Kamikita Expressway


Kamikita Expressway
上北自動車道
Route information
Maintained by Ministry of Land, Infrastructure and Transport
Length 7.7 km[1] (4.8 mi)
Existed March 24, 2013 – present
West end Kamikita Interchange
Aomori Prefecture Route 211 in
Tōhoku, Aomori
East end Rokunohe Interchange
Daini-Michinoku Toll Road in Rokunohe, Aomori
Tenmabashi Unbuilt Section
Length 16.1 km[2] (10.0 mi)
West end National Route 4/
Michinoku Toll Road in
Shichinohe, Aomori
East end Kamikita Interchange
Aomori Prefecture Route 211
Tōhoku, Aomori
Highway system
National highways of Japan
Expressways of Japan

The Kamikita Expressway (上北自動車道 Kamikita Jidōshyadō) is a free two-lane expressway in Aomori Prefecture connecting the towns Tōhoku and Rokunohe. Alongside other tolled-roads, the expressway is part of a series of highways that will link the Hachinohe Expressway to the Aomori Expressway. The road is managed by the Ministry of Land, Infrastructure and Transport and is numbered as an extension of the Tōhoku Expressway. It runs concurrent with an extension of Japan National Route 45. [3]

History

The Kamikita Expressway was designated in 1987 as part of a single expressway running from the capital city of Aomori Prefecture, Aomori to the prefecture's second largest city, Hachinohe, Aomori.[4] The first section of the expressway opened in 2013, two years ahead of schedule. This section connects the Daini-Michinoku Toll Road to Aomori Prefecture Route 211.

Future

Currently, the expressway is under construction between Aomori Prefecture Route 211 and National Route 4. The section between Route 211 and National Route 394 is scheduled to open in 2018. The remaining section between Routes 4 and 394 has no set completion date.[5]

Junction list

The entire expressway is in Aomori Prefecture.

LocationkmmiExitNameDestinationsNotes
Through to Daini-Michinoku Toll Road
Rokunohe00.0Rokunohe Daini-Michinoku Toll RoadOirase, Hachinohe
42.5Rokunohe-MisawaAomori Prefecture Route 22
Tōhoku7.74.8KamikitaAomori Prefecture Route 211
12.67.8Kamikita 2Aomori Prefecture Route 121Under construction, scheduled completion date is 2018.
Shichinohe15.59.6Tenmabashi 1 National Route 394Under construction, scheduled completion date is 2018.
23.814.8Tenmabashi 2[6] Michinoku Toll Road/ Shimokita Expressway/ National Route 4Aomori, MutsuUnder construction as of May 2018.
Through to Michinoku Toll Road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Route map:

KML is not from Wikidata

References

  1. http://www.jiti.co.jp/graph/page1412/1204k/index.htm
  2. http://www.jiti.co.jp/graph/page1412/1204k/index.htm
  3. "Japan's Expressway Numbering System". www.mlit.go.jp. Retrieved 9 March 2018.
  4. "第四次全国総合開発計画" [Fourth National Comprehensive Development Plan] (PDF). www.mlit.go.jp (in Japanese). Retrieved 9 March 2018.
  5. http://www.thr.mlit.go.jp/aomori/syutu/towada/kojisintyoku/pdf/image6.jpg
  6. http://www.jiti.co.jp/graph/page1412/1204k/index.htm
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.