Tide Light Rail

The Tide
Tide Light Rail train during a test run in January 2011
Overview
Type Light rail
System Hampton Roads Transit
Status Operational
Locale Norfolk, Virginia
Termini EVMC / Fort Norfolk (west)
Newtown Road (east)
Stations 11
Services 1
Website The Tide - Hampton Roads Transit
Operation
Opened August 19, 2011[1]
Owner Hampton Roads Transit
Operator(s) Hampton Roads Transit
Rolling stock Siemens S70
Technical
Line length 7.4 mi (11.9 km)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 750 V DC, overhead catenary
Route map

EVMC / Fort Norfolk
York Street/Freemason
Monticello
MacArthur Square
Civic Plaza
Harbor Park
NSU
Ballentine / Broad Creek
Ingleside Road
Broad Creek
Military Highway
Newtown Road

The Tide is a 7.4 mi (12 km) light rail line in Norfolk, Virginia, connecting Eastern Virginia Medical School, Downtown Norfolk, Norfolk State University, and Newtown Road. Service began on August 19, 2011,[1] making it the first light rail system in Virginia.

The Tide is owned and operated by Hampton Roads Transit (HRT). Fares match local bus fares and the line accepts HRT's GO Passes. Trains generally run every 15 minutes, increasing to every 10 minutes during peak periods and every 30 minutes during early mornings and late evenings.

History

The Tide's current route

After Virginia Beach pulled out of a proposal that would have seen the construction of a light rail line connecting downtown Norfolk with the Virginia Beach oceanfront in 1999, Norfolk began developing a network that would be constructed entirely within its city limits.[2]

Beginning in 2000, HRT and federal transit officials worked to create a plan that would attract federal funding. On September 22, 2006, the Federal Transit Administration announced that the proposal met federal criteria for design, and would receive funding for a final design.[2] On October 1, 2007, the FTA signed the agreement to appropriate $128 million for the construction of the network.[3] The remainder of the project will be divided three ways, with the city of Norfolk contributing $33 million, the Commonwealth of Virginia contributing $31.9 million, and $39.2 million being contributed from other federal sources.[3]

Officials announced in June 2007 that the system would be called The Tide, a name that beat out other proposed names, including Bay Runner, First Rail, Dash, Bay Breeze, Sail and Shore Line.[4]

Construction problems

The line had been planned to open in January 2010, but cost overruns and extended testing of trains and electronic signage required three delays.

In January 2010, HRT's executive director, Michael Townes, was pressured by the Board of Directors and ultimately agreed to step down after the project overshot its budget by $100 million and missed by one year its operational deadline. A majority of the board members cited poor management and communication on his part. He was to serve at full pay and benefits helping with a transition and continue to seek additional funding until September 2010, after which the Board agreed to a severance package of full pay and benefits for another full year.[5] As an interim measure, the Board hired former VDOT Commissioner Philip Shucet for 1 year effective February 1, 2010 at the rate of $40,000 per month to lead the agency, with a mandate to restore financial integrity and communication pending selection of a new Executive Director.[6]

In May 2010 elections, voters ousted Norfolk city councilman Randy Wright, a long-time incumbent, HRT board member, and light rail supporter. His opponent, also an advocate of light rail, cited the waste and delays under Towne's administration. Another HRT board member, Paige Washington, also lost a reelection bid in Hampton. News media sources reported that "Three million dollars [of HRT funds designated for projects on the Virginia Peninsula] were diverted to Norfolk to [help] pay for its light rail cost overrun".[7]

Opening

On June 21, 2011, HRTs announced the line would open on August 19 initially with demonstration rides followed by regular service beginning on August 22.[1] Due to high ridership during the initial demonstration period, estimated at over 46,000 riders, the demonstration period was extended, with regular service to begin on August 28.[8]

On September 21, 2011, Hampton Roads Transit announced the introduction of online ticketing and onboard WiFi to The Tide.[9]

Financing

The Tide cost $318 million to construct, and is estimated to cost $6.2 million a year to operate.

The line was primarily financed by a $232 million grant from the Federal Transit Administration approved in October 2007.[10] Additional federal funding came from a $32.8 million grant from the American Recovery and Reinvestment Act.[10] The final cost of the project was estimated to be $318.5 million, $106 million over the original estimate[8] or approximately just under $27 million per kilometer ($43 million per mile)."[8]

Rolling stock

In September 2007, HRT’s commission voted to purchase nine Siemens-built S70 vehicles, similar to those currently in operation in Houston, Texas and Charlotte, North Carolina.[3] These vehicles formed The Tide's initial fleet of light rail vehicles. The first car arrived on October 6, 2009.[11]

Service

The trains generally run every 15 minutes; they run every 10 minutes during peak periods and every 30 minutes during early weekend mornings and late evenings.[12] Light rail service is offered from 6:00 a.m. through 10 p.m Mondays through Thursdays, 6:00 a.m. through midnight on Fridays and Saturdays, 7:00 a.m through 9:00 p.m. on Sundays, and 9:00 a.m. through 9:00 p.m. on federal holidays.[12]

Ridership

Daily ridership in 2011 was projected at 2,900 passengers.[13] Actual daily ridership up to April 17, 2012 was approximately 4,900,[14] allowing the service to reach its goal of 1 million rides 150 days earlier than had been projected.

