Sloane stop

Sloane
The black & orange bollards mark the alignment of the future LRT tracks and platforms
Location Eglinton Avenue East at
Bermondsey Rd/Sloane Ave
Toronto, Ontario
Canada
Coordinates 43°43′33″N 79°18′45″W / 43.72583°N 79.31250°W / 43.72583; -79.31250Coordinates: 43°43′33″N 79°18′45″W / 43.72583°N 79.31250°W / 43.72583; -79.31250
Platforms Centre platform
Tracks 2
Connections TTC buses
Construction
Structure type At grade
Disabled access Yes
Other information
Status Under construction
History
Opening 2021[1]
Services
Preceding station   TTC   Following station
toward Mount Dennis
Eglinton
Opens 2021
toward Kennedy

Sloane is a surface light rail transit (LRT) stop to be constructed on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located in the Victoria Village neighbourhood at the intersection of Eglinton Avenue and Bermondsey Road/Sloane Avenue.[2] It is scheduled to open in 2021.

Metrolinx plans to locate the stop in the middle of Eglinton Avenue East on the east side of its intersection with Bermondsey Road and Sloane Avenue. The stop will have a centre platform. Access to the platforms will be via the pedestrian crossing on the east side of the signalized street intersection. As of January 14, 2016, Metrolinx says these plans are still subject to change.[2]

During the planning stages for Line 5 Eglinton, the stop was given the working name "Bermondsey" after Bermondsey Road on the south side of Eglinton Avenue. On January 14, 2016, the Metrolinx board of directors approved changing the stop name to "Sloane" after Sloane Avenue on the north side.[3]

Surface connections

The following routes would serve this station according to the report presented at the board meeting on February 25, 2016:[4]

Route Name Additional Information
91 Woodbine Northbound to York Mills Road and southbound to Woodbine station

References

  1. "Line 5 Eglinton Station Names" (PDF). Board Presentation. Toronto Transit Commission. November 23, 2015. Retrieved January 12, 2017.
  2. 1 2 "Bermondsey Stop". Eglinton Crosstown. January 14, 2016. Retrieved November 4, 2017.
  3. Mackenzie, Robert (January 14, 2016). "???". Transit Toronto. Retrieved November 4, 2017.
  4. "Changes to TTC Bus Routes in Eglinton Corridor for Line 5 Rapid Transit Line" (PDF). Toronto Transit Commission. February 25, 2016.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.