Dry Lake Wind Power Project

Dry Lake Wind Power Project
Country United States of America
Location between Holbrook and Heber, Arizona
Coordinates 34°36′0″N 110°13′48″W / 34.60000°N 110.23000°W / 34.60000; -110.23000Coordinates: 34°36′0″N 110°13′48″W / 34.60000°N 110.23000°W / 34.60000; -110.23000
Status Operational
Commission date October 2009
Owner(s) Iberdrola Renewables
Power generation
Units operational Phase 1: 30 Suzlon wind turbines, @2.1 MW
Nameplate capacity Phase 1: 63 MW
Annual net output 127MW[1]
Website
Iberdrola

Dry Lake Wind Power Project in Navajo County is Arizona's first utility-scale wind farm. Phase 1 consists of 30 Suzlon 2.1 MW wind turbines, for a total nameplate capacity of 63 MW.[2][3] Iberdrola Renewables built the wind farm for $100 million,[2] and sells the output to Salt River Project.

Based on wind measurements before construction began, Iberdrola estimates phase 1 will produce an average of 132,450 MWh annually.[2] This implies a capacity factor of:

History

Around 2003, rancher Bill Elkins began working with developer John Gaglioti and Northern Arizona University scientists to erect measurement towers on his land to measure wind speeds. He studied the local power grid to determine the feasibility of connecting a wind farm. Navajo County and Iberdrola officials credit Gaglioti and Elkins with attracting the first wind farm to Arizona.[2]

Future development

As of 2009, Iberdrola planned to install 209 more turbines in future construction phases.[2]

Phase 2 will consist of up to 31 Suzlon wind turbines for a combined nameplate capacity of 65 MW.[4] The location of phase 2 (34°36′N 110°10′W / 34.60°N 110.16°W / 34.60; -110.16 (Dry Lake Wind Power Project phase II)) will be about seven miles (11 km) northwest of Snowflake and three miles (5 km) east of phase 1.[4]

Environmental effect

According to the USDOE, each 1000 MW of wind power capacity installed in Arizona will save 818 million US gallons (3,100,000 m3) of water per year and eliminate 2.0 million tons of carbon dioxide emissions.[5] Phase 1 of Dry Lake Wind Power Project would then eliminate:

of carbon dioxide, and save:

of water annually.

See also

References

  1. http://www.srpnet.com/environment/windfarm.aspx
  2. 1 2 3 4 5 Randazzo, Ryan (2009-05-12). "Harvesting Arizona wind". Arizona Republic. Retrieved 2010-05-04.
  3. "U.S. Wind Energy Projects - Arizona". American Wind Energy Association. 2009-12-31. Retrieved 2010-05-04.
  4. 1 2 "SRP Buys Entire Output of Iberdrola Renewables' Dry Lake 2 Wind Power Project". Iberdrola Renewables. 2010-03-18. Retrieved 2010-05-04.
  5. Lantz, Eric; Tegen, Suzanne (October 2008). "Economic Benefits, Carbon Dioxide (CO2) Emissions Reductions, and Water Conservation Benefits from 1,000 Megawatts (MW) of New Wind Power in Arizona" (PDF). EERE, NREL. DOE/GO-102008-2670. Archived from the original (PDF, 514kB) on 2010-05-28. Retrieved 2010-05-06.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.