Route

Part of the Tide's original route parallels I-264.

The Tide is designed with the hope that TOD (Transit-oriented development) will be constructed along the light rail line, creating a smart growth transit corridor to help guide growth using compact mixed-use development practices, as well as curbing traffic congestion.

Most of the Tide's route east of downtown Norfolk operates on newly-laid track along the former Norfolk Southern Railway line that runs due east to the resort area of Virginia Beach. The Norfolk Southern Railway had previously abandoned that line. That right-of-way had carried both freight and passenger traffic until the end of World War II, and then operated as a freight-only railway for several additional decades. The current eastern end of The Tide is at Newtown Road, which is the Norfolk-Virginia Beach boundary line.

By contrast, The Tide's route from the Harbor Park area west within downtown Norfolk and north-west to the Medical Center area is entirely new right-of-way.

Future expansion

The Commonwealth of Virginia's Department of Rail & Public Transportation is studying possible extensions to The Tide in several different directions within the multi-city Hampton Roads area.[15]

Hampton Roads Transit, the Hampton Roads Transportation Planning Organization, and local cities are exploring extensions of the starter line. Possible extensions might run north to the Norfolk Naval Base, east to the Virginia Beach oceanfront and resort area, west to Portsmouth, and south to Chesapeake.

The Tide Light Rail - Ticket Vending Machine

Chesapeake

One possible extension would run south from Norfolk, probably terminating in the Greenbrier area of Chesapeake, Virginia.[15]

Norfolk

A second possible extension would continue The Tide from the Medical Center terminus to Naval Station Norfolk,[15] which would connect Old Dominion University to the light rail service. The naval base is one of the largest employers in the Hampton Roads area and ODU is a large public university.

Peninsula

The Peninsula Rapid Transit Project is exploring the feasibility of light rail in Newport News. Likely stops for The Tide on the Peninsula would include downtown Newport News, the Newport News Amtrak passenger railway station, the Oyster Point area, and Newport News/Williamsburg International Airport. An extension between downtown Newport News and downtown Hampton is also being considered.[15]

Virginia Beach

This proposed LRT extension would continue along the former Norfolk Southern (NS) Railway right of way. Major stops would be located at the "Town Center" project in the Pembroke area, near Oceana Naval Air Station, and would terminate in the resort area at the Virginia Beach Convention Center, a few blocks west of the Atlantic Ocean.[15] A possible spur would branch at the NS Railway's Oceana Junction (just east of London Bridge Road and just north of Potters Road) and use the existing abandoned railway right-of-way along the west side of Oceana Naval Air Station to the south. As another possible LRT extension, most of the former NS Railway line from the Witchduck Road area south to the Virginia Beach Municipal Center remains currently undeveloped.

The city of Virginia Beach may extend The Tide light rail service east from the Newtown Road terminus. Virginia Beach's mayor, Will Sessoms, said that the city hoped to purchase the right of way. The city subsequently purchased the tracks for $40 million, using $10 million of local tax funds which would allow a total rail length of about 18 miles (29 km). The extension is estimated to cost $254 million to the Town Center and $807 million to the Oceanfront.[16]

History

In November 1999, the City of Virginia Beach conducted a referendum regarding the construction and operation of light rail into Virginia Beach along the Norfolk Southern railroad right-of-way. The proposed route would connect downtown Norfolk to the Virginia Beach oceanfront. The referendum led to a community discussion of the proposed light rail and feeder bus system. Local media and many special interest groups debated the matter in great detail, using information provided by a DEIS (Draft Environmental impact statement). The voters of Virginia Beach rejected the proposed light rail system. The Virginia Beach City Council then passed a 10-year resolution declaring that the city would no longer have any future involvement in the proposed light rail line.

Years later, a major economic and development hub has been built along the Norfolk Southern rail corridor, known as the Virginia Beach Town Center. The new Town Center, along with record high gas prices in 2008, has now made many Virginia Beach residents that opposed the rail line have second thoughts on the plan. A renewed public interest in light rail has been stirred up as some that were opposed to rail see the viewpoint of proponents. A new referendum on light rail will not necessarily be needed in Virginia Beach due to the 10-year expiration of the previous referendum.

Since then, the City of Virginia Beach agreed to purchase the portion of the former Norfolk Southern Railway right-of-way within Virginia Beach from Norfolk Southern. This line extends from the Norfolk/Virginia Beach boundary (near the end of the light rail line in Norfolk), continuing almost due east through the Pembroke Town Center area to Birdneck Road, ending very near the waterfront area of the resort city. However, no firm plans (e.g. for LRT, Bus Rapid Transit, or other uses) have been announced for the purchased right-of-way.

