would continue despite the walkout in the now-popular catchphrase "馬特拉不拉,我們自己拉" (lit: If Matra doesn't pull, we'd pull it ourselves). After a 12-year-long legal tussle, in 2005, Matra was awarded NT$1.6 billion (approx. US$50 million) in damages by the Supreme Court of the Republic of China.[10][11]

Services on the Wenshan line began with two-car operation of the VAL 256 coupled together. Eventually, increasing patronage on the system led to operation in four-car configurations. The opening of Maokong Gondola in 2007 have also boosted passenger numbers travelling on the line to Taipei Zoo for transfer.

The Wenshan line is connected to the Neihu Line, which opened in July 2009. It connects to Neihu and Taipei Songshan Airport, which currently has no rapid transit access.[8] Since an alternative contractor Bombardier was awarded to supply the rolling stock and the signaling system for the new line, the Wenshan line's signaling system was converted to suit the new communication-based train control (CBTC) CITYFLO 650 to allow both the old Matra rolling stock and the new Bombardier rolling stock to run in co-existence.[8] On 19 December 2010, fifty-one pairs of retrofitted VAL256's (from the Matra rolling stock) will begin testing on the entire line.[12] After over half a year of testing, the additional trains will decrease the time between trains at rush hour from 2 minutes to 72 seconds and bring the total number of trains operating on the line to 152 pairs.[12]

The long-awaited Neihu line has had many delays prior to its opening. Since the Neihu line was planned as an extension to the Wenshan line, the original plan called for a similar elevated medium-capacity line. However, due to the growth of the Neihu District, many residents and politicians called for an underground, high-capacity line instead (similar to the Blue line).[13]

The initial cost estimate of the elevated line was NT$42.6 billion, but due to delays the price-adjusted cost estimate rose to over NT$60.3 billion. A shift to underground construction would have increased the cost to as high as NT$134.4 billion. However, the Central Government stated that if construction for the Neihu line did not start immediately, they would withhold the grant money for the line. In addition, due to the narrow streets and numerous turns in Neihu, construction of an underground high-capacity line would have been infeasible.[14] Thus, the plan to build an elevated line continued after much delay.[13]

There was also significant debate whether Songshan Airport should be included on the route.[14] The addition of the station added an additional 1.9 kilometres (1.2 mi) to the line's length. Because of the inclusion of the station, the final cost of the line reached NT$66.7 billion.[15]

The line was initially planned to begin service in 1996, and after 13 years of delay, the line finally began operations. However, the Neihu line has been criticised for its frequent malfunctions and safety issues.[14]

Important Dates

  • 23 February 1987: Initial planning of the Neihu line started.
  • 15 December 1988: Construction of the Wenshan line begins. At this time, the Neihu line is planned to open in 1996.
  • 28 September 1993: Because of fires on the trains during trials of the Wenshan line, all Neihu line planning was halted.
  • 9 October 1993: The Department of Rapid Transit Systems (DORTS) announced plans to change the Neihu line to a high-capacity underground line.
  • 23 August 1994: The DORTS announced plans to continue building the Neihu line as a medium-capacity elevated line. Neihu residents protest the change.
  • 26 September 2001: All 12 stations on the Neihu line are finalised.
  • 23 May 2002: Construction begins on the Neihu line.
  • 24 December 2007: The first trial run is conducted between Songshan Airport and Jiannan Road.[16]
  • 28 June 2008: Construction of the Neihu line is completed.[15]
  • 4 July 2009: The Wenshan line is converted to the new Cityflo 650 system from the 13-year-old Matra VAL 256 system. Service on the Neihu line begins.
  • 10 July 2009: Because of system problems, service on the Brown line was halted at 15:30 until 18:30 the next day.[17]
  • 19 December 2010: Retrofitted VAL 256 cars begin testing on the Brown line. It is expected to decrease waits between trains and increase line capacity.[18]

Rolling stock

The line was operated by the 2-car driverless VAL 256 built in 1993. A total of 102 cars were built with a maximum capacity of 114 passengers each. The fleet ran on rubber-tyred track at a maximum speed of 80 km/h.

