Minangkabau Airport Rail Link

Minangkabau Express
Minangkabau Express DMU during testrun at Cirebon.
Overview
Native name KA Minangkabau Ekspres
Type Express rail
System Airport rail link
Status Operational
Locale West Sumatera, Indonesia
Termini BIM
Padang
Services BIM - Duku - Tabing - Padang
Website www.kai.id
Operation
Opened 21 May 2018 (2018-05-21)
Owner PT Kereta Api Indonesia & PT Angkasa Pura II
Operator(s) PT Kereta Api Indonesia [id]
Character Ground
Rolling stock Two INKA DMU
4-carriage trainsets
Technical
Line length 23 km (14 mi)
Track gauge 1,067 mm (3 ft 6 in)
Electrification NIL
Operating speed 60 km/h (37 mph)

Minangkabau Express
BIM
Duku
ps. Lubuk Buaya
Tabing
ps. Air Tawar
ps. Pasar Alai
Padang Indonesian Railway Company
to Pulau Air

Minangkabau Express (Indonesian: KA Minangkabau Ekspres) is an airport rail link service in West Sumatra, Indonesia. This line was built to cut travel time from Padang city centre to the Minangkabau International Airport, as roads connecting the airport and the city center are frequently affected by traffic congestion.

The Minangkabau Express is the third airport rail link in Indonesia after Kualanamu ARS and Soekarno–Hatta ARS. It was inaugurated by President Joko Widodo on 21 May 2018.[1]

Background

The 23-km link was established using existing and new rail tracks. An existing line between Duku railway station and Padang was upgraded. This was then connected to a new 3.9 km trackage between Duku and the airport. All land acquisitions were done in March 2017.[2][3]

The service is provided by PT Kereta Api Indonesia. The rolling stock was manufactured by INKA.

Fares

Minangkabau Express Fares[4]
Sector Padang Tabing Duku
Tabing Rp5,000 Rp5,000
Duku Rp10,000 Rp5,000
BIM Rp20,000 Rp15,000 Rp10,000

Schedule [5]

Padang - BIM route

Train No.

Sector B14 B16 B18 B20 B22
Arr. Dep. Arr. Dep. Arr. Dep. Arr. Dep. Arr. Dep.
Padang-06.15 - 08.35 - 11.10 - 13.20 - 16.20
Tabing06.2906.31 08.49 08.51 11.24 11.26 13.34 13.36 16.34 16.36
Duku06.4606.48 09.06 09.08 11.41 11.43 13.51 13.53 16.51 16.53
BIM06.55- 09.15 - 11.50 - 14.00 - 17.00 -
BIM - Padang route

Train No.

Sector B13 B15 B17 B19 B21
Arr. Dep. Arr. Dep. Arr. Dep. Arr. Dep. Arr. Dep.
BIM-07.40 - 09.45 - 12.10 - 14.45 - 17.55
Duku07.47 07.49 09.52 09.54 12.17 12.19 14.52 14.54 18.02 18.04
Tabing08.0408.06 10.09 10.11 12.34 12.36 15.09 15.11 18.19 18.21
Padang08.20- 10.25 - 12.50 - 15.25 - 18.35 -

See also

References

  1. Agustiyanti (2018-05-22). "Tiket Kereta Bandara Minangkabau Hanya Rp10 Ribu". CNN Indonesia. Retrieved 2018-05-22.
  2. Rep: Umi Nur Fadhilah, Red: Hazliansyah (13 August 2015). "Pembangunan Stasiun KA Bandara Minangkabau Resmi Dimulai".
  3. Ali Hidayat (13 October 2015). "Minangkabau Airport to have Train Access by 2016".
  4. Berapakah Tarif KA Bandara Minangkabau dan LRT Palembang?
  5. https://www.instagram.com/p/BhDk3kXDZMO/?hl=id&taken-by=kpkd2sb
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.