GSAT-19

GSAT-19
Mission type Communications
Operator INSAT
COSPAR ID 2017-031A
SATCAT no. 42747
Website GSAT-19
Mission duration Planned: 10 years[1]
Elapsed: 1 year, 4 months, 7 days
Spacecraft properties
Bus I-3K
Manufacturer ISRO Satellite Centre
Space Applications Centre
Launch mass 3,136 kg (6,914 lb)[1]
Dry mass 1,394 kg (3,073 lb)[1]
Dimensions 2.0 × 1.77 × 3.1 m (6.6 × 5.8 × 10.2 ft)[1]
Power 4,500 watts[1]
Start of mission
Launch date 5 June 2017, 11:58 (2017-06-05UTC11:58) UTC[2]
Rocket GSLV Mk III-D1[3]
Launch site Satish Dhawan SLP
Contractor ISRO
Orbital parameters
Reference system Geocentric
Regime Geostationary
Longitude 48° E[4]
Perigee 35,470 km (22,040 mi)
Apogee 35,869 km (22,288 mi)
Inclination 0.101 deg
Period 23 hr, 50 min, 10 sec
Epoch 10 June 2017, 02:29 UTC[5]
Transponders
Band
Coverage area India

GSAT-19 is an Indian communications satellite launched by the Indian Space Research Organisation aboard a Geosynchronous Satellite Launch Vehicle Mark III on 5 June 2017.[2]

Satellite and payloads

The satellite will act as a testbed for the modular I-6K satellite bus, carrying experimental technologies such as ion thrusters for manoeuvring and stabilisation, active thermal control using thermal radiators, a miniaturised inertial reference unit, indigenously produced lithium-ion batteries, and C-band traveling-wave-tube amplifiers.[6][7][8]

Rather than traditional transponders, GSAT-19 carries four Ku/Ka-band forward link beams and four Ku/Ka-band return link beams, providing much higher data throughput than India's previous communications satellites.[9][10] It additionally carries a Geostationary Radiation Spectrometer (GRASP) payload, which will "monitor and study the nature of charged particles and the influence of space radiation on satellites and their electronic components".[11]

Orbit raising and station keeping

The satellite was launched aboard the GSLV Mk III-D1 rocket in the evening of 5 June 2017 to a geostationary transfer orbit perigee of 180 km (112 mi). This was followed by a series of orbit raising operations (using an on-board LAM and chemical thrusters[1]) to place the satellite in the intended geostationary orbital slot.

Op # Date/
Time (UTC)
LAM burn time Height achieved Inclination
achieved
Orbital period References
ApogeePerigee
16 June 2017
08:33
116 sec35,938 km (22,331 mi)172.77 km (107.35 mi)21.56°10 hr, 30 min[12]
27 June 2017
10:14
5538 sec35,840 km (22,270 mi)10,287 km (6,392 mi)7.02°13 hr, 58 min[13]
39 June 2017
04:25
3469 sec35,875 km (22,292 mi)30,208 km (18,770 mi)0.793°21 hr, 38 min[14]
410 June 2017
02:29
488 sec35,869 km (22,288 mi)35,470 km (22,040 mi)0.101°23 hr, 50 min, 10 sec[5]

References

  1. 1 2 3 4 5 6 "GSLV Mark III-D1 / GSAT-19 Mission" (PDF). Indian Space Research Organisation.
  2. 1 2 Clark, Stephen (5 June 2017). "India's launcher fleet gets an upgrade with successful test flight". Spaceflight Now. Retrieved 6 June 2017.
  3. Laxmi Ajai, Prasannal (19 May 2017). "Come June 5, ISRO to launch 'game changer' rocket". The Times of India. Times News Network. Retrieved 21 May 2017.
  4. "Delivered Communication and Navigation Payloads". ISRO/Space Applications Centre. Retrieved 6 June 2017.
  5. 1 2 "The fourth and final orbit raising operation..." Indian Space Research Organisation. 10 June 2017. Retrieved 12 June 2017.
  6. "Annual Report: 2014-2015" (PDF). Indian Space Research Organisation. 2015. p. 26.
  7. "First Prototype of ISRO's Semi-Cryogenic Engine To Be Ready By 2016". AA Me, IN. 19 August 2015. Retrieved 26 October 2016.
  8. "GSat 19". Gunter's Space Page. Retrieved 27 May 2016.
  9. "Isro's GSAT-19, GSAT-11 satellites: Game changers in communications". The Times of India. Press Trust of India. 5 June 2017. Retrieved 26 June 2017.
  10. Graham, William (5 June 2017). "GLSV Mark III rocket conducts 'all-up' launch with GSAT-19 satellite". NASASpaceFlight.com. Retrieved 26 June 2017.
  11. Ramachandran, R. (26 June 2017). "ISRO's Mk III Launched a Little-Known Instrument Called GRASP – This Is What It Does". The Wire. Retrieved 26 June 2017.
  12. "The first orbit raising operation..." Indian Space Research Organisation. 8 June 2017. Retrieved 12 June 2017.
  13. "The second orbit raising operation..." Indian Space Research Organisation. 8 June 2017. Retrieved 12 June 2017.
  14. "The third orbit raising operation..." Indian Space Research Organisation. 10 June 2017. Retrieved 12 June 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.