With the opening of the Neihu line, the entire line switched over to the new automatic train control CITYFLO 650 using Innovia APM 256 trains (produced by Bombardier). As of 19 December 2010, trials are being run on retrofitted VAL 256 trains modified to run on both the Muzha and Neihu lines.[18] The trains are expected to fully enter revenue service after testing by 26 December 2010.[18][19] On 26 December 2010, the line will operate with 6 pairs of the retrofitted VAL 256's and 25-29 pairs of the Innovia 256's. By December 27, the ratio is expected to increase, with 10 pairs of VAL 256's and 40 pairs of the Innovia 256's.[19]

The Wenhu line is one of only two lines worldwide to use the VAL 256s, the other being O'Hare International Airport's Airport Transit System.

Stations

CodeStation NameTransferLocation Distance in km

(Approximate)

EnglishChinese
BR24Nangang Exhibition Center南港展覽館 (BL23) Nangang 25.1
BR23Nangang Software Park南港軟體園區 24.4
BR22Donghu東湖 Neihu 23.4
BR21Huzhou葫洲 22.6
BR20Dahu Park大湖公園 20.9
BR19Neihu內湖 20.0
BR18Wende
(Bihu Park)
文德
(碧湖公園)
18.9
BR17Gangqian港墘 17.8
BR16Xihu
(Takming University)
西湖
(德明科大)
17.0
BR15Jiannan Road
(Miramar)
劍南路
(美麗華)
 Y  [planned] Zhongshan 15.8
BR14Dazhi
(Shih Chien University)
大直
(實踐大學)
14.5
BR13Songshan Airport松山機場 TSA Songshan 12.0
BR12Zhongshan Junior High School中山國中 Zhongshan
Songshan
10.5
BR11Nanjing Fuxing南京復興 (G16) 9.6
BR10Zhongxiao Fuxing忠孝復興 (BL15) Da'an 8.3
BR09Daan大安 (R05) 7.4
BR08Technology Building科技大樓 6.6
BR07Liuzhangli六張犁 Da'an
Xinyi
5.5
BR06Linguang麟光 4.7
BR05Xinhai辛亥 Wenshan 3.1
BR04Wanfang Hospital萬芳醫院 2.3
BR03Wanfang Community萬芳社區 1.2
BR02Muzha木柵 0.7
BR01Taipei Zoo動物園  Y  [planned]
 Maokong Gondola 
0.0

References

  1. "Taipeï - en - Siemens".
  2. "Automated Metro - Taipei, Taiwan".
  3. 內湖線則採用膠輪/鋼軌系統,中心線間距為1,880mm。此外,文山線因採膠輪/水泥軌道系統,一般來說並無軌距之分,但其凸出於路面的兩條行車水泥軌枕,中心線間距為1,880mm。
  4. "None". Taipei Rapid Transit Corporation. 2011-09-15. Retrieved 2011-11-15.
  5. "Medium/High Capacity System Ridership Statistics". english.metro.taipei. 16 August 2011. Retrieved 16 April 2017.
  6. 1 2 3 4
  7. 1 2 Once again, MRT breaks down, Erin Prelypchan, Taipei Times, 4 December 1999, p. 2
  8. 1 2 3
  9. High Court orders compensation in fight over MRT line, Joy Su, Taipei Times, 9 April 2004, p. 1
  10. Matra wins final appeal against city government, Rich Chang, 24 July 2005, Taipei Times, p. 1
  11. 木柵捷運馬特拉案 北市府認賠20億 每位市民賠790元, ETTV News, 17 August 2005
  12. 1 2 文湖線馬特拉舊車 今天檢核 (in Chinese). 自由時報. 2010-12-19. Retrieved 2010-12-18.
  13. 1 2 "內湖捷運線採高架中運量系統".
  14. 1 2 3 "捷運內湖線細說從頭". Department of Rapid Transit Systems. 2009-09-01. Retrieved 2010-06-20.
  15. 1 2 "Route Map: 內湖線工程". East District Project Office, Department of Rapid Transit Systems. 2009-06-11. Archived from the original on 1 June 2009. Retrieved 2009-07-13.
  16. "內湖線松山機場站至劍南路站 電聯車運轉紀實". Department of Rapid Transit Systems. 2008-06-01. Retrieved 2010-06-19.
  17. Mo Yan-chih (11 July 2009). "MRT malfunction strands hundreds". Taipei Times. Retrieved 10 January 2016.
  18. 1 2 3 "Wenhu line integrated for faster service". The China Post. 2010-12-21. Retrieved 2010-12-21.
  19. 1 2 文湖線馬特拉列車 26日上線 (in Chinese). The China Times. 2010-12-22. Retrieved 2010-12-23.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.