In April 2012, the Virginia Beach City Council voted 10–1 to allow voters to determine the fate of the extension in the November 2012 general election.[16]

In the April 2011 State of the City, Sessoms said "whether the corridor is eventually developed with Bus Rapid Transit or a light rail line is unknown at this time," citing cost and ridership issues.[17] In April 2011, HRT paused the study until 9–12 months of ridership data from The Tide light rail in Norfolk is collected. This will allow the travel forecasting model for any extension to be calibrated based on actual ridership. During this pause, HRT will work on improving the definition of the alternatives under study. After the data has been collected, HRT will restart the VBTES, currently anticipated in the third quarter of 2012. The study is expected to be completed by the end of 2013.

On November 6, 2012 Virginia Beach voters approved a non-binding referendum supporting expansion of light rail into Virginia Beach by a 62% majority. A study to fix costs for the project will be completed in 2014.[18] The State of Virginia has pledged $155 million towards the extension to Virginia Beach, as well as lending up to $30 million from the Virginia Transportation Infrastructure Bank.[19] The final route selected by the Virginia Beach City Council was the 3.5 mile short extension to the Town Center at Virginia Beach in mid-2015.[19][20][21]

On November 8, 2016, after a successful vote four years earlier and a 30% Preliminary Design finished a month earlier, 57% of Virginia Beach voters disapproved the referendum regarding to use city funds to pay part of the Town Center extension, which would have been close to $90 million. As a result, all work on the light rail extension has been stopped, including discontinuing the order for three more light rail cars and Virginia's Secretary of Transportation Aubrey Layne reappointed the $155 million back to the Smart Scale program for transportation funding throughout the Commonwealth. The cost of extending the line was $243.1 million, with around $80 million per mile. As of December 2016, Virginia Beach City Council has several months to decide what to do with the former railroad right-of-way, such as a bike trail or bus rapid transit. If they could not decide, the city must refund the $20 million back to the Commonwealth of Virginia. [22]

See also

References

  1. 1 2 3 "Norfolk light rail to debut Aug. 19". Trains Magazine. June 21, 2011. Retrieved July 3, 2011.
  2. 1 2 Messina, Debbie (September 26, 2006). "Norfolk light-rail line passes federal review, years of delay". The Virginian-Pilot.
  3. 1 2 3 Messina, Debbie (September 30, 2007). "Norfolk's light rail gets the green light". The Virginian-Pilot.
  4. "Norfolk light rail nears reality; it now has a name, too". The Virginian-Pilot. June 27, 2007.
  5. Messina, Debbie (January 12, 2010). "HRT head Michael Townes, under fire, agrees to retire". The Virginian-Pilot. Retrieved August 20, 2011.
  6. Messina, Debbie (January 29, 2010). "Former VDOT chief picked as interim leader of HRT". The Virginian-Pilot. Retrieved August 20, 2011.
  7. Anderson, Michael (March 23, 2010). "Letters to the Editor:Woodbury's HRT". Daily Press. Retrieved August 20, 2011.
  8. 1 2 3 "The Tide comes in". Railway Gazette International. August 22, 2011. Archived from the original on August 23, 2011. Retrieved August 24, 2011.
  9. "Norfolk's 'The Tide' light-rail line makes changes, adds WiFi". Trains Magazine. September 21, 2011. Retrieved September 23, 2011.
  10. 1 2 "The Tide opens in Norfolk". Progressive Railroading. August 19, 2011. Archived from the original on August 23, 2011. Retrieved August 24, 2011.
  11. Messina, Debbie (October 7, 2009). "Light-rail cars arrive in Norfolk". The Virginian-Pilot. Retrieved March 2, 2010.
  12. 1 2 "Tide Map & Schedule". Hampton Roads Transit. Retrieved July 26, 2011.
  13. Hixenbaugh, Mike (August 20, 2011). "Crowds continue lining up for a ride on light rail". The Virginian-Pilot.
  14. "One Million Tide Rides", Hampton Roads Transit April 16, 2012
  15. 1 2 3 4 5 "Hampton Roads Regional Vision Plan" (PDF). Virginia Department of Rail and Public Transportation. Fall 2010. Retrieved August 20, 2011.
  16. 1 2 "Virginia Beach to vote on LRT". Railway Age. April 27, 2012. Retrieved May 6, 2012.
  17. Sessoms, William D. Jr. (April 14, 2011). "Full Text: Virginia Beach State of the City Address". AltDaily. Retrieved August 20, 2011.
  18. Souza, Gabriella (November 7, 2012). "Full Text: Light Rail Passes Easily In Virginia Beach". PilotOnline. Retrieved November 27, 2012.
  19. 1 2 "Virginia firms up commitment to Norfolk light rail extension". Trains Magazine. April 16, 2015. Retrieved April 24, 2015.
  20. Nyczepir, Dave (March 16, 2016). "Virginia Beach Official Faces Millennial Backlash Over Transit Comments". Route Fifty. Washington, D.C.: Atlantic Media. Retrieved March 21, 2016.
  21. Skelton, Alissa (April 5, 2016). "Virginia Beach council signals it wants to move forward with light rail". The Virginian-Pilot. Retrieved April 6, 2016.
  22. Pascale, Jordan (November 9, 2016). "Transportation Secretary Directs State to Stop Work on Virginia Beach-Light Rail Project". Virginian Pilot.

Route map:

KML is from Wikidata
Extensions